Professional Documents
Culture Documents
-------------
INSTALLATION:
l .REMOVE ANODE & BOTIOM INSULA fOR FROM SLEEVE PRIOR TO INSTALLATION
3.FIT SLEEVE IN STRAINER LID & INSERT ANODE C/W BOTIOM INSULATOR FROM BELOW.
NOTES:
NYLON SLEEVE INSULATION TO BE USED ON STRAINER OR PIPE MOUNTINGS ONLY.
.
//
((
6 ANODE STUD
'\
STRAINER LID- 2 FLAT MACHINED PARALLEL SURFACES 95mm DIA C/W \ \
7 40mm DIA HOLE IN CENTRE
8 NYLON MOUNTING SLEEVE
100
9 CABLE GLAND 10
10 WASHER
11 FULL NUT TEL: +44 (0)1246 457900
12
13
HALF NUT
6mm SQ DOUBLE INSULATED CABLE BY CATHELCO- SM LG EXTENSION
Cathelcol
SCALE: NTS DO NOT SCALE.
FAX: +44 (0)1246 457901
EMAIL: technical@cathelco.com
TITLE:
SHEET SIZE: A4 SHEET: 1 OF 1 ARRANGEMENT OF TYPE 2
14 0 RING TO SEA ITEMS 8 & 15
ORN BY: NRB DATE: 15.08.2011 ANODE C/W NYLON SLEEVE
MOUNTING SLEEVE LID (C/W 2 OFF 6 DIA HOLES ON A 60 PCD FOR A APP' BY: CH DATE: 16.08.2011 (F-TYPE) MOUNTING
15 PIN SPANNER) FITIED TO ITEM 8 DRG TYPE: MANUAL DRG NO: A3080/84214 I REV: 2