POLOMOLOK WATER DISTRICT

DEMOGRAPHIC PROFILE
Name: Polomolok Water District
Category: B/Medium
Status: Operational
Address: Dulay Subdv. National Hi-way, Polomolok, So Cot. 9504
CCC NO.: 153

Management
Name Position
Engr. Solito T. Torcuator General Manager B
Ana Sorita S. ALovera Department Manager B
Marlene C. Cagata Division Manager B – Finance
Engr. Cecil D. Mirasol Division Manager B – Commercial
Engr. Nicasio B. Espesor Division Manager B – Engineering and
Operations

Vision – Mission Statement


Vision
To be the most cost – efficient, customer focused and environment friendly water
service provider in the country
Mission
We commit to
P rovide quality water 24/7 to our customers
R ehabilitate, develop and protect our watershed
O ptimize our available resources
A dopt cost – efficient operation
C ontinuously improve and expand our services
T tain and develop competent, committed and motivated employees
I nstitute programs on wastewater management
V igorously pursue NRW reduction program
E nsure excellent service that exceeds customer satisfaction

History
October 9, 1980 – The Polomolok Water District came into as an independent entity
under the aegis of the late Hon. Mayor Saturnino Calulo by virtue of Sangguniang
Bayan Res. No. 63 dated October 09, 1980 with Hilarion P. Visande, Jr. as its 1st
General Manager.
June 19, 1981 – Local Water Utilities Administration (LWUA) issued Conditional
Certificate of Conformance (CCC) No. 153 on June 19, 1981. This entitled the
Polomolok WD to all rights and privileges authorized under P.D. 198 as amended.
1982 – Availed a mini loan of P100,000.00 in the form of service connection
materials, pipes, fittings, plumbing tools, water meters and office equipments from
the Local Water Utilities Administration (LWUA).
1985 – Implemented the Interim Improvement Program for Phase IA Project worth
P5.7M for the construction of 1 deep well, installation of vertical turbine pump
including electro-mechanical components such as motor pump and providing a
stand-by diesel engine and provision for replacement parts and installation of various
sizes of pipes for transmission and distribution lines.
1989 – Construction of Sitio Cebuano Pump Station and valve appurtenances.
1990 – Construction of Polomolok WD Administration Bldg. using savings of
P860,000.00 from Phase IA Project.
Sept. 27, 1991 – WDs were declared as Government Owned and Controlled
Corporations (GOCC) by virtue of Supreme Court En Banc Decision.
1992 – Started the exploratory well drilling for the proposed Phase II Improvement
Project.
1995 – 1996 – Implemented the Phase II Expansion & Improvement Project. An
ADB/LWUA Project worth P68.221M for the construction of 5 deep wells located at
Brgy. Sulit, Pagalungan, Cannery and Polo, installation of vertical turbine pumps
including electro-mechanical components such as motor pumps and providing a
stand-by diesel engine and provision for replacement parts and installation of various
sizes of pipes for transmission and distribution lines.
2007-2008 – Appointment of Engr. Andresito J. Degilla as 2nd General Manager of
Polomolok WD. Implemented the Phase III Expansion & Rehabilitation and
Improvement Project worth P34.4M covering 15 new Subdivisions within the
Polomolok WD service area including the construction of additional deep well at
Brgy. Upper Klinan.
2009 – Utilized savings of P5M from Phase III Project for the expansion &
rehabilitation of mainline going to Silway-8 to increase pressure. The same year,
Polomolok WD was Recategorized from Average WD to Medium WD.
Board of Directors:

System of Operation
Private Entity (1980 – 1990)
Government Owned and Controlled Corporation (1991 – Present)
Purpose and Formation (PD 198 Chapter II Sec. 5)
Local water district may be formed pursuant to this Title for the purpose of

Acquiring, installing, improving, maintaining and operating water supply and


distribution systems for domestic, industrial, municipal and agricultural uses for
residents and lands within the boundaries of such districts
Providing, maintaining and operating wastewater collection, treatment and disposal
facilities, and
Conducting such other functions and operations incident to water resources
development, utilization and disposal within such districts, as are necessary or
incidental to said purpose.
Engineering and Operations Division
Determines water production requirements and ensures the steady supply of water
to the service area;
Maintains water pumps and water treatment facilities and water quality in
accordance with the standards set by the Philippine National Standards for Drinking
Water & World Health Organization;
Conducts preventive maintenance and repair of equipment and facilities.
Initiates programs for protection and development of water resources and watershed
areas.
Initiates programs for protection and development of water resources and watershed
areas.
Implements programs for extension, expansion, and improvement of water supply
system and undertakes repair and maintenance of transmission and distribution
pipelines, including appurtenances.
Formulates and implements corrective maintenance of water meters and other
measuring devices;
Plans and designs mainline extension, including mainline improvement, water supply
system, pumping facilities and other structures.
Production& Const’n. & Maintenance Services ( 2 Sections)
Comments:
Water Districts helps the people in providing water. Water is very important to the
people. Water should remain available during breakdown periods of pipeline. System
of distribution should not such that if one pipe bursts, it puts a large area without
water. Polomolok Water District have achieved its goal by providing their district a
tons of water. Also not only water they provide but also they have many activities
that would also help the people and the environment.