SUNCOR ENERGY INC.
CANADA
1_| 3t-Jan-06_| issued for implementation ‘A. Devenider A. Deverder | OF Tilis
ev | __ Date Document Status ‘Originator | Engineer | Reviewer
‘UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-2004-001 - 2-4-47
File Name: FB-R-5638_- Rev_1_- HVAC_Unit Heater DOC Page 10f7.1.0
20
3.0
40
5.0
6.0
7.0
8.0
SUNCOR
Tueney TECHNICAL STANDARD
Sabet Namba Fev
HVAC UNIT HEATERS FB-R-5638 41
REVISION HISTORY
aia Description
ian-06 | eed Yor inglmentaton
“0:ar-08—| Tssuod for External Squad Cheek
¥5Sep:05 | Issued for ntomal Squad Check
‘This standard fs based on Suncor Energy Inc. Standard No. SPS1-R-9 Rev. 1A)
and has been developed specially for use on Frebag Project,
TABLE OF CONTENTS
SCOPE OF STANDARD
INTRODUCTION
2.1 Location
2.2 Responsibility
23° Conflict
24 Terms and Definitions
25 Units of Measurement
2.6 Exceptions
CODES, STANDARDS AND REGULATORY REQUIREMENTS,
PROJECT STANDARDS,
OPERATING CONDITIONS
TECHNICAL REQUIREMENTS:
61 General
62 Glycol Unit Heaters
6.3 Explosion Proof Electric Unit Heaters
6.4 —_Non-Explosion Proof Electric Unit Heaters
6.5 Installation
INSPECTION AND TESTING
‘SHIPPING, HANDLING AND STORAGE
Fle Neme: FB-R-5638_- Rev_
‘UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-204-001 - 2-447"
- HVAC Unit Heater.00¢ Page 2 0f7Sun cor) TECHNICAL STANDARD
SubjeeE
Number Revision!
HVAC UNIT HEATERS FB-R-5638 1
2.0
24
244
22
224
23
23.4
24
244
24.2
25
25.1
SCOPE OF STANDARD
This document presents the minimum requirements for the design, manufacturing, supply and
installation of HVAC unit heaters for Suncor Firebag Projects.
INTRODUCTION
LOCATION
The HVAC systems will be installed in the Suncor Energy Firebag Facility located
approximately 45 km NE of existing Suncor upgrader plant near Fort McMurray, Alberta,
Canada.
RESPONSIBILITY
Compliance by Contractor with this standard does not relieve Contractor of his responsibility
for furnishing and installing equipment of proper design, mechanically suited for the specified
service conditions.
CONFLICT
Any conflict between this document, codes, standards, regulatory requirements or other
contractual documents shall be brought to Suncor's attention for resolution before proces
TERMS AND DEFINITIONS
“Suncor” means owner or purchaser and is defined as Suncor Energy Inc.
“Contractor’ means vendor, supplier or manufacturer that supplies the materials and
services.
UNITS OF MEASUREMENT
All units of measure shall be reported in the International System of units (SI) in accordance
with CAN/CSA Z234.1-89, Canadian Metric Practice Guide. Dimensions shall be presented
first in SI units followed by the equivalent value in imperial units shown in parentheses.
Where imperial-sized materials such as plate are used (or where imperial dimensions are
controlling), dimensions shall be first specified in SI units (after hard conversion), with
equivalent imperial sizes specified in parentheses. Piping flanges and bolting shall be shown
in imperial units only (i.e. NPS 4).
UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-2004001 2447
Fle Name: FB-R-8638_- Rev_1
HVAC Unit Heater.0C Page 3of7Suncor) TECHNICAL STANDARD
‘Subject
Number Revision
HVAC UNIT HEATERS. FB-R-5638 fl
26
26.4
3.0
3.0.1
4.0
4.0.1
5.0
5.0.1
EXCEPTIONS
Any exceptions to this standard shall be made in writing at the time of quotation submission.
Alll exceptions shall be clearly identified and explained in Contractor's proposal. Exceptions
shall be permitted only after Suncor has given written approval.
CODES, STANDARDS AND REGULATORY REQUIREMENTS
The HVAC unit heaters shall be designed, fabricated, tested an
with the latest applicable edition and addenda’s of the followin,
date:
inspected in accordance
effect at contract award
ARI Air Conditioning and Refrigeration Institute
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers
CEC Canadian Electrical Code
CSA Canadian Standards Association
OHSA ‘Occupational Health and Safety Act
ULC Underwriters Laboratories of Canada
PROJECT STANDARDS
‘The latest version of the following Firebag Projects standards shall be complied with for the
HVAC unit heaters.
FB-A-5672 Plant Noise Level Control
FB-A-5673 Equipment Protection During Transit and Storage at Jobsite
FB-P-5552 Induction Motors 600 Volts and Below
FB-R-§632 HVAC Mechanical General Requirements and Testing
OPERATING CONDITIONS
Refer to the Site Conditions Data Sheet for outdoor condition and contract for indoor
condition.
UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-08) CONTROLLED DOCUMENT IN JPI EWR 100.2004.001 - 244-7
Fle Name: FB-R-5638_- Rev
--HVAC Unit Heater.D0C Page 4 of7.Suncor) eee nar ecnenoaeneT
TECHNICAL STANDARD
‘Subject
‘Number Revision
HVAC UNIT HEATERS. FB-R-5638 4
6.0
64
644
61.2
62
6.2.1
6.22
6.23
6.24
625
6.26
627
628
629
TECHNICAL REQUIREMENTS
GENERAL
The noise level of HVAC unit heaters shall meet the requirements of Firebag Projects
standard FB-A-5672.
All unit heaters shall be CSA approved. The Unit heaters located in classified areas shall be
approved for the area in which they are located.
GLYCOL UNIT HEATERS
Cabinet steel shall be coated to avoid corrosion and equipped with adjustable louvers and
suitable mounting kit.
Coils shall be built with steel tube and aluminum fins. Pipe headers shall be schedule 40 steel
with ASME 150# raised face connections. Coils shall be hydrostatically tested to 2070 kPag.
Fans shall be direct drive propeller type, made of aluminum, factory balanced with
anti-corrosive finish and fan guard.
For unclassified buildings, motors shall be totally-enclosed type, continuous duty with builtin
‘overload protection and resilient motor supports.
For electrical classified buildings, the heaters shall be provided with explosion-proof motors
and non-sparking fans.
Air outlets shall be equipped with four-way adjustable louvers for horizontal units and louvered
cone diffusers for vertical units.
Capacity shall be indicated based on 120 °C entering tri-ethylene glycol
Thermostats will be provided by others.
Contractors shall supply Engineered Air or Trane products unless otherwise approved by
Suncor.
UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-2004001 244-7
File Namo: FB-R-5638_- Rev_1
= HVAC_Unit Heater.DOC Page 5 of 7Suncor) TECHNICAL STANDARD
See amber Revision
HVAC UNIT HEATERS FB-R5638 4
6.3 EXPLOSION PROOF ELECTRIC UNIT HEATERS
6.3.1 Cabinet steel shall be coated to avoid corrosion and equipped with adjustable louvers and
Suitable mounting kit.
6.3.2 Heat exchanger shall be built with steel tubes with aluminum fins. It shall be filled with
ethylene glycol, water and corrosion inhibitors. Heavy-duty immersion heating elements shall
be brazed into a heavy steel bulkhead.
6.3.3 Fan and motor assembly shall be direct drive propeller type, aluminum, factory balanced, with
anti-corrosive finish and fan guard. Fan blades shall be aluminum and non-sparking. Motor
shall be permanently lubricated, thermally protected and explosion proof rated for continuous
duty.
6.3.4 The Heater shall be completely factory wired and tested and enclosed in an explosion proof
enclosure with magnetic contactor, control circuit transformer, printed circuit block with
terminal block and secondary fuse protection. Explosion-proof thermostat will be provided by
others.
6.3.5 Contractor shall supply Ruffneck VacuCore Series products unless otherwise approved by
Suncor.
6.4 NON-EXPLOSION PROOF ELECTRIC UNIT HEATERS
6.4.1 Cabinet steel shall be coated to avoid corrosion and equipped with adjustable louvers and
suitable mounting kit.
6.4.2 Fans shall direct drive propeller type, made of aluminum, factory balanced, with anti-corrosive
finish and fan guard.
6.4.3 Motors shall be totally-enclosed type, continuous duty with built-in overload protection and
resilient motor supports.
6.4.4 Air outlets shall be equipped with four-way adjustable louvers for horizontal units and louvered
cone diffusers for vertical units.
6.4.5 Unit heaters shall be provided with contacts for thermostat installation. Thermostats will be
provided by others.
6.4.6 Contractor shall supply Caloritech or Chromolox products unless otherwise approved by
Suncor.
UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-2004-001 - 2-447
Fle Name: FB-R-5638_- Rev_
HVAC Unit Heater.00¢ Page 6 of 7Suncor) TECHNICAL STANDARD
Suet Number Favion
HVAC UNIT HEATERS. FB-R-5638, 4
65 INSTALLATION
6.5.1 _ Installation shall be executed in accordance with manufacturer's instructions.
6.5.2 All installation work shall be performed in a safe manner and shall be subject to all OSHA
safety requirements.
6.5.3 The following accessories shall be installed for glycol units heaters:
a. ASME 150# Raised Face Connection.
b. Isolation valves on inlets.
c. Balancing valves on outlets.
d. Pressure and temperature test plugs on inlets and outlets.
e. Drain valves at low points.
f. Manual air vent at high points.
6.5.4 _ Final connections to glycol piping shall be made by others.
6.5.5 Unit heaters shall be isolated from structure using rubber-in-shear with 12 mm deflection.
Where necessary, supplementary suspension steel shall be provided.
7.0 INSPECTION AND TESTING
7.0.1 Contractor shall test unit heaters in accordance with FB-R-5632.
8.0 SHIPPING, HANDLING AND STORAGE
8.0.1. Shipping, Handling and Storage of unit heaters shall meet the requirements of Firebag Projects
standard FB-A-5673.
UNCONTROLLED DOCUMENT WHEN PRINTED (31-Jan-06) CONTROLLED DOCUMENT IN JPI EWR 100-2004-001 244-7
File Name: FE-R-5838_- Rov
HVAC _Unit Heater,00C Page 7 of 7Suncor)
TECHNICAL STANDARD
REVISION REVIEW AND APPROVAL
No:,
FIREBAG PROGRAM
TECHNICAL STANDARD
REVISION REVIEW AND APPROVAL
Doc. No. _FB-R-5638 Current Rev.No.: 1 Date: _31-Jat
Document Title: HVAC Unit Heaters
Issuing Department: _ Mechanical Date: 31-Jan-06
To: From:
DESCRIPTION OF CHANGE
(Attach the draft/revised Technical Standard)
Reasons for Change — Creation of a Firebag Program Technical Standard
Revisions:
‘Additions:
Deletions:
‘Comments
Originator
Arcot Devender
Firebag Mechanical Program Lead
Ware
Engineer
Arcot Devender
Firebag Mechanical Program Lead
(Also sign front page of
‘T8)
Reviewer
Dave Tullis
Firebag Engineering Manager
3 bok
(sos fabe
‘Approval Authority
Ken Hart
Firebag Operations Manager
Bree a
)
Return to
Rita Lewis
Jacobs Canada
Heritage Square
Attachment — Firebag Projects Standard No. FB-R-5638 - Rev. No. 1 - Issue Date 31-Jan-06
UNCONTROLLED DOCUMENT WHEN PRINTED (37-JAN-08) CONTROLLED DOCUMENT IN EWR FILE LOGATION, 1
(rom:
EWR 100-2006. 001 2-4 -FB-
Rev. Page: Toft)