You are on page 1of 1

REVISED

ONLY
BUS
KISS & RIDE

KISS & RIDE


PLAN SHOWING LOCATION OF SURFACE DRAINAGE AT FUENTE STATION
SCALE : N. T. S.

12m Ht. STREET LIGHTING 12m Ht. STREET LIGHTING

3m Ht. PERIMETER 3m Ht. PERIMETER


LIGHTING LIGHTING

BIKE BOLLARD
B 100mm WIDE x 30mm 100mm WIDE x 30mm
B
DEEP LATERAL DITCH DEEP LATERAL DITCH
BIKE BOLLARD

300mm WIDE 300mm WIDE


CROSS DRAINAGE CROSS DRAINAGE
WITH COVER WITH COVER

SECTION A
SCALE : N. T. S.

CONTRACTOR : CONSULTANT CEBU BRT - PIU PROJECT AND LOCATION SHEET CONTENTS SHT. NO.
SUBMITTED BY: CHECKED & REVIEWED BY: NOTED BY: SHOP DRAWING
PROCUREMENT OF PACKAGE 1: WORKS
REPUBLIC OF THE PHILIPPINES
CEBU SOUTH BUS TERMINAL (CSBT) TO SD-D
DEPARTMENT OF TRANSPORTATION CAPITOL URBAN REALM ENHANCEMENT LOCATION OF SURFACE DRAINAGE
HUANG QUNHONG JANG SEUCK JUN NORVIN V. IMBONG
CEBRT PROJECT MANAGEMENT OFFICE
UNIT 25, 3rd Floor, Legaspi Tower Building
Vito Cruz corner Roxas Boulevard, Malate, Metro Manila PROJECT MANAGER SENIOR PAVEMENT ENGINEER
BRT - NATIONAL PROGRAM MANAGEMENT OFFICE
PINATUBO STREET, CORNER OSMEÑA STREET
PROJECT MANAGER
(LINK TO THE PORT) AT FUENTE STATION 1 2
BRGY. CLARO M. RECTO, CLARK FREEPORT ZONE
CONTRACTOR CONSULTANT 2009 PAMPANGA, PHILIPPINES CEBRT-PIU CEBU CITY, REGION VII

You might also like