Professional Documents
Culture Documents
Manthan Gandhi
Roll No. I214
MBA TECH. IT
70471118017
Technical Internship Program|2021
Goals:
VIDS in upcoming times will be able to protect people from vehicle incidents. Will be
helpful to the drivers and the highway patrol / control room to overcome many issues like
Road Traffic, face detection (that works even if the person is in the car), Over Speeding,
and many other alerts.
The system shall provide
a) Measurement of traffic flow speed between 0 -150 Km/ Hr. for up to 8 lanes
b) Detection of vehicles coming from the direction opposite to the allowed direction of
travel and vehicles traveling in a direction that is across the allowed direction of travel.
c) Automatic detection of five types of traffic flow: normal, dense, delayed, congested
and stop & go.
d) Total number of detection zones in an image should be at least 100.
e) Detection of stationary vehicles within 10 sec
f) Monitoring zone occupancy of the detection area
g) Detection of deceleration
h) Detection of fog / smoke.
i) Detection of a fallen object
j) Alarms for following events
(1) Queue
(2) Stop
(3) Reverse Direction and direction across the road
(4) Movement and collection of people
(5) Speed Drop
(6) Fog / smoke
(7) Video Signal absent
Technical Internship Program|2021
The company KENT-ITS has been making various vehicular IOT devices past 22 years,
and the model which I am working on comes under similar category. This model can
become the company’s latest and highest selling product which includes all the features
for the development of smart city.
Proposed Methodology: -
Functional Requirements:
The entire video detection system shall consist of the following:
a) Video Image processing unit(s)
b) Video camera(s) with IR filter, enclosure, and sunshield
c) Camera Lens
d) Pole/gantry mounted flashing warning lights
e) Surge Suppressor
f) All other necessary equipment for operation
Software Requirements:
a) Pycharm or Jupyter notebook
b) Open CV
c) Python (pip.py)
d) SQL for Data Management
Installation Requirements:
1. The equipment supplied shall remain operable for the contract period from the date of
commissioning.
2. The Service provider shall undertake to support/maintain the equipment till the
completion of the contract period.
Operational Requirements:
The software supplied and installed at the ATMS Control Centre to operate the CCTV-
based VIDS shall be able to integrate with/Export data to and import data from the
ATMS unified database located in ATMS Control Centre.
Technical Internship Program|2021
Schedule: -
Start Date of Internship – 05 May 2021
End Date of Internship – 30 June 2021
Duration- 8 weeks
References: -
1. Git Hub link for YOLO weights and cfg
https://github.com/mohitwildbeast/YOLO-v3-Object-Detection
2. Installing pip.py
https://phoenixnap.com/kb/install-pip-windows
3. YouTube tutorial
https://youtu.be/NoOMnx-fylE