Professional Documents
Culture Documents
MEMORANDUM CIRCULAR
NO. 2013-____
I. BACKGROUND
The Department of the Interior and Local Government (DILG) remains as the lead
agency in the implementation of the 2013 SALINTUBIG Program and the BUB
approach. The Department executes these initiatives through its Office of Project
Development Services (OPDS), in partnership with the DILG Regional Offices
(ROs) and the target Provinces and Municipalities as implementing partners.
DILG has been appropriated a total of One Billion Eight Hundred Ten and Nine
Hundred Thirty Thousand Pesos (PhP 1,810,930,000.00) for the implementation of
the SALINTUBIG Program and priority water supply projects identified through the
BUPB approach under the 2013 General Appropriations Act (GAA). Funds shall
be used for the Project Operations/Capacity Development and for the Infrastructure
Investments.
1
II. IMPLEMENTING GUIDELINES
The Guidelines contained herein prescribe the strategies, procedures, roles and
responsibilities in the implementation and management of the 2013 SALINTUBIG
Program and BUB priority water supply projects in the target municipalities.
These shall guide the concerned DILG Offices and staff involved in Program
implementation.
2. LGU Beneficiaries
All LGUs must be awardees or must comply with the DILG’s Seal of Good
Housekeeping (SGH) Policy.
b. Under the BUPB: 347 priority areas with identified need for water supply;
a. The DILG through the OPDS and DILG-ROs shall assess the technical,
financial, and institutional capacities of the target LGUs. Assessment shall
be undertaken through surveys, interviews and workshops with the key
functionaries of the LGUs and concerned entities.
5. Program Components
a. Capacity Development
Eligible projects for grant and capacity development assistance shall include
those identified in Section II.2 of these Guidelines.
6. Project Implementation
Projects will be identified through the conduct of the Water and Sanitation
Assessment. Projects shall be endorsed by the Local Development
Council and included in the Local Comprehensive Development Plan
(CDP), Local Development Investment Plan (LDIP), and Local Poverty
3
Reduction Action Plan (LPAP). In particular, for the BUPB, the reference
would be the LPRAP
The DILG-ROs shall prepare the MOA for the project to be signed by the
concerned LGU and DILG-ROs. The signed MOA shall be one of the
prerequisites for the awarding of grant assistance to the LGUs. The MOA
together with the approved project proposal (including source
confirmation/validation), shall be one of the basis of release of the initial
funding
4
• DEDs will not be required for projects costing below P 1 million; only
program of works including drawings and schematic diagrams shall be
submitted.
i) Construction Monitoring
• The DILG Region and the Field Offices together with the identified
CSOs shall closely monitor the projects.
6
2. DILG Regional Offices (ROs)
• Take the lead in the overall implementation of the Program at the regional
level, particularly the administration of the infrastructure projects
• Facilitate the compliance of the LGUs with the Seal of Good
Housekeeping (SGH)
• Enter into MOA with Municipalities or Implementing Partners for
construction of water supply systems and capacity development activities
• Convene its special BAC with representatives from OPDS or Technical
Working Group (TWG) with representative from OPDS of procurement of
required goods and services
• Procure consulting services or engage services of Government Agencies
for the preparation of Detailed Engineering Design (DED) and program of
works for the LGUs
• Through the Project Development Management Unit (PDMU), take the
lead in the implementation of the capacity development activities
• Supervise the DED Consultants in the preparation of engineering designs
and program of works for the LGUs
• Review, validate and approve project proposals and DEDs submitted by
the LGUs
• Provide technical assistance to the LGUs during procurement and
construction
• Conduct inspection and validation of work accomplishments for the
release of funds for infrastructure investments
• Conduct advocacy activities in coordination with DILG-CO
• Utilize and liquidate funds for program operations or specific capacity
development activities in accordance with accounting and auditing rules
and regulations
• Submit liquidation reports and verified monthly reports of disbursement to
DILG-CO (Finance Management Service)
• Perform monitoring functions described in Section V of these Guidelines
7
5. Role of Municipal Government
8
• Submit to DILG-ROs verified Statement of Expenditures (SOE) duly
designed by the Treasurer, Accountant and verified by the Auditor and
Statement of Receipts and Disbursements (SORD)
• Perform monitoring functions described in Section V of these Guidelines
The Php1.810,930 Million allocated under the 2013 GAA shall be utilized based
on the approved Work and Financial Plan for the following expenditures:
Maximum
Category Allocation Remarks
(Php Million)
Waterless 7.0 Million To be identified based on the 455
Municipalities waterless municipalities identified
by NAPC.
Waterless 1.0 - 3.0 Million Project sites are the waterless
Barangays barangays with high level of
waterlessness, poverty incidence,
and water borne diseases.
9
Waterless .25 M-1.0 Project sites to be identified by the
Rural Health Million CHD
Units (RHUs)
Waterless 2.5 M-6.0 Project sites are those implemented
Resettlement Million by the National Housing Authority
Areas (NHA) which have been transferred
to the LGUs. These may also
include those implemented by the
LGUs, and preferably with
organized groups and not covered
by the franchise area of water
districts.
BUPB LGUs Depending on
LGU Proposal
as provided in
the LPRAP
approved by
DBM/NAPC
• For the Project operation at the national level, WSSU-OPDS shall use
part of the fund for the professional services and the maintenance and
operating expenses. At the regional level, DILG CO shall allocate and
sub-allot the funds to the Regions on quarterly basis subject to
liquidation of funds previously sub-allotted. DILG-ROs shall charge
expenses for professional services and maintenance and operating
expenses to the funds allocated and transferred to them. DILG-ROs
shall be responsible for the liquidation to DILG CO to be submitted on
monthly basis.
• For the capacity development activities, fund shall be sub-allotted by
the DILG CO to the host regions on activity basis. Liquidation shall be
made within 14 days from the completion of the said activity.
Items not allowed include the (i) salaries of personnel, (ii) operating and
maintenance expenses, (iii) office equipment, furniture and fixtures), (iv)
land acquisition, and (v) social preparation activities. Grant shall not cover
construction supervision cost.
10
• The Provinces/Municipalities shall allocate an equivalent of 10% of the
total project cost for financing of the following activities:
o Implementation of Sustainable Sanitation Program including
Behavioral Change Communication, which includes barangay
orientation and consultation on sanitation and hygiene;
o Participation of its elected officials and technical staff in the Capacity
Development for the preparation, implementation, and operations of
the water system; and
o Any of the following activities:
- Establishment of monitoring system for the sustainable
management and operation of the water systems included in the
local water supply project;
- Establishment of reporting and monitoring system for environmental
health related diseases and outbreaks;
- Civil works equity, in case the proposed civil works cost is more
than the maximum allocation;
- Incremental cost for project preparation such as the feasibility
study, and land acquisition or right-of-way (ROW), and
administrative costs for the Program implementation at the local
level.
• In the event that the Project Cost (DED and Civil Works) is more than the
Project funds, the excess amount shall be borne by the
Provinces/Municipalities and shall form part of the local counterpart.
• The LGUs shall open special trust account in a Government Bank (lf there
is existing Trust Account, separate the book of accounts for the 2013
Salintubig and BUPB priority projects).
• For projects of more than Php 1.0 Million, funds shall be released in two
equal tranches to LGUs, upon compliance to the following conditions:
11
Certification of newly opened trust
account (or if there is existing
trust account, separate the
books of account)
• For BUPB LGUs with proposed projects of less than Php 1.0 Million cost,
fund shall be released in one (1) tranche to LGUs, upon compliance to the
following conditions:
o The DILG CO and DILG-ROs shall conduct periodic spot check on fund
utilization, proper utilization of book of accounts, and overall financial
management of the Province.
1. M & E Process
2. Institutional Arrangements
d. WSSU-OPDS
• Monitor overall Program implementation
• Review, evaluate and validate physical and financial performance
based on submitted reports from the regions that may be required on
special cases.
• Facilitate the resolution of issues/concerns on program implementation
as elevated by the regions and formulate corresponding recommended
action/s.
• Consolidate monthly progress reports submitted by the DILG-ROs to
be forwarded to the Undersecretary for Local Government not later
than the 16th day of ensuing month.
• Prepare and submit quarterly progress reports to NAPC-PMO not later
than the 16th day of ensuing month.
• Prepare periodic reports (annual and other special reports), and submit
to DILG Central management and other concerned
NGAs/stakeholders, as required.
• Through the Finance Management Service (FMS)/Assistant Secretary
for Finance and Comptrollership, submit financial status report (DBM
Form: Physical and Financial Accomplishment) to DBM Bureau D.
Following shall be the time table for the implementation of the Program
2013 SALINTUBIG ACTIVITY TARGET DATE
Project Start-up st
1 week of November 2012
• Conduct of Program Orientation nd
• LGUs Assessment 2 week of January 2013
• Compliance of the LGUs on the Project
Requirements (Issuance of SB Resolution,
Signing of MOA, Creation of Watsan
Council/PMU, Opening of Trust Account,
Compliance with SGH)
15
1st
Preparation of Detailed Engineering Designs week of March 2013
4th
week of May 2013
VII. EFFECTIVITY
MAR ROXAS
Secretary
16