SAUDI ARAMCO
SHAYBAH NGL PROJECTS DEPARTMENT
INFRASTRUCTURE & EARLY WORKS DIVISION
Residential Industrial Complex
SAPMT RIC Expansion Office Shaybah
‘Tel. No. (03) 578 8101
June 2, 2012
TRANSMITTAL
EWALD, 0744,
HUSSEIN SHERIFF, Project Manager Method Statement: MS-CC-20
Mohammed Al-Mojil Group (MMG) CORING Walls & Slabs for TELECOM
P.O Box 11, Dammam 31411 KSA
INFO REVIEW APPROVAL UPDATE USE
LETTER QO
FORMS P|
DRAWINGS fa
OTHERS: &X
RESPONSE REQUIRED BY: DX] resPONsE NOT REQUIRED
TTEMNO. | QUANTTY | DESCRIPTION
ol ——2— | APPROVED as NOTED (refer also to MS-CC-019 comments)
Pages
| 1, PROCEDURES, although generic, are APPROVED |
2. REPAIRS & CORING to be IMPLEMENTED ONLY by MMG
3. Advise SAPMT, PID civil & telecom by RFI after layout |
but before CORES are commenced for our scrutiny. |
inspection & approval. Hollow _Core Engineer
endorsement _and concurrence WILL be required.
-
Each Res. Bldg. requires (3) sets of (1) 2" + (4) 4” cores
which must align verticalh tween floors
5. Cores are to be sleeved using galvanized steel pipe —
NOT PVG, with special lug anchors for grounding.
4 Any deviation from IFC dimensioned locations or SAES
spec's MUST be brought to SAPMT immediate attenti
|
| 7. Refer and adhere to relevant IFC Telecom drawings :
| T-BA-737472; 001-006 and T-BA-737476; 001 for details
| and appropriate SAES codes Q-001 for concrete,
8. if wet coring is to be implemented, containment of
water is required to prevent damage to adjacent workRIC expansion project. |
Contractor MUST explicitly understand and agree that all SAPMT comments on the
attached documents do NOT relieve the Contractor of ‘its obligations to fully comply
with SAES, Specifications, Codes and Contractual Terms & Conditions, which shall |
ALWAYS prevail. |
All Modifications must be incorporated into Final As-Built Drawings. |
ge ae
MOHAMED S. KASSAB, Project Engineer
Early Works & Infrastructure Division
Received By:
Name:
Signature:
Date:
MSk; ec: Transmittal Book
Page 2 of 2MOHAMMAD AL-MOJIL GROUP
P.O.BOX 11 DAMMAM 31411
Saudi Arabia
[ro + Mr. Bakr Fahad AbHajri DEPT. SAPMT AT Saudi Aramco
FROM HUSSEIN SHERIFF DEPT. : Projects Manager AT MMG (Shaybah Project)
[rRANSMITTAL NO, :029-RIG-T-0552012 DATIze-May-t2
suBsect + MS-06-20 - CONCRETE GORING FOR TELECOM
Project Tittle: Residential & industrial Complex Project @ Shaybah NGL, Contract No: 6600026865, 81 No: 10-00774
THE FOLLOWING ARE ENCLOSED FOR YOUR ACTION:
PRINTIDRAWINGS [__] REPRODUCIBLE COPII
[5 conrroen pocuments. [7]
pocumentsspecs [—] ORIGINAL DocumENTs — [—] CONFIDENTIAL |
ACTION REQUIRED
APPROVAL, ME eview /cueck (TT rererenceyrecorn = [—]
INFORMATION —- [—] DISTRIBUTION (7 rtease provipe oO
fe REFERENCE DESCRIPTION WOOF |REVISION| ‘No. OF
sueer |NumBER| copy
2ST
1 ms.cc-20 ‘CONCRETE CORING FOR TELECOM ° Me
NOTHING FOLLOWS™
INSTRUCTIONS FOR USE:
1. Two copies are made of this transmittal and dispatched with the accompanying attachments
2. One copy is signed by the recipient after confirmation of receipt and returned to the ORIGINATOR.
3. Second copy is retained by the recipient as a record of transmittal
44. Retain the original in the Transmittal File and file returned acknowledgements alongside the original.
‘5. Controlled Copy Holders to update their manuals and discard or suitably mark all SUPERSEDED documents.
‘SIGNED (Recipient) DATE (Received)
QAD-4.202
Revision 3, 30 Oct 941.0
2.0
3.0
4.0
Page
Concrete Coring for
oo | 10f 2
Telecom
PURPOSE
To develop guidelines for the Concrete Coring for Telecom services on hollow core
slab, siporex and concrete walls. Activities shall be in accordance with the
procedure, methods and safety requirements as defined and stated in this method
statement, manufacturer's procedure on hollow core and siporex to be considered.
SCOPE
2.4 Coordination of Coring activities with other services.
2.2. Excavation of the area coverage.
2.3 Scaffolding assembly for the elevated activities.
2.4 Repair of rebar.
2.5 Core sealing.
SAFETY PRECAUTIONS
3.1. Execute the work in accordance with the approved method statement,
3.2 Supervising in-charge in this work shall be at site during the execution of
the work.
3.3. Standard barricades and sufficient signboards shall be provided.
3.4 Personnel directly involved in the activity shall use personal protective
equipment (PPE).
3.5 Apply shoring protective system when it’s necessary, as per SACSM-2.10.3
3.6 Provision of scaffolds shall utilize if needed.
EXECUTION
4.1 Layout the core where to be place as per IFC Drawing cross reference.
-2 Excavate the area or erect scaffolds where coring shall be done.
4.3 Set up the core machine.
4.4 Check any unsafe conditions before to start the core machine.
4.5. Check any obstruction to coring activities and remove.
4.6 Start coring.
4.7 Avoid from any damages the main rebar of any civil masonry structure.
4.8 After coring check for any exposed rebar and recoat.
4.9 _ Install the line ( Telecom )
4.10. Upon installation of the services ( Telecom ) immediately cover/seal it with
approved materials.
4,11. Then backfill/install support of the services undergone coring.‘Approved by | Title
Concrete Coring for Doc.No. | Rev.) Page
Telecom ms-cc-20 | 0 | 2of 2
5.0 Equipment and Tools
5.1 Coring machine
5.2 Hand Tools
6.0 Reference Standard
6.1 Saudi Aramco Construction Safety Manuals
Tl. General and Civil
Excavations, Trenching and shoring
Working places, ladders and scaffoldings
Hand tools and Power tools