Professional Documents
Culture Documents
200
NS GROUT (BY OTHERS) MEMBRANE
300
CORKJOINT 47B SWELLABLE
CEMENTITIOUS MEMBRANE
WATER-STOP
300
BASEMENT
50
FFL
TO FALL TO FALL
PU LIQUID APPLIED
200
MEMBRANE
50
400
ANGLE FILLET
REINFORCEMENT FIBRE
GLASS MESH AT JOINT
FACADE CONSULTANT
HCCH Consulting Pte Ltd (Building Facade Group)
LANDSCAPE CONSULTANT
Grant Associates (S) Pte Ltd
ACOUSTIC CONSULTANT
Alpha Acoustic Engineering Pte
LIGHTING CONSULTANT
Nipek Pte Ltd
SERVICE APARTMENT ID
CONSULTANT
The Ascott Limited
Our comments and corrections made on this shop drawing do not relieve the Contractor / Sub- contractor of
his contractual responsibilities.
Work shall confirm to Employer's requirements and Employer's design drawings. The Contractor is
responsible for all correctness of dimensions and details in this drawing and for the full coordination of all
aspect of the work.
NAME/SIGNATURE : DATE:
Science Park Property Trustee Pte. Ltd. as STRUCTURAL Mott Macdonald S'pore Pte Ltd MAIN WOH HUP (PRIVATE) LIMITED
REV DATE DESCRIPTION GENERAL NOTES : CLIENT
Trustee of Science Park Property Trust 1 CONSULTANT 52 BEACH ROAD CONTRACTOR
BUILDING WITH INTEGRITY PROJECT TITLE : DRAWING TITLE :
168 ROBINSON ROAD #30-01 CAPITAL TOWER #35-00, THE GATEWAY EAST, SINGAPORE 189721 217 UPPER BUKIT TIMAH ROAD, WOH HUP BUILDING
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF WORKS.
0 02-03-22 FOR APPROVAL 2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN CONSULTANTS AND RELATED APPROVED
SINGAPORE 068912 TEL: (65) 6293 1900 FAX: (65) 6293 1911 E-mail: mm@momttmac.sg SINGAPORE 588185 T: 63858585 F: 62723322
PROPOSED ERECTION OF A 15-STOREY BUSINESS PARK & TYPICAL WATERPROOFING DETAIL
SHOP DRAWINGS (INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO THE MAIN CONTRACTOR. Surbana Jurong Consultants Pte. Ltd. MEP Squire Mech Pte Ltd HOTEL BUILDINGS WITH 2 BASEMENTS CARPARK &
3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL SIZES AND DIMENSIONS.
ARCHITECT
(ER) 168 JALAN BUKIT MERAH, #01-01 CONNECTION ONE CONSULTANT 1 KALLANG JUNCTION
ANCILLARY FACILITIES ON LOT 02742N MK 03 AT No. 3 SCIENCE
CONNECTION TO UNDERGROUND
SINGAPORE 150168 #03-01
4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR EACH TRADE / TYPE OF WORKS) ON SITE
FOR THE MAIN CONTRACTORS / CONSULTANTS / OWNERS REPRESENTATIVES'S COMMENTS / APPROVAL
TEL: (65)62481288, www.surbanajurong.com SINGAPORE 339263 PARK DRIVE (QUEENSTOWN PLANNING AREA) CAVITY WALL
BEFORE PROCEEDING WITH THE SITE WORKS. Serie + Multiply Consultants Pte Ltd SUB
DESIGN
CONSULTANT 59 JALAN SULTAN CONTRACTOR MAP SCALE : DATE : DRAWN : SIZE : DWG NO : REV
5. UNLESS OTHERWISE STATES, COLUMN FINISHES SHALL BE IN SKIMCOAT AND PAINT. Maxbond Singapore Pte Ltd
6. FLOOR TRAP REFER TO APPROVED M&E DRAWINGS & SANITARY DRAWINGS. SINGAPORE 198979 9 Tagore Lane #03-13 9@Tagore Singapore 787472
(65) 6457 3168 f (65) 6457 3868
AS SHOWN 02-03-2022 AIVI A3 SP3_MB_A_WPF_DET--_TYP_011 0
admin@maxbond.sg
w www. maxbond.sg