DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
KEY PERSONNEL’S AFFIDAVIT OF COMMITMENT TO WORK ON THE

September 08, 2021

JOSE R. GAURAN, JR.


BAC Chairman
Department of Public Works and Highways
Cebu City District Engineering Office
V.Sotto Street, Cebu City

Dear Sir:

1. I confirm that Helm Construction & Supplies has engaged my services for the position of Project
Manager in the above stated Contract if it is awarded to the contractor.
2. I, therefore, commit to assume the said position in the above stated Contract once it is awarded
to the Contract, and I shall employ the best care, skill, and ability to perform the duties of such
position in accordance with the Conditions of Contract, Specifications, Drawings, and other
provisions of the Contract Agreement. I am aware that i have to stay in the jobsite for the duration
of my assignment.
3. I do not allow the use of my name to enable the Contractor to quality for the above stated
Contract without my commitment to assume the said position, since I understand that to do so
shall be a sufficient ground for my disqualification from this Contract and future biddings of the
DPWH.
4. I submit, and certify as true and correct, my biodata as follows:

a. Name : Adelaida M. Paylado ____


b. Date of Birth : November 01,1938
c. Nationality : Filipino
d. Educational Attainment :Bachelors of Science in Civil Engineering
e. Specialty :Roads,Flood Control & General Engineering
f. PRC License No. and Date : 0006346-01/23/1962
g. Employment Record : 59 years
h. TIN Number :137-680-922-000
Name & Address of Employer Position From To Total Period
Mo./Yr. Mo./Yr. Yrs. & Mos.
Helm Construction & Supplies Project Manager 2008 present 12

i. Work Experience (Projects Handled):


i. Proj. Name & Location i. Proj. Description i. Proj. Description i. Start Date
ii. Owner’s Name & Address ii. Total Proj. Cost Handled ii. Compl. Date
iii. My Position ii. Cost of Part
Completed Projects
i.Asphalting of Roads at i.Roads:Construction- i.Roads:Construction- i.02/02/11
Lindaville Subd.Phase I,Dao Asphalt Asphalt ii.02/08/11
Dist.Tagbilaran City,Bohol ii.4,210,000.00 ii.4,210,000.00
ii.LGU-Tagbilaran City
iii.Project Manager

1|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
i.Improvement/Concreting of i.Roads:Construction- i.Roads:Construction- i.02/02/11
C.P.G. East Ave.Mansasa PCCP PCCP ii.05/17/11
District Tagbilaran City, ii.3,466,550.31 ii.3,466,550.31
Bohol
ii.LGU-Tagbilaran City
iii.Project Manager

i.Const.of Concrete Drainage i.Flood Control/ i.Flood Control/ i.02/02/11


Box Canal w/ Cover at CPG Hydraulics/Drainage Hydraulics/Drainage ii.08/01/11
East Ave.cor.Circumferential ii.1,728,002.40 ii.1,728,002.40
Rd. to VP Inting,Tagbilaran
City, Bohol
ii.LGU-Tagbilaran City
iii.Project Manager

i.Asphalting of Road at H. i.Roads:Construction i.Roads:Construction i.08/18/11


Zamora St. Tagbilaran City Asphalt Asphalt ii.09/08/11
Sta.0+000-860, ii.5,585,456.00 ii.5,585,456.00
ii.LGU-Tagbilaran City
iii.Project Manager

i.Concreting of V.P. Inting St. i.Roads:Construction i.Roads:Construction i.06/03/11


(Along NFA) to cor. M.Paras PCCP PCCP ii.11/25/11
Mansasa Dist.Tagbilaran ii.7,609,316.26 ii.7,609,316.26
City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Repair/Rehab/Imprv’t. i.Roads:Rehabilitation i.Roads:Rehabilitation i.02/06/12


Along Cebu Toledo Wharf Asphalt Asphalt ii.02/18/12
Road (Uling-Toledo Wharf), ii.4,688,842.98 ii.4,688,842.98
Toledo City 12HF0001
ii.DPWH-Cebu DEO
iii.Project Manager

i.Rehab.of Farm to Market i.Roads:Construction- i.Roads:Construction- i.04/11/12


Road,Brgy.Capt.Claudio Gravel Gravel ii.05/09/12
Toledo City, Cebu 12HF0006 ii.4,628,328.09 ii.4,628,328.09
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Concreting of Farm to i.Roads: i.Roads:Construction- i. 5/6/2012


Construction- PCCP PCCP
Market Road Along Jose St. ii. 14,984,500.00 ii. 14,984,500.00 ii. 11/3/2012
(3 Section)
1. Sta. 0+000-0+320
2. Sta. 0+400-0+760
3. Sta. 1+140-1+440
ii. LGU-Tagbilaran
2|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
iii.Project Manager

i.Replacement of Gutter i. Replacement of i. Replacement of i. 6/25/2012


Downspout & Roofing Gutter Downspout Gutter Downspout ii. 7/1/2012
Sheets at Tagbilaran City & Roofing Sheets & Roofing Sheets
Central Public ii. 579,920.52 ii. 579,920.52
ii. LGU-Tagbilaran
iii.Project Manager

i.Improvement/Concreting of i.Roads:Construction i.Roads:Construction - i. 7/9/2012


- PCCP PCCP
T.Cloma St. (Booy-taloto) ii. 6,291,083.01 ii. 6,291,083.01 ii. 10/1/2012
Sta. 0+200-0+724,Booy Dist.
Tagbilaran
ii. LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting of i.Roads:Construction i.Roads:Construction - i. 8/7/2012


- PCCP PCCP
Road along Graham Avenue ii. 5,447,282.92 ii. 5,447,282.92 ii.11/24/2012
(Sta. 0+060-0+290) Cogon,
Dist. Tagbilaran City
ii. LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting of i.Roads:Construction i.Roads:Construction - i. 7/20/2012


- PCCP PCCP
Circumferential Road (cor.M. . ii. 5,250,216.00 . ii. 5,250,216.00 ii.10/27/2012
Parras Ext.-cor.Espuelas
ext.
Sta.1+335-1+640,Poblacion
III,Tagbilaran City
ii. LGU-Tagbilaran City
iii.Project Manager

i.Construction/Installation of i.Flood Control/ i.Flood Control/ i.7/12/2012


Reinforced Pipe Culvert and Hydraulics/Drainage Hydraulics/Drainage ii.7/20/2012
Manhole w/ Cover at Dao ii.1,497,005.00 ii.1,497,005.00
Bus terminal, Dampas Dist.,
Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting of .Roads:Construction .Roads:Construction - i.9/3/2012


- PCCP PCCP
F.Ligason St.(sta.1+120-1 + ii.9,814,248.00 ii.9,814,248.00 ii.12/16/2012
780)
ii.LGU-Tagbilaran City
iii.Project Manager

3|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
i.Repair/Rehab/Imprvt. Of i.Roads:Rehabilitati i.Roads:Rehabilitation- i.09/06/12
on-Asphalt Asphalt
Balamban Transcentral ii.9,215,057.06 ii.9,215,057.06 ii.11/23/12
Hi-way,K0046+(-342)-K0046
+308,Brgy. Cansomoroy,
Balamban, Cebu
12HF0063
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Restoration/Construction of i. Restoration/ i. Restoration/ i.3/7/13


Damage Pavement at Construction of Construction of ii.10/9/13
Lindaville Subdivision Damage Pavement Damage Pavement
Entrance Road Including ii.1,699,984.42 ii.1,699,984.42
Slope Protection
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting of i.Roads: i.Roads:Construction- i.3/7/13


Construction- PCCP PCCP
Dao Tiptip Road (sta.0+470- ii.3,828,734.78 ii.3,828,734.78 ii.10/9/13
0+740)Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting i.Roads: i.Roads:Construction- i.3/7/13


Construction- PCCP PCCP
Of Road at M.Parras St. ii.1,611,065.74 ii.1,611,065.74 ii.10/9/13
(from cor. Borja-cor. Visarra
St.)
ii. LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting i.Roads: i.Roads:Construction- i.3/7/13


Construction- PCCP PCCP
Of Road at Palma St.(from ii.2,554,376.95 ii.2,554,376.95 ii.10/9/13
Cor.Gallares-cor. Remolador
St Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting i.Roads: i.Roads:Construction- i.3/7/13


Construction- PCCP PCCP
Of Tamblot Circumferential ii.3,808,899.69 ii.3,808,899.69 ii.10/9/13
Road (cor.J.A. Clarin-cor.
B.Inting St.) Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting of i.Roads: i.Roads: Construction- i. 3/29/12


4|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
Construction- PCCP PCCP
Various City Roads (2) Road ii.9,762,875.18 ii.9,762,875.18 ii.6/16/2013
Tagbilaran City,Bohol
ii.LGU-Tagbilaran City
iii.Project Manager

i.Improvement/Concreting/ i.Roads: i.Roads:Construction- i.3/7/2013


Construction- PCCP PCCP
Restoration/ Const. of ii.13,457,284.17 ii.13,457,284.17 ii.10/8/2013
Various City Roads (5)Roads
Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Construction of a Two (2) i.Building:Construct i.Building:Construction i.09/26/2011


ion
Storey 4-Classroom School ii.4,467,384.58 ii.4,467,384.58 ii.03/20/2012
Building, Mansasa Elem.
School, Mansasa District,
Tagbilaran City
ii.LGU-Tagbilaran City
iii.Project Manager

i.Concreting of Farm to i.Roads: i.Roads:Construction- i.09/17/14


Construction- PCCP PCCP
Market Road at Brgy. ii.20,347,300.00 ii.20,347,300.00 ii.02/17/15
Lamesa to Brgy. Luca
Balamban
ii.LGU-Balamban
iii.Project Manager

i.Concreting of Farm to i.Roads: .Roads:Construction- i.02/17/15


Construction- PCCP PCCP
Market Road, Hingatmonan- ii.3,871,375.00 ii.3,871,375.00 ii.05/25/15
Liki, Balamban, Cebu
Sta.0+000-Sta.0+204.50;
Sta.0+339.50-Sta.0+412
14HF0141
ii.DPWH-Cebu 3rd Deo
iii.Project Manager

i.Construction of Farm to i.Roads: i.Roads: Construction- i.03/31/15


Construction- PCCP PCCP
Market Road, Brgy. Cantibas ii.2,475,649.38 ii.2,475,649.38 ii.07/4/15
-Cansumoroy-Duangan, i.Flood Control/ i.Flood Control/
Balamban, Cebu Hydraulics/Drainage Hydraulics/Drainage
15HF0017 ii.1,670,980.46 ii.1,670,980.46
ii. DPWH-Cebu 3rd Deo
iii.Project Manager

5|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------

i.Rehabilitation/Reconst. of i.RoadsConstructio i.RoadsConstruction- i.02/24/15


n - Asphalt Asphalt
Cebu-BalambanTranscentral ii.7,587,676.00 ii.7,587,676.00 ii.06/25/15
Highway (Intermittent
Section)Balamban, Cebu
14HF0112
ii. DPWH-Cebu 3rd Deo
iii.Project Manager

i.Repair/Rehabilitation and i.Roads: i.Roads:Construction- i.06/19/15


Construction- PCCP PCCP
Construction of Farm to ii.1,862,044.98 ii.1,862,044.98 ii.09/08//15
Market Road, Brgy. Luca,
Ginatilan to Cabasiangan
Balamban, Cebu, Sta. 017+
000-Sta.017+290.
15HF0034
ii. DPWH-Cebu 3rd Deo
iii.Project Manager

i.Repair/ Rehabilitation of i. Flood Control/ i. Flood Control/ i.06/10/15


Arpili Revetment along Hydraulics/Drainage Hydraulics/Drainage ii.08/14/15
Toledo-Tabuelan-San ii.1,140,000.00 ii.1,140,000.00
Remegio Road, K0055+300
-K0055+389.19, Arpili
Balamban, Cebu
15HF0023
ii. DPWH-Cebu 3rd Deo
iii.Project Manager

i.Constructiion of Arpili i. Flood Control/ i. Flood Control/ i.09/16/14


Revetment (Grouted Riprap) Hydraulics/River Hydraulics/River Control ii.03/02/15
Control
Arpili, Balamban, Cebu ii.17,297,680.00 ii.17,297,680.00
K0055+301
14HF0040
ii. DPWH-Cebu 3rd Deo
iii.Project Manager

i.Rehabilitation/Reconst. i.Roads: i.Roads:Construction- i.03/3/15


Construction- PCCP. PCCP.
Of National Roads with ii.45,365,900.00 ii.45,365,900.00 ii.09/20/15
Slips, Slope Collapse
And Landslide, Arterial
Road, Cebu-Balamban
Transcentral Highway,
K0016+900-K0016+973,
K0018+700-K0018+743,
6|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
Cebu City 14HH0134
ii.DPWH-Cebu City Deo
iii.Project Manager

i.Asphalt Overlay Along i.Roads:Construction i.Roads:Construction i.01/19/16


Toledo-Tabuelan-San- Asphalt Asphalt ii.02/12/16
Remegio Road, K0060+642- ii.6,826,435.43 ii.6,826,435.43
K0061+371,Balamban,Cebu
15HF0147
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Construction of Level II i.Flood Control/ i.Flood Control/ i.02/09/16


Municipal Waterworks Hydraulics/Water Hydraulics/Water ii.04/07/16
System 15HB0133 Supply Supply
ii.DPWH-Bohol 3rd DEO ii.2,880,051.00 ii.2,880,051.00
iii.Project Manager

i.Proposed Road Opening i.Roads: i.Roads:Construction- i.10/28/15


Construction- PCCP. PCCP.
& Concreting/Improvement ii.5,325,181.25 ii.5,325,181.25 ii.05/18/16
From Brgy.Carmen to Ilihan
Toledo City
ii.City Government of Toledo
iii.Project Manager

i.Proposed Road Opening i.Road Opening & i.Road Opening & i.12/9/15
& Widening at Bawod-Sam- Widening Widening ii.08/14/2017
Ang-Awihao, Sta.0+000 to ii.95,853,812.50 ii.95,853,812.50
Sta.7+280, Toledo City
ii.City Government of Toledo
iii.Project Manager

i.Construction of Combado i. Flood Control/ i. Flood Control/ i.04/5/16


River Himungbongan Flood Hydraulics/River Hydraulics/River Control ii.12/29/16
Control
Control Structure (Rubble ii.28,227,817.35 ii.28,227,817.35
Concrete), Sitio Combado
Brgy. Cantuod, Balamban,
Cebu Sta. 3+540-Sta.3+870
16HF0021
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Construction of Drainage i. Flood Control/ i. Flood Control/ i.03/06/16


Along Toledo-Pinamungajan Hydraulics/Drainage Hydraulics/Drainage ii.08/02/16
Aloguinsan-Mantalongon ii.22,052,853.00 ii.22,052,853.00
Road (S00235CB) Section 1:
16HF0007
7|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Construction of Multi- i.Buildings:Const.- i.Buildings:Const.- i.06/11/17


Purpose Building (Covered Without Piles-Low Without Piles-Low ii.08/10/17
Court) at Brgy.Angilan, Rise-Concrete Rise-Concrete
Pinamungajan,Cebu (Frame) (1 to 5 (Frame) (1 to 5
17HF0067 Storeys) Storeys)
ii.DPWH-Cebu 3rd DEO ii.2,352,673.99 ii.2,352,673.99
iii.Project Manager

i.Construction of Multi- i.Buildings:Const.- i.Buildings:Const.- i.07/09/17


Purpose Building (Covered Without Piles-Low Without Piles-Low ii.09/07/17
Court) at Brgy.Anislag Rise-Concrete Rise-Concrete
Pinamungajan,Cebu (Frame) (1 to 5 (Frame) (1 to 5
17HF0099 Storeys) Storeys)
ii.DPWH-Cebu 3rd DEO ii.2,337,316.94 ii.2,337,316.94
iii.Project Manager

i.Reconstrution of Geometric i.Roads:Construction- i.Roads:Construction- i.07/09/17


Alignment of Toledo-Pinamu- Slope Protection Slope Protection ii.12/30/17
Ngajan-Aloguinsan-Manta- Using Structural Using Structural
Longon Road,Poblacion Measures (e.g. Measures (e.g.
17HF0061 Revetment, Revetment,
ii.DPWH-Cebu 3rd DEO Retaining Structure Retaining Structure
iii.Project Manager Wirenet) Wirenet)
ii.41,237,858.42 ii.41,237,858.42

i.Construction of Concrete i.Roads:Construction i.Roads:Construction i.01/29/18


Road Brgy.Singsing-Biasong PCCP PCCP ii.04/03/18
Balamban,Cebu ii.4,702,367.65 ii.4,702,367.65
18HF0010
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Proposed Const. of Ilihan i.Bridges:Const. i.Bridges:Const. i.01/26/17


Bridge,Brgy.Ilihan,Toledo Concrete (Super- Concrete (Super- ii.02/09/18
City Structure) Structure)
ii.LGU-Toledo City ii.58,579,463.35 ii.58,579,463.35
iii.Project Manager

i.Convergence and Special i.Roads:Rehab.- i.Roads:Rehab.- i.05/17/18


Support Program-Const. / PCCP PCCP ii.09/26/18
Improvement of Access ii.19,600,000.00 ii.19,600,000.00
Road leading to Declared
Tourism Destination,Brgy.
Simala,Sibonga,Cebu
18HE0053
ii.DPWH-Cebu 2nd DEO
8|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
iii.Project Manager

i.Road Widening of Cebu- i.Roads:Rehab.- i.Roads:Rehab.- i.10/31/18


Balamban-Transcentral PCCP PCCP ii.04/08/19
Highway,K0045+280-K0045 ii.18,176,934.90 ii.18,176,934.90
+481,Balamban,Cebu
18HF0153
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Concreting of Road,Brgy. i.Roads:Construction i.Roads:Construction i.03/12/19


Vito-Brgy.Singsing, PCCP PCCP ii.07/23/19
Balamban,Cebu ii.19,299,871.17 ii.19,299,871.17
18HF0192
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Concreting of Road,Brgy. i.Roads:Construction i.Roads:Construction i.03/12/19


Agbanga-Brgy.Magcalape, PCCP PCCP ii.07/08/19
Asturias,Cebu ii.17,885,073.35 ii.17,885,073.35
18HF0193
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Convergence and Special i.Roads:Rehab.- i.Roads:Rehab.- i.06/17/19


Support Program-Const. / PCCP PCCP ii.09/26/19
Improvement of Access ii.14,700,000.00 ii.14,700,000.00
Road leading to Declared
Tourism Destination Brgy.
Simala, Sibonag, Cebu
19HE0017
ii.DPWH-Cebu 2nd DEO
iii.Project Manager

i.19HF0100-Concreting of i.Roads:Rehab.- i.Roads:Rehab.- i.12/11/2019


Brgy.Cantuod FMR, Brgy. PCCP PCCP ii. 01/17/2020
Cantuod,Balamban,Cebu ii.4,677,141.44 ii.4,677,141.44
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.Proposed Road Concreting/ i.Roads:Rehab.- i.Roads:Rehab.- i.08/24/2017


Improvement at Bawod- PCCP PCCP ii.03/04/2020
Sam-ang-Awihao, Toledo ii.87,301,581.98 ii.87,301,581.98
City
ii.City of Toledo
iii.Project Manager

i.19HF0018-Construction of i.Flood Control: i.Flood Control: i.07/07/2019


Flood Mitigation Structure at Construction- Slope Construction- Slope ii.03/09/2020
9|Page
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------
Combado River along Protection Protection
Toledo-Tabuelan-San Reme- ii.47,878,338.40 ii.47,878,338.40
Gio Road, Sitio Himungbo-
Ngan, Brgy. Cantuod,
Balamban,Cebu
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.19HF0001-Rehabilitation/ i.Flood Control: i.Flood Control: i.07/23/2019


Reconstruction of Cebu- Construction- Slope Construction- Slope ii.02/14/2020
Balamban-Transcentral Protection Protection
Highway with Slips, Soil ii.64,847,815.02 ii.64,847,815.02
Collapse and Landslide
K0038+960-K0039+360,
Brgy.Cansumoroy,
Balamban,Cebu
ii.DPWH-Cebu 3rd DEO
iii.Project Manager

i.19HF0105-Road Widening i.Roads:Rehab.- i.Roads:Rehab.- i.08/01/2019


Along Cebu-Balamban PCCP PCCP ii.03/03/2020
Transcentral Highway ii.28,039,991.35 ii.28,039,991.35
(S00266CB), K0045+049-
K0049+280, Barangay
Prenza, Balamban,Cebu
ii.DPWH-Cebu 3rd DEO
iii.Project Manager
i.20HE0021-Covergence i.Roads:Rehab.- i.Roads:Rehab.- i.02/11/2020
Special Support Program- PCCP PCCP ii.05/07/2020
Construction / Improvement ii.9,800,000.00 ii.9,800,000.00
Of Access Roads Leading to
Declared Tourism
Destination,Barangay
Simala-Lindogon Road to
Simala Parish Church
Brgy.Simala,Sibonga,Cebu
ii.DPWH-Cebu 2nd DEO
iii.Project Manager

i.20HA0031-Concreting of i.Roads:Rehab.- i.Roads:Rehab.- i.03/13/2020


San Isidro-Binayran Dampas PCCP PCCP ii.05/11/2020
Road,Tagbilaran City,Bohol ii.10,600,144.81 ii.10,600,144.81
ii.DPWH-Bohol 1st DEO
iii.Project Manager

On-Going Projects
None

10 | P a g e
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)

Contract ID :21HH0142
Contract Name: Convergence and Special Support Program-Special Road Fund
– Motor Vehicle User’s Charge (MVUC) As per R.A. 11239 – Rehabilitation /
Reconstruction of Road with Slips, Slope, Collapse and Landslide – Cebu –
Balamban Transcentral Highway K0015+795-K0015+938
Contract Location: Cebu City
--------------------------------------------------------------------------------------------------

Very truly yours,

Adelaida M. Paylado
(Name and Signature of Personnel)
Noted by:

Wilhelm T. Go
(Name and Signature of Personnel)

Republic of the Philippines )


City of Cebu ) S.S.

SUBSCRIBED AND SWORN TO before me this 8th day of September, 2021 affiant
exhibiting to me his Residence Certificate No. 3526917 issued on January 04, 2021 at Balamban,
Cebu.

Notary Public

Doc. No. ; Until


Page No. ; PTR No.
Book No. ; Date
Series of 2021 Place
TIN

11 | P a g e