You are on page 1of 22

The Center

Light and
Mass
An eight-pointed star rises vertically on the
waterfront in the form of an ultratech office tower
overlooking Central and Victoria Harbour. Silvery
and reflective by day, the monolith transforms into
a light show at twilight when its four angular
projections morph into cool neon chevrons. This
massive office block offers the largest Grade A
floorplates in the SAR and is known — simply and
authoritatively — as The Center
W hen architect Dennis Lau
(Chairman & Managing
Director of his eponymous firm) talks
about The Center, the enthusiasm
he feels for the building in specific
and Hong Kong architecture in
general becomes palpable. He
eagerly sketches responses to
questions by tearing off sheets from
a roll of tracing paper, literally
retracing the design process. As
he describes his modern
reinterpretations of traditional
Chinese gardens, his fingers fly to
the bookshelf, plucking a volume of
Suzhou stone masterpieces to
illustrate his words. Lau’s fondness
for the SAR, mastery of his craft and
passion for the new 80-storey office
tower are much in evidence. When
asked about possible alternate
designs for The Center, he points to
three scale models enshrined in
glass cases — all fascinating and
workable designs that ended up on
the “cutting room floor”. The final
design reflects Lau’s passion for his
craft, developer Cheung Kong’s
desire for a landmark office tower,
and the considerable vagaries of the
site itself.

Hong Kong’s historical slice


The Center is located in one of HK’s
older districts — midway between
Central and Sheung Wan. The site
offers prime vistas of Asia’s most
scenic cityscape and harbourfront,
but was also home to a rabbit warren geometric plan can be described as
of “lane communities” — shops “square-upon-square”. The
arranged along narrow parallel diamond-shaped projections also
lanes. Twelve years ago, the Land maximise views from every angle.
Development Corporation Lau was interested in maintaining
earmarked the problematic site for the “lane community” concept,
redevelopment, but the wheels of perhaps under glass canopies. The
progress ground on for nine years LDC (whose logo, interestingly
until construction finally began. enough, was designed by Lau years
Acquiring the land from a myriad of ago) was more in favour of creating
landlords was one problem. Other circulation space for community use.
problems were posed by the
growing pains of urban renewal — Gazing upward
previous redevelopment in the area Lau’s creation achieves an
had been undertaken piecemeal, impression of tremendous mass,
rendering a wholesale razing of the which is potentiated by the urban
area unfeasible. squeeze of its surroundings. Hong
Denied a completely clear site, Kong is not known for its shy and
Lau designed the signature eight- retiring office blocks, but even
pointed star plan of The Center to compared to other shiny
suit the irregular environs. This heavyweights, The Center is
battleship-massive. In daylight, the confined urban space. The building surroundings in every direction,
base of the building provides the materials for The Center were including straight up. Lau points
most impressive view, as the chosen to admit or reflect light. out that while the lobby appears
inverted-pyramids of the Surfaces on the lower floors — massive, it is in proportion to the
projections merge into the silvery including the twelve main columns remainder of the building. A quick
building sides and continue which support the building frame — glance at the section drawing
skyward. At night, the projections are largely done in embossed- confirms his point.
are limned in horizontal chevrons pattern mirror-finish stainless steel
of coloured light, completely cladding. This shiny stippled steel Gaining entry
transforming the building’s plate is an emphatic flourish which The building presents identical
presence while retaining its profile lends an air of polished industry. facades on all four sides, yet the
(see sidebar: “Light Show”). The Mirror finishes are in abundance; the entrances vary considerably
overall impression is that of a structure bristles with chrome rivets depending on the approach. Des
structure which is already part of and metal detailing. Glazing is used Vo e u x R o a d C e n t r a l h a s a n
the next millennium — a futuristic extensively. entrance with a pair of escalators for
office block whose appearance is The building’s colossal those arriving by tram, and the
in lockstep with its host of high- entrances are a Dennis Lau & Ng Jubilee Street side — opposite
tech facilities. Chun Man trademark. The lobby is Central Market — houses the main
Counterbalancing this impression on a similar scale; at ground level, vehicular entrance. A side entrance
of mass is the use of light within a it seems to swallow its on Gilman’s Bazaar is approached
via a gigantic staircase finished in
that distinctive chrome stipple.
The main entrance and public
drop-off is on Queen’s Road Central,
where the building is approached
across a 1,500 sq m open plaza.
This space is open to the public 24
hours daily, and incorporates a
“bamboo garden” which Lau
designed as a modern answer to the
stone wonders of Suzhou. Glass
facades flank the plaza, which is
complemented by a water feature
and a “tree pit” stocked with
flourishing green bamboo. A
pedestrian corridor is defined by an
overhead awning supported by a
single row of columns; this fully
glazed canopy provides protection
during inclement weather.
The pair of glazed doors fronting transition lobby. The escalators are
the corridor can be difficult to notice, flanked by “bubble tanks” — rows
as one is distracted by the expansive of cylinders filled with water and
steel and glass of the building’s core. bubbling away. A waterfall was
Persevering through those doors, suggested, but it was felt that
the 12.4-metre main lobby reveals allowing the water to drain away
itself as a transparent box. Glazed from the building constituted bad
panels are supported by chromed feng shui; the bubble tanks allow
tension cables in a vertical tensile the direction of flow to continue
arrangement; support is supplied by upwards into the building. A series
the steel frame and structural slab. of misting devices at the base of
To the right is a pair of escalators the bubble tanks creates a low-
leading down to future GI/C intensity, soothing fountain effect.
(Government Institution and The transition lobby is a spacious
Community offices), the executive plane finished in unique grey-green
drop-off area and the single Brazilian granite (unique as the
executive lift, which offers secured- single quarry which produced it has
card access to any floor in the now closed down). The lightness of
building. the stone colour is singular. It is here
Straight ahead, a bank of three in the transition lobby where the
escalators leads upward to the transformation from the straight lines
and triangulation found in the
column arrangements starts to shift
into the circular theme which
dominates the building’s
interior. A large design element of
concentric circles appears on the
floor of the transition lobby and is
echoed by a round skylight directly
above.
Directly in front of the escalators
is the spacious glazed entrance to
the anchor tenant’s retail shop. It is
here that the slow curve of the retail
area begins. Although retail is not
The Center’s raison d’être, a series
of shops is available for everyday
tenants’ needs. Even without a
burning desire to go shopping, a
stroll along the semicircular glazed
walkway provides wonderful views
of the building core, columns and
elevation. The curving arcade also
screens views of the older concrete
buildings which surround The
Center, and the semicircular space
is topped by a landscaped garden
which provides further screening
greenery.
To the right of the anchor tenant
shop and the arcade walkway is
another triple bank of escalators
which leads to the raised lobby,
where the vertical transport scheme
begins to take shape. As with any
true skyscraper, lift logistics are
critical — The Center utilises a
“shuttle lift lobby” at the raised lobby
which helps to manage traffic by
shuttling passengers between rather more spectacular views. The
seven lift zones. People bound for architects have taken full advantage
zones 1, 2 and 3 can board lifts at of the skylobby by siting a five-star
the raised lobby. So too can those food and beverage outlet at this
bound for zone 7, the exclusive junction. A restaurant with full
upper zone which is directly glazing wraps itself around half of
accessed from this lobby. The Center, bookended by a pair of
Those headed for zones 4, 5 lounges for those simply enjoying a
and 6 start at the center of the drink or a fine Havana — the facility
raised lobby, where another floor- has an impressive cigar menu to
design motif of translucent green complement their beverage
concentric circles houses water selection. There are a pair of office
sprays and coloured lights. This units available on this floor as well.
dramatic underfloor fountain is The Center’s office zenith is the
known as the “starburst water penthouse on the 80th floor, which
feature”. It marks the starting point presents a stunning 360-degree
for the lifts which whisk view akin to that from a low-flying
passengers to the skylobby on the helicopter.
42nd floor.
Acres of silver
Taking the “Express” The silver metallic sheen of the
Few buildings in the world are lofty curtain wall defines the building in
enough to require skylobbies, yet daylight hours, and stands in sharp
they are an essential tool in vertical contrast to its luminescent nighttime
transport management for tall profile. As might be expected, the
buildings. The idea is simple: choice of curtain wall was not an
passengers collectively take an arbitrary one — with no sunshading
“express” lift to a central location, to speak of and a huge surface area,
then separate into “local” lifts The Center relies on its envelope to
serving different floors which take cut solar gain and keep a damper
them to their final destination. The on tenants’ energy bills. Typical units
concept is similar to commuters are Varicon 17.5 mm silver-on-clear,
using a combination of express a configuration which limits solar
and local trains to reach their transmittance to a mere 8%.
individual stops. Spandrel units have a 10 mm
Use of a skylobby effectively thickness and a horizontally striped
creates a second “main lobby” area pattern. Mullions are finished in
within The Center, albeit one with natural anodised aluminium.
Befitting its high-tech image, The complicated, the function of office
Center employs a curtain wall technology should be to make our
FAST FACTS
cleaning system which is fully existence simpler and more
At 346 metres to the top of the mast, The
automated. The cleaning gondolas rewarding.
Center is the third-tallest building in Hong
descend from the top of the building Raised flooring is now a standard
Kong. Central Plaza, also designed by
on tracks concealed within the feature in new office buildings;
Dennis Lau & Ng Chun Man, is 374
mullions. Cleaning can be carried Companies are loathe to move into
metres tall by the same measurement
out at night to minimise disturbance offices which offer no flexibility for
standard. IM Pei’s Bank of China Building
to the building occupants. their IT cabling requirements. In
tops out at 368.5 metres.
addition to its raised flooring, the
Technological Implementation structural cabling system (SCS) for
59 floors of offices are available, with a
Grade A office space necessitates The Center plays a critical role in all
total GFA of 130,032 sq m of office space.
design which reflects current telecommunication systems,
technology and allows tenants to providing the physical link between
The Center is the largest-scale steel-
implement their own technology. As sources and destinations of
framed office in Hong Kong. A total of
our working lives become more information. Data, voice, video and
twelve steel box section columns support
the building — the columns are concrete-
filled for 20 storeys, then reduce in size
and become hollow as they reach the top.

At 2,415 sq m, the floorplates in The


Center are the largest amongst all office
buildings in Central.

A total of 35 high-speed passenger lifts


and 6 service lifts form the vertical
transport network for The Center.

Over 400 carparking spaces are available


in the basement carpark.
control signals are transmitted over relocatable air diffusers built into the
this infrastructure, which links floor. This is the first air plenum
devices throughout the building. system in Hong Kong — the void
The SCS consists of Category 3/ underneath the floor is filled with
Category 5 (UTP) copper cables and cold air which is piped into the
optical fibre cables, and is capable working space via individual
of supporting high-speed/broadband underfloor units. This design allows
services such as ISDN lines for for maximum flexibility as the air-con
voice, 100 Base-T Ethernet for data, units (the units interchange with floor
and video signals, and is designed tiles and are thus known as “fan-
to accommodate future tiles”) can be installed or removed
technologies. Tenants can easily as needed. This eliminates the need
make multi-floor connections, and for ductwork and allows office
it’s even possible for tenants to partitions to be reconfigured easily.
connect on alternate floors. Cheung The system permits end-users to
Kong’s Senior Project Manager adjust temperature and volume of air
Grace Shen details the main circulation to suit personal tastes, or
advantage of designing the building to compensate for heat-generating
for IT use: “With The Center, you equipment.
don’t need to spend much money Air circulation in each office is
for interior fit-out.” further improved by a ceiling-
mounted recirculating air system
Flexible Air and air-filtering system which routes
The 340 mm underfloor void of The
Center is unique in that it houses an
air-conditioning system with
the air return through the in the executive washrooms, as a
interchangeable light reflector units major selling point. The proof of the
in the ceiling. Shen: “It’s all about pudding is the tenants who have
user control and keeping the air already taken space, including
clean. The underfloor space Dao Heng Bank, Samsung
provides ease of maintenance as it Electronics HK Ltd, Celestial Asia
is simple to vacuum.” Securities Holdings Ltd and the
The building also bristles with LDC. Others wishing to become
technological frills at the public level. centrists are advised to view the
LCD screens in the passenger lifts show flat on the 43rd floor.
display weather data and can be
programmed with the company logo
for firms leasing an entire floor.
Touch-screen directories are located Cheung Kong (Holdings) Ltd/
Land Development Corporation
in the office lobby, while lobby
developer
screens display financial data,
weather and news headlines. The Dennis Lau & Ng Chun Man
trump card is the huge Sony architect
Jumbotron display screen on the
Queen’s Road Central side, which Maunsell Consultants Asia Ltd
structural engineer
presents newsfeed information and
can also be used for special events. Associated Consulting Engineers Ltd
m&e
Filling the Colossus
The abundance of office space in Davis Langdon & Seah (Hong Kong) Ltd
the SAR has made the sector a quantity surveyors
tenants’ market. Buildings which
Ryoden
reflect quality and prestige HVAC
combined with an excellent
location will be more successful at Paul Y - ITC Construction Ltd
attracting tenants. The location of main contractor
The Center — close to the Mid-
Tostem
Levels escalator, the Hong Kong
curtain wall
Airport Express station, and
myriad MTR/tram/bus/road links — Chevalier
is prime. But Shen also points to lifts & escalators
the building’s facilities, which
include such amenities as showers Arbitare/BSC
signage
Light Show T he night-lighting features of The
Center are so dramatic that they
have become a symbol of the
checking the entire lighting system.
The everyday presets involve slow
and subtle changes, which always
building itself. They have been the move from bottom to top,
recipient of praise and scorn, but accelerating the upward thrust.
more than anything else, they have There are presets for holidays — the
placed an indelible stamp on Hong Christmas effect will evoke a green
Kong’s famed nighttime skyline. In and yellow Christmas tree with multi-
sharp contrast to the normal practice coloured sparkles, and the Lunar
of training spotlights on a building New Year setting will alternate red/
to articulate its curtain wall, fins and gold/yellow/green with blooming
ornamentation in the night hours, rainbow colours. The most dynamic
The Center’s neon scheme leaves lighting effect is where the building
the walls of the building dark as bent imitates a fireworks display going off,
horizontal stripes climbs the with rapid colour rushes toward the
pyramidal projections of the top followed by slower particles of
elevation, culminating in a sparkling colour falling downwards
trapezoidal flurry of lumens at the — an effect that will manifest during
building’s crown. pyrotechnic displays in the harbour.
The lighting scheme was supplied Currently, the system presents a
by Far Display Lighting Ltd, a single “fireworks” cycle at 9:00 PM
subsidiary of Hong Kong-based Far and a single “holidays” cycle at
East Neon Light Co Ltd. The system 10:00 PM.
is a COZY® VIVID low-voltage neon Working in unison with the
system which uses primary-colour neon lighting is a series of Italian
neon tubes to achieve a wide variety spotlights known as “space
of effects. The 8,784 tubes are cannons”. This particular charge
evenly divided between red, blue of the light brigade takes place
and green; combinations of these mostly at the top of the building,
colours will create any desired where space cannons in 4,000-,
colour. The total power consumption 2,000- and 1,000-watt
is approximately 110,000 watts, configuration light up the rooftop
although a conventional high- mast with its double-parabola
voltage neon system of identical size decoration. An additional quartet
would consume four times as much of space cannons will train 4,000
electricity. About 11 kilometres of watts of firepower on the lower
neon tubing was used. portion of the building. All of
The system has a total of 14 these ultra-tech spotlights are
preset settings, three of which are wired into the main system and
solid-colour and can be used for will change colour as required.
Construction of The Center by Raymond Wong Wai Man

April 1995 ,when the contractor was


doing the foundation work. On the left
hand side of the photo is Jubilee Street
and on top is Queens Road Central. In
the middle, several machines are
digging the vertical trench for the
construction of the diaphragm wall

A series of 1.2-metre thick


diaphragm wall panels were joined
to form a 24-metre diameter
caisson shaft. Four of these
caissons were built to provide a
sound base for the foundation of
the main structure of the building
tower. The photo shows the
excavation work using typical
excavating machines inside one of Overall view of the automatic
the caisson shafts
circulation trench cutter
Close up showing the twin
drum cutter set. A 150-
millimetre suction pipe is
placed between the drum
cutters. The excavated soil
or gravel isbeing sucked out
from the trench together
with the bentonite slurry.
The slurry is then pumped
to the bentonite treatment
plant where the soil and
gravel are removed by a
filtration process

Detailed close-up of a
typical caisson shaft. At this
stage, the structural steel
column cluster has
essentially been completed
up to the ground level. The
scaffold inside the shaft was An overall view of the four caisson shafts which form the major part of
erected as further support foundation system of the building. A typical work stage can be seen here,
for the construction of the starting from the excavation, construction of the bottom raft, erection of
podium structure of the the structural steel column clusters and the onward fabrication of the column
building structure respectively

The main frame of the building tower rising


from the ground. The four column clusters that
support the building, each composed of three
2.5m x 2.5m and one 1.2m x 0.8m steel
columns, can be clearly seen here. One
special feature in the structural design of this
building is that it does not consist of a
reinforced concrete central core, which is quite
unusual in buildings of similar type. The whole
building is based on the design concept of a
gigantic space frame in order to achieve the
necessary rigidity in structure
The overall layout of the site on June
1996. At this stage, the basic
structure of the podium had been
formed. Since most of the basement
structure was constructed using a
top-down technique, there was no
activity until a later stage, when the
podium structure was completed
and access to the ground was made
available for the basement
excavation

A work platform attached


to a corner column to A 5-metre reinforced concrete raft was At this level — some 180 metres
provide access for constructed in the bottom of the above the ground — a worker
workers to carry out the caisson to form the foundation for the prepares a lifting rope for the placing
necessary welding work column clusters of the building tower of a connecting member
The core frame at the centre of
the building. This core measures
roughly 25m x 25m, and will
accommodate a pair of stairs
and the required escape
passageways, lavatories, air
handling unit rooms and 26
passenger lifts

The composite floor, which acts as a diaphragm


structure which provides rigidity to the vertical
steel members, is constructed of reinforced
concrete laid on a ribbed steel deck as a
permanent shutter. The one shown here is the
deck prior to placementof the floor reinforcement
A complicated con-nection arrangement at the junction of the
inner columns and the floor joists

A detailed look at one of the four corner gusset blocks which The dimension of the main frame is reduced and set back
connect and provide the required rigidity for the pyramid structure to form the “pyramid” top of the tower. The details of the
and the mast structural arrangement for the housing of the 80-metre mast
can also be seen
The temporary tack rail system provided at 30- The curtain wall system used in The Center has a simple Close-up of the partially completed steel mast.
storey intervals for the manoeuvring of the design due to a unitised system combined with the Due to the height of the free-standing mast,
gondola used for the erection of the curtain relatively simple and plain form of the building exterior. a resonant wind effect which creates low
wall panels The only exception is the “half-pyramid” located at the frequency vibration must be considered. A
top and bottom of the four cantilevered attached special resilient design is used to stop the
portions. The one here is the inverted half-pyramid — vibration from transferring to the main
with the bracket for the suspending scaffold partially structure below
erected in preparation for the erection of the backing
frame and curtain wall at a later stage
January 1997

May 1997
One of the prominent designs
employed in The Center is the
automatic curtain wall cleaning
system which occupies almost the
entire area of the 80th floor. With
a retractable gate door on each
side of the facade to launch the
gondola, the cleaning system can
cover all the wall surfaces of the
building exterior. The photo shows
Workers inside the gondola carry out
the gate door opened with the rail-
a commissioning test before the
mounted crane-car equipped with
handover of the system. A control
a telescopic arm launching the
panel inside the gondola can steer the
window cleaning gondola during a
gondola to any position on the exterior
trial operation
surface of the building

The operation of the curtain wall


cleaning gondola and the crane-car
Stage 1 Stage 2 Stage 3 Stage 4 as seen from a distance

You might also like