Professional Documents
Culture Documents
HEIGHT U C B POST
CONCRETE BARRIER WITH RAILING
3M CONCRETE BARRIER
610
UPSTANDING
KERB 3.2 Mtr
TIE IN WITH EXISTING
ASPHALT
950 Min
TRAFFIC FLOW
FLARE SHOE
ANGLE BEAM
SECTION A-A
TRAFFIC FLOW
23.25 Mtr
INTERMEDIATE DOUBLE
HEIGHT
24.060 Mtr
UCB POST
JB-5
ANGLE BEAM
FLARE SHOE
2 Nos
KEYPLAN
MAIN CONTRACTOR : PRODUCT : PROJECT : CLIENT :
MINISTRY OF WORKS
THE KINGDOM OF BAHRAIN
Web : www.ameeri.com.bh
E-mail : amgard@ameeri.com.bh 04 ISSUED FOR APPROVAL 23.09.2018 Dwg. No Dwg. Title
SL DESCRIPTION DATE
APPROVED.
SCALE - NTS ALL DIMENSIONS ARE IN MM Drawn LIBIN Chkd KC MENON