You are on page 1of 1

NOTES:

*THREE PILE CAP(BEAM ACTION) · REFER ARCHITECTURAL DWG ALONG WITH THIS
DWG.
B B B · BUILDING IS DESIGNED FOR GROUND + 10 +
0.6000 PILE CAP EDGE
TERRACE FLOOR.
0.5196
COLUMN AT L-JUNCTION
500X500 MM
· USE MIX M:30
PILE CAP EDGE
75 MM CLEAR COVER PILE CAP EDGE · USE FE.500D GRADE STEEL.
COLUMN AT L & T-JUNCTION
500X500 MM PILES OF DIA 600 MM 75 MM CLEAR COVER
· CLEAR COVER
1.8804 1.8804
75 MM CLEAR COVER
BOTTOM MESH REINFORCEMENT OF PILE CAP
a. PILE CAP 75 MM FROM ALL SIDES
20 MM DIA AT 100 MM C/C DISTANCE

1.5000 1.5000 PILES OF DIA 600 MM


COLUMN AT L-JUNCTION
500X500 MM
SPACER BLOCKS b. COLUMN 50 MM
0.5000 c. BEAM 50 MM
0.5000 PILES OF DIA 600 MM
d. PILES 50 MM
0.6000 1.5000 0.6000 MAIN REINFORCEMENT OF COLUMN

A' A' OF DIA 20 MM


A' · LAPPING AT BEAMS 40*D
A 0.1500
0.5706 0.5706
A STIRRUPS OF DIA 8 MM A HELICAL BINDING
· MINIMUM PROJECTION OF PILE INTO PILE CAP IS
OF PITCH 150 MM OF DIA 8 MM
MAIN REINFORCEMENT OF PILE
0.0750 8 NO.S OF DIA 20 MM

MASTER RING
75 MM.
2.4000 AT 1000 MM INTERVAL
OF DIA 12 MM · MINIMUM DISTANCE TO BE KEPT BETWEEN PILE
BINDING BARS FOR PILES
OF DIA 8 MM
FACE/COLUMN AND PILE CAP EDGE IS 150 MM.
· C/C DISTANCE BETWEEN THE TWO PILES = 2.5*D
B' B' B' = 2.5 * 600
PLAN SHOWING PLAN SHOWING = 1500 MM
PLAN · DEPTH OF THE PILE CAP
PILE CAP REINFORCEMENT PILES REINFORCEMENT = 2.25 * D
= 2.25 * 600
= 1350 MM
COLUMN AT L JUNCTION 400X400 MM COLUMN AT L JUNCTION 400X400 MM
COLUMN MAIN REINFORCEMENT OF 20 MM DIA COLUMN MAIN REINFORCEMENT OF 20 MM DIA
STIRRUPS OF 8 MM DIA STIRRUPS OF 8 MM DIA

TOP MESH REINFORCEMENTT OF PILE CAP TOP MESH REINFORCEMENTT OF PILE CAP
OF 20 MM DIA AT 100 MM C/C DISTANCE
BLOCK 150 MM
OF 20 MM DIA AT 100 MM C/C DISTANCE * PRECAST END BEARING PILE
BLOCK 150 MM
EXTRA BAR EXTRA BAR
PLINTH BEAM 300X550 MM PLINTH BEAM 300X550 MM
G.L. PLINTH BEAM MAIN REINFORCEMENT
OF DIA 16 MM
G.L. PLINTH BEAM MAIN REINFORCEMENT
OF DIA 16 MM
STIRRUPS 8 MM DIA STIRRUPS 8 MM DIA
0.5500 0.5500
LAPPING 40*D LAPPING 40*D
0.1500 0.1500

0.6000 0.6000 0.6000 0.6000

0.
07
00

50
0.
00

90

60
60

0.

00
0.

0.
1.5000 1.5000

15
0.6000 0.6000

00
0.0750

PCC BED 150 MM PCC BED 150 MM


0.9000 1.5000 1.5000 2.4000 1.5000 1.5000 2.4000

00

0.
60
60

00
50 0.
0.1500

1.
00
07

50
50
0.

00
00

2.
1.
1.5000

40
40

00
2.
0.6000 1.5000 0.6000 1.5000
2.4000

0.
90
00
00
15
2.4000 2.4000

0.
BRICK WALL 150 MM THK BRICK WALL 150 MM THK
E1 (0.40X0.40) E2 (0.45X0.45) E3 (0.50X0.50) E4 (0.50X0.50) E5 (0.45X0.45)

0.6000
0.5706
0.1500
0.6000 0.6000

0.0750

1.8804
0.6000
1.5000
0.6000 0.6000 0.6000 0.6000
1.5000 1.5000 1.5000 1.5000

1.5000
BOTTOM MESH REINFORCEMENT

1.5000
2.4000

0.6000

0.5196

2.4000
1.5000
1.5000 1.5000 2.4000 3.0213 3.0213

BOTTOM MESH REINFORCEMENT

1.5000
0.6000 0.6000
1.5000 1.5000 1.5000 1.5000

0.6000
0.6000 0.6000 0.6000 0.6000
0.6000 1.5000

OF 20 MM DIA AT 100 MM C/C DISTANCE

1.8804

0.0750
OF 20 MM DIA AT 100 MM C/C DISTANCE

0.5706
0.9000
2.4000
0.1500 0.1500

0.6000

0.1500
0.0750 0.0750

TIE BARS ON EACH FACE TIE BARS ON EACH FACE D1 (0.45X0.45) D2 (0.55X0.55) D3 (0.60X0.60)
3.0213 3.0213

D4 (0.60X0.60) D5 (0.50X0.50)
OF DIA 8 MM OF DIA 8 MM
PILES OF DIA 600 MM PILES OF DIA 600 MM
0.6000 0.6000 0.6000 0.6000

1.5000 1.5000
0.6000 0.6000 0.6000 0.6000 0.6000 0.6000
1.5000 1.5000 1.5000 1.5000 1.5000 1.5000

1.5000 1.5000 2.4000 3.0213 3.0213 3.0213 1.5000 1.5000 2.4000

8 NO.S OF PILE'S MAIN REINFORCEMENT OF DIA 20 MM 8 NO.S OF PILE'S MAIN REINFORCEMENT OF DIA 20 MM 0.6000 1.5000
0.6000
1.5000
0.6000
1.5000
0.6000 0.6000
1.5000
0.6000
1.5000
0.6000 0.6000
1.5000
0.6000
1.5000
0.6000
0.6000 1.5000

2.4000 2.4000
0.1500 0.1500 0.1500

HELICAL BINDING
0.0750 0.0750 0.0750

3.0213 3.0213 3.0213

HELICAL BINDING C1 (0.50X0.50) C2 (0.60X0.60) C3 (0.65X0.65) C4 (0.65X0.65) C5 (0.55X0.55)


OF PITCH 150 MM OF DIA 8 MM OF PITCH 150 MM OF DIA 8 MM
MASTER RING OF DIA 12 MM
0.6000 0.6000 0.6000 0.6000

MASTER RING OF DIA 12 MM 1.5000


0.6000
1.5000 1.5000
0.6000 0.6000
1.5000 1.5000
0.6000 0.6000
1.5000 1.5000
0.6000
1.5000

AT 1000 MM INTERVAL AT 1000 MM INTERVAL


1.5000 1.5000 2.4000

1.5000
0.6000
1.5000
3.0213

1.5000
0.6000
1.5000
3.0213

1.5000
0.6000
1.5000
3.0213 1.5000 1.5000 2.4000

0.6000 0.6000 0.6000 0.6000 0.6000 0.6000


0.6000 1.5000 0.6000 1.5000

2.4000 2.4000
0.1500 0.1500 0.1500
0.0750 0.0750 0.0750

3.0213 3.0213 3.0213

B1 (0.50X0.50) B2 (0.60X0.60) B3 (0.65X0.65) B4 (0.65X0.65) B5 (0.55X0.55)

0.6000 0.6000

0.5196 0.5196
0.6000 0.6000 0.6000 0.6000

00
90
0.
1.5000 1.5000

00
1.8804 1.8804

40
1.8804 1.8804

00

2.
50
1.
1.5000 1.5000 1.5000 1.5000

00
60
1.5000 1.5000 2.4000 1.5000 1.5000 2.4000

0.
0.6000 1.5000 0.6000 0.6000 1.5000 0.6000
0.5706 0.5706 0.5706 0.5706

00
15
0.6000 1.5000 0.6000 1.5000

0.
0.1500 0.1500

00
0.0750 0.0750

60
0.
50
07
2.4000 2.4000

0.
2.4000 2.4000

A1 (0.45X0.45) A2 (0.50X0.50) A3 (0.55X0.55) A4 (0.55X0.55) A5 (0.50X0.50)

KEY PLAN

PILE FOUNDATION
VINAYAK BHARAT CHIPLUNKAR 1817
PILE SHOE PILE SHOE
0.6000
CAST IRON PILE SHOE 0.6000
SIR J.J. COLLEGE OF ARCHITECTURE
0.8500 CAST IRON PILE SHOE
0.8500

0.2200 0.2200 BUILDING CONSTRUCTION


0.0300 0.0300
SEM VII SIGN: PLATE NO:
SECTION AA' SECTION BB' SCALE : - 3

You might also like