Professional Documents
Culture Documents
4b. TESTING FACILITY (VIb)
4b. TESTING FACILITY (VIb)
TESTING FACILITIES
• Open-Loop System:
- Test load is supported by the floor
- Need a reaction floor
1
2/22/2016
Supporting Laboratories
Type of Test
2
2/22/2016
3
2/22/2016
Fatigue Loading
σ max
⊿σ
σ min
time
UTM - LRS
(150 Ton Capacity)
4
2/22/2016
5
2/22/2016
6
2/22/2016
Sabuk Pengikat
Actuator Sendi
Spesimen
Lateral Bracing
Strong Floor
Strong Floor
7
2/22/2016
TEST FRAME
UTM
8
2/22/2016
9
2/22/2016
10