Professional Documents
Culture Documents
Fire Alarm Fire Alarm Notes: Symbols Abbreviations Fire Protection
Fire Alarm Fire Alarm Notes: Symbols Abbreviations Fire Protection
1. PROVIDE 100% FIRE SPRINKLER COVERAGE FOR BUILDING AREA SHOWN ON AD AREA DRAIN
CONTRACT DOCUMENTS. FIRE SPRINKLER PIPING SHALL BE DESIGNED IN AFF ABOVE FINISHED
AFF ABOVE FINISHED FLOOR ACCORDANCE WITH LOCAL BUILDING CODES, NFPA 13 AND OWNERS INSURNACE AHU FLOOR
SYMBOL DESCRIPTION A. A FIRE ALARM CONTROL UNIT (FACP) SHALL BE PROVIDED
H. THE FIRE ALARM SUB-CONTRACTOR (CONTRACTOR) APPROX AIR HANDLING UNIT
A TO MONITOR ALL FIRE SPRINKLER SYSTEM RELATED FIRE SHALL BE RESPONSIBLE FOR OBTAINING, AND PAYING AHJ AUTHORITY HAVING JURISDICTION UNDERWRITERS.
AVG APPROXIMATE A
PUMP SUPERVISORY SIGNALS, WATER FLOW AND VALVE FOR, ANY AND ALL PERMITS REQUIRED PRIOR TO
TAMPER SWITCHES, MANUAL PULL STATIONS, SMOKE BEGINNING WORK AT THE DIRECTION OF THE GENERAL AHU AIR HANDLER UNIT SHUTDOWN 2. THE FIRE SUPPRESSION SYSTEM, AS SHOWN ON THE CONTRACT DOCUMENTS, IS
SCHEMATIC IN NATURE AND INDICATES THE AREAS TO BE COVERED BY THE
AVERAGE
FACP FIRE ALARM CONTROL PANEL DETECTORS, HEAT DETECTORS, AND AUTOMATIC CONTRACTOR. AIM ADDRESSABLE INPUT MODULE SUPPRESSION SYSTEMS. THE FINAL DESIGN OF THE SYSTEM SHALL BE PREFORMED
BA BREATHING AIR
SUPPRESSION SYSTEMS. THE NEW SYSTEM SHALL BE A BY A LICENSED INDIVIDUAL CERTIFIED TO A MAXIUMUM LEVEL III, IN THE SUB-FIELD OF
FULLY FIELD PROGRAMMABLE MICROPROCESSOR - ALT ELEVATOR RECALL, ALTERNATE "AUTOMATIC SPRINKLER SYSTEM LAYOUT," THROUGH THE NATIONAL INSTITUTE FOR
BLDG
BOP
BUILDING
BOTTOM OF
BASED SYSTEM CAPABLE OF TWO-WAY COMMUNICATION CERTIFICIATION IN ENGINEERING TECHNOLOGIES (NICET).
SFACU SUB-FIRE ALARM CONTROL UNIT OVER SIGNALING LINE CIRCUITS BETWEEN ADDRESSABLE I. THE CONTRACTOR SHALL PROVIDE, AS PART OF THE AOM ADDRESSABLE OUTPUT MODULE BYP PIPE
INTERFACING/CONTROL MODULES AND THE FACP. INSTALLED COST OF THIS FIRE ALARM SYSTEM, A BY-PASS
3. PIPE SIZES SHOWN ARE SUBJECT TO CHANGE BASED ON HYDRUALIC CALCULATIONS
WARRANTY AND SERVICE AGREEMENT TO COVER THE AS AUTOMATIC SPRINKLER PERFORMED BY FIRE PROTECTION CONTRACTOR. FINAL PIPING LAY-OUT & SIZE SHALL
INSTALLATION OF THE COMPLETE SYSTEM FOR A
PACP PRE-ACTION CONTROL PANEL PERIOD OF AT LEAST ONE YEAR FOLLOWING FINAL BOB BOTTOM OF BEAM BE DETERMINED BY FIRE PROTECTION CONTRACTOR. C CELSIUS
ALL PANELS AND PERIPHERAL DEVICES SHALL BE THE CA COMPRESSED
B. STANDARD PRODUCT OF A SINGLE MANUFACTURER AND
SYSTEM ACCEPTANCE. BOD BOTTOM OF DECK 4. COORDINATE WORK WITH ALL OTHER TRADES. CO. AIR
SHALL DISPLAY THE MANUFACTURER'S NAME ON EACH CONN CLEANOUT
RCC REMOTE COMMAND CONSOLE BOP BOTTOM OF PIPE 5. ONLY PIPING SERVING SPRINKLERS WITHIN ELECTRICAL ROOMS SHALL BE ROUTED
CW CONNECTION
one and one-half inches = one foot
FREE OF DEFECTS, SCRATCHES, CORROSION AND CODES AND STANDARDS AND OTHER APPLICABLE 6. ROUTE PIPING CONCEALED THROUGHOUT EXCEPT WHERE INDICATED. DCW DOMESTIC COLD
CONTAMINATION. USED EQUIPMENT SHALL NOT BE STANDARDS REFERENCED IN THE PROJECT
ALLOWED. SPECIFICATIONS. FINAL APPEARANCE OF ALL SYSTEMS C CENTERLINE 7. ALL HORIZONTAL PIPING IS ABOVE CEILING UNLESS NOTED OTHERWISE.
DWV WATER
DRAIN, WASTE & VENT
FATC FIRE ALARM TERMINAL CABINET AND EQUIPMENT SHALL BE NEAT AND CLEAN. CAC COMPOUND ACCESS CONTROL FACILITIES
8. WHERE HEADS ARE NOT SHOWN, CONTRACTOR SHALL DETERMINE LOCATION, EL ELEVATIO
CV CHECK VALVE
6
THE FACP PRIMARY POWER SUPPLY SHALL BE CENTER IN CEILING TILES IN LAY-IN CEILING AREAS, ALIGN WITH LIGHTS AND OTHER EX. N
C. PROTECTED BY A SEPARATE UL-LISTED FAST ACTING CEILING ELEMENTS IN HARD CEILING AREAS. COORDINATE EXACT LOCATION WITH EXISTING
NAC NOTIFICATION APPLIANCE EXTENDER PANEL ELECTRICAL TRANSIENT SURGE SUPPRESSOR THAT THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION DDCV DOUBLE DETECTOR CHECK VALVE ASSEMBLY ARCHITECT DURING SHOP DRAWING SUBMITTAL PROCESS.
INCORPORATES LOW Z EARTH GROUNDING. THE DEVICE K. F FIRE LINE
SHALL MEET THE REQUIREMENTS OF U.L. 1449.
OF SYSTEM REQUIREMENTS WITH ALL CONDITIONS OF
THE BUILDING AND SITE INCLUDING, BUT NOT LIMITED TO,
DIP DUCTILE IRON PIPE 9. WHERE NOT SHOWN, PIPING LAYOUT AND SIZE SHALL BE DETERMINED BY FIRE
B B
PWR REMOTE FIRE ALARM POWER SUPPLY ALL LOW VOLTAGE CIRCUITS LEADING FROM THE FACP,
BLIND SPACES, SHELVING, LIGHTS, GRILLES AND DN DROP NIPPLE PROTECTION CONTRACTOR. ALL PIPING TO BE ROUTED CONCEALED, UNLESS
G.CO. GRADE CLEANOUT
D. INCLUDING INITIATING AND NOTIFICATION CIRCUITS, AS
DIFFUSERS, PIPING, DUCT WORK, DOORS, WINDOWS,
(E) EXISTING
OTHERWISE INDICATED.
EQUIPMENT PLATFORMS, WALLS (FIRE-RATED AND
2
KW KILOWATT
0
FULL OPERATIONAL CAPABILITY OF THE FIRE ALARM NOTIFICATION SHALL BE IN WRITING A MINIMUM OF 48 HOURS PRIOR TO
SHUT-DOWN.
PS ALARM CHECK VALVE PRESSURE SWITCH THE FACP SHALL BE DESIGNED FOR FUTURE EXPANSION
SYSTEM, AS WELL AS FULL COMPLIANCE WITH ALL DESIGN FHC FIRE HOSE CABINET LB POUNDS
DOCUMENTS, CODES AND STANDARDS, TO THE
F. FHS FIRE HOSE STATION LF LINEAR FEET
6
BETWEEN THESE SPECIFICATIONS AND THE SPECIFICATION SECTION 28 3100 FOR COMPLETE H HANGER
S DUCT SMOKE DETECTOR REFERENCED STANDARDS AND PUBLICATIONS, THE PERFORMANCE REQUIREMENTS. OS&Y OUTSIDE SCREW AND YOKE
MOST STRINGENT REQUIREMENT SHALL APPLY. HDPE HIGH DENSITY POLYETHYLENE FIRE PROTECTION SYMBOLS
S
HSW HORIZONTAL SIDE WALL PDI PLUMBING DRAINAGE INSTITUTE
SMOKE DETECTOR PENDANT SPRINKLER HEAD PLAN (STAINLESS STEEL)
PDISCH PUMP DISCHARGE
HV HOSE VALVE
0
~
S PLBG PLUMBING
SMOKE DETECTOR, WALL MOUNTED
6
S S BEAM TYPE SMOKE DETECTOR, CEILING MOUNTED GENERAL SYMBOLS IE INVERT ELEVATION
F
F
PRE-ACTION MANUAL PULL STATION
~
~
~
REFRIG REFRIGERATOR
4
~
D F D
MANUAL PULL STATION (N) NEW
SAN SANITARY
NAC NOTIFICATION APPLIANCE CIRCUIT SUPERVISED CONTROL VALVE
~
AIM
1 KEYED NOTE SPEC SPECIFICATIO
ADDRESSABLE INPUT MODULE NIC NOT IN CONTRACT SPK N
SPRINKLER
GATE VALVE
~
REVISION TRIANGLE NO NUMBER
one-half inch = one foot
~
TEMP VALVE
SP-1 EQUIPMENT TAG OBJ OPEN BAR JOIST PIPE CAP TOP TEMPERATURE
~
TP TOP OF PIPE
STROBE, CEILING MOUNTED OD OUTSIDE DIAMETER
0
~
MATCHLINE CURRENT DRAWING
STROBE, WALL MOUNTED SEE FA111 CONTINUATION OF DRAWING MATCHLINE PIV POST INDICATOR VALVE S SPRINKLER LINE (DRY SYSTEM)
~
V VENT
PRI ELEVATOR RECALL, PRIMARY VERT VERTICAL
VTR VENT THROUGH
PRV PRESSURE RELEASE VALVE PIPE DOWN
~
HORN ROOF
~
HORN/STROBE (R) REMOVE WHA WATER HAMMER
1 SCALE: 1/8"=1'-0" DRAWING TITLE (RL) RELOCATE POINT OF CONNECTION NEW TO EXISTING
ARRESTER
~
SPEAKER/STROBE RN RISER NIPPLE
4
1
SHEET DETAIL NUMBER RUN FIRE PUMP RUNNING
C
CEILING MOUNTED HORN/STROBE XXX-1 EQUIPMENT DESIGNATIONS
S SOUNDER BASE FH
FIRE PROTECTION DRY PIPE HEADER RISER
CEILING MOUNTED SPEAKER/STROBE DIRECTION VIEWED SLC SIGNALING LINE CIRCUIT 1
C
ST ELEVATOR, SHUNT TRIP PIPE BREAK CONTINUATION
~
~
1 DRAWING IDENTIFICATION SECTION REFERENCE
FSD
FIRE SMOKE DAMPER FA301 SHEET IDENTIFICATION STS ELEVATOR, SHUNT TRIP SUPERVISION
MULTI-LINE DESIGNATION 1 KEY NOTE
0
CORNELL OR APPROVED. INSTALL AT 43" AFF. 1 DRAWING IDENTIFICATION UTL UTILITY BUILDING PLAN PLAN READ LEFT
DETAIL REFERENCE READ TOP TO BOTTOM TO
4"CW
POINT OF CONNECTION
MS
2-WAY COMMUNICATIONS SYSTEM MASTER STATION, FA401 SHEET IDENTIFICATION VT VALVE TAMPER SWITCH INDICATES FUTURE
PIPING ON THE RACK
RIGHT
2"HW
CORNELL OR APPROVED. INSTALL AT 43" AFF. WHS WAREHOUSE 3/4"HWR EXISTING PIPE TO REMAIN
~
4"CW 4"HA(F) 2"NG
2"HW 2"IA
2-WAY COMMUNICATIONS SYSTEM POWER SUPPLY, WP WEATHERPROOF
8
NG
~
2"DIR INDICATES FUTURE
LIMIT OF PIPE TO
~
BOP 12'-6" PIPING ON THE RACK
BOP 13'-6"
RS 2-WAY COMMUNICATIONS SYSTEM REMOTE STATION, LOWER
UPPER
BE
CORNELL OR APPROVED. INSTALL AT 43" AFF. 1 PIPE RACK REMOVED
one-quarter inch = one foot
2"DIR
ENLARGED PLAN REFERENCE PIPE RACK
NEW PIPING
~
2"DIS
FA401
4
2"IW
F FIRE SPRINKLER BELL HA(F) 2"IA EXISTING PIPING TO NEW F
IA 4"HA(F) PIPING
~
IW BOP 13'-6" CONNECTION
DIS
IW
DIR
IA
HA (F)
S SPEAKER ONLY NG
DIS
DIR
UPPER PIPE RACK INDICATES ROOF AREA IN SQUARE
FEET
~
X,XXX
0
1225 N. LOOP WEST, SUITE 900 1511 WESTPORT ROAD 400 W. CESAR CHAVEZ STREET, SUITE 500
HOUSTON, TX 77008
(713) 864-2900
KANSAS CITY, MO 64111
(405) 842-6100
AUSTIN, TX 78701
(512) 472-6721 FP-001
4
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
0
BID DEDUCT ALTERNATE #3 NOTES: BID DEDUCT ALTERNATE #4 NOTES: GENERAL NOTES
CONVERT SUITE C TO CONDITIONED STORAGE SPACE: CONVERT SUITE D TO CONDITIONED STORAGE SPACE: 1. THIS DRAWING IS ISSUED FOR PERMIT AND IS INTENDED TO DESCRIBE THE GENERAL DESIGN
IN SUITE C 209, BREAK ROOM 205, & COPIER ROOM 213 IN SUITE D 210, BREAK ROOM 206, & COPIER ROOM 214 INTENT BY WHICH THE FIRE ALARM PLANNER CAN CORRECTLY PLAN THE SYSTEM(S). SOME PARTS
OF THE SYSTEM MAY NOT BE DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER TO
1. INSTALL CEILING MOUNTED NOTIFICATION DEVICES TO MATCH NEW FLOOR CONFIGURATION. 1. INSTALL CEILING MOUNTED NOTIFICATION DEVICES TO MATCH NEW FLOOR CONFIGURATION. SPECIFICATION SECTION 28 3111 FOR COMPLETE PERFORMANCE REQUIREMENTS.
2. PROVIDE CEILING MOUNTED NOTIFICATION DEVICE IN AREA WITHOUT DROP CEILING. 2. PROVIDE CEILING MOUNTED NOTIFICATION DEVICE IN AREA WITHOUT DROP CEILING. 2. DUCT SMOKE DETECTORS ARE TO BE INSTALLED IN SUPPLY AND RETURN AIR SYSTEMS WITH A
6
CAPACITY GREATER THAN 2000 CFM, PER IMC AND NFPA 90A. SEE HVAC CONTROLS DRAWING(S)
3. INSTALL SMOKE DETECTOR IN FRONT OF ELEVATOR DOORS TO ACTIVATE ELEVATOR RECALL. 3. INSTALL SMOKE DETECTOR IN FRONT OF ELEVATOR DOORS TO ACTIVATE ELEVATOR RECALL.
three inches = one foot
B B
2
PS S S
C C
1 2 3 4 5 6 1 2 3 4 5 6
three-quarters inch = one foot
A A
0
STAIR #1 F
HAC ENCLAVE HAC STORAGE
6
STAIR #2
FAA
BREAK ROOM FD
BREAK ROOM 15 STAIR #1 STAIR #2
15 15 BREAK ROOM 15 15
ENTRY BREAK ROOM
CORRIDOR
4
C 15 C 15 C 15 C 15
15
D D
ELEV.
EMR
S
STORAGE
S S
ELEV. S ?
one-half inch = one foot
C 15 C 15 C 15 C 15
B B
C 30 C 30 15 15 C 30 C 30 C 30 C 30 15 15 C 30 C 30
RR RR
0
RR RR FD FD
RR RR
FD FD
SUITE B
RR RR SUITE A
CORRIDOR
15 15 15 15
SUITE C SUITE D
1-HR SHAFT
4
CORRIDOR
C 30 C 30 C 30 C 30 C 30 C 30 C 30 C 30
E E
three-eighths inch = one foot
CORRIDOR CORRIDOR
C C 15 C CONF. ROOM
C 15 C 15
CORRIDOR
15
15
CONFERENCE ROOM
0
C 75 C 75 C 75 C 75
C 15 C 15
C 30
FACP
COPIER ROOM COPIER ROOM 15
ELEC. FD
IT CLOSET
COPIER ROOM MECH. COPIER ROOM
IT CLOSET S S S
S S
8
15
15 15 FD
ELEC. FD
D D
one-quarter inch = one foot
4
F F
BID DOCUMENTS
APPROVED: DIRECTOR SHEET TITLE PROJECT TITLE VA PROJECT NUMBER
CONSULTANTS ARCHITECT FIRE ALARM - FLOOR PLAN & RISER NEW ADMINISTRATION BUILDING Office of
16
1225 N. LOOP WEST, SUITE 900 1511 WESTPORT ROAD 400 W. CESAR CHAVEZ STREET, SUITE 500
HOUSTON, TX 77008
(713) 864-2900
KANSAS CITY, MO 64111
(405) 842-6100
AUSTIN, TX 78701
(512) 472-6721 FA-101
4
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
BID DEDUCT ALTERNATE #3 NOTES: BID DEDUCT ALTERNATE #4 NOTES: GENERAL NOTES
0
CONVERT SUITE C TO CONDITIONED STORAGE SPACE: CONVERT SUITE D TO CONDITIONED STORAGE SPACE: 1. ALL AREAS NOT IDENTIFIED WITH OCCUPANCY HAZARD NOTE ARE LIGHT HAZARD OCCUPANCIES.
IN SUITE C 209, BREAK ROOM 205, & COPIER ROOM 213 IN SUITE D 210, BREAK ROOM 206, & COPIER ROOM 214
ZONE 2: HAZARD OCCUPANCY CLASSIFICATIONS SHALL USE THE FOLLOWING DENSITIES:
1. INSTALL SPRINKLER SYSTEM WITH FULL FLOOR COVERAGE TO MATCH NEW FLOOR LIGHT HAZARD: - 0.1 GPM/SQFT OVER 1500 GPM/SQFT
1. INSTALL SPRINKLER SYSTEM WITH FULL FLOOR COVERAGE TO MATCH NEW FLOOR
LEVEL 2 CONFIGURATION AND CEILINGS. CONFIGURATION AND CEILINGS. ORDINARY HAZARD: (GROUP 1) - 0.15 GPM/SQFT OVER 1500 GPM/SQFT
ORDINARY HAZARD: (GROUP 2) - 0.2 GPM/SQFT OVER 1500 GPM/SQFT
WET SYSTEM 2. PROVIDE UPRIGHT SPRINKLERS IN AREAS WITHOUT DROP CEILINGS AND IN UNFINISHED AREAS. 2. PROVIDE UPRIGHT SPRINKLERS IN AREAS WITHOUT DROP CEILINGS AND IN UNFINISHED AREAS.
INSTALL CONCEALED SPRINKLERS IN FINISHED AREAS WITH DROP CEILINGS.
INSTALL CONCEALED SPRINKLERS IN FINISHED AREAS WITH DROP CEILINGS. 2. 100% SPRINKLER PROTECTION PROVIDED WITH WET PIPE SYSTEM.
6
4. FIRE SUPPRESSION PIPING LAYOUT SHOWN IS RECOMMENDED AND MUST BE COORDINATED WITH
ALL OTHER DISCIPLINES IF ALTERED.
A BID DEDUCT ALTERNATE #5 NOTES: BID DEDUCT ALTERNATE #6 NOTES: 5. IF BID DEDUCT ALTERNATE #3, #4, OR #5 IS SELECTED, THE SPACE MUST COMPLY WITH THE VA
FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING CODE, AND APPLICABLE NFPA
A
CODES. PROVIDE ADEQUATE SPRINKLER COVERAGE THROUGHOUT. REFER TO AS-103 FOR FLOOR
PLANS AND AS-201 FOR CEILING PLANS.
ALTERNATE SECOND FLOOR COMMON SPACE:
IN ENCLAVE 200, ELECTRICAL ROOM 215, IT CLOSET 216, 1. PROVIDE SPRINKLER COVERAGE IN AREAS WHERE ELEVATOR AND ASSOCIATED EQUIPMENT IS
CONFERENCE ROOM 217, RESTROOMS 218, 219, 220, 221, REMOVED.
STORAGE 222, AND CORRIDORS 223, 224, 225, 226.
1. INSTALL SPRINKLER SYSTEM WITH FULL FLOOR COVERAGE TO MATCH NEW FLOOR
CONFIGURATION AND CEILINGS.
KEYED NOTES
2. PROVIDE UPRIGHT SPRINKLERS IN AREAS WITHOUT DROP CEILINGS AND IN UNFINISHED AREAS.
INSTALL CONCEALED SPRINKLERS IN FINISHED AREAS WITH DROP CEILINGS. 1. PROVIDE SPRINKLER AT TOP OF HOISTWAY.
one and one-half inches = one foot
CHECK
VALVE
0
4"
ZONE 1:
6
4" LEVEL 1
WET SYSTEM
B B
TWO WAY FDC ALARM
(2 1/2" CONNECTIONS) CHECK VALVE
4" 4" WITH
2
PRESSURE
SWITCH TRIM
BACKFLOW A A
PREVENTER
SUPERVISED
CONTROL
2" DRAIN VALVE
4"
one inch = one foot
0
DRAIN
6
6"
C C
FIRE PROTECTION RISER
DIAGRAM
2
3 SCALE: NONE
three-quarters inch = one foot
1 2 3 4 5 6 1 2 3 4 5 6
ORDINARY HAZARD
GROUP 2
0
A A
6
HAC
HAC ENTRY
STORAGE
STAIR #1 STAIR #2 FD
BREAK ROOM ENCLAVE BREAK ROOM
STAIR #1 STAIR #2
BREAK ROOM BREAK ROOM
ORDINARY HAZARD
CORRIDOR
4
GROUP 2
D CORRIDOR D
ELEV. EMR
ELEV.
1 ?
B B ?
0
RR RR RR RR
FD FD
FD FD
SUITE C SUITE A
RR RR CORRIDOR SUITE D RR RR
SUITE B
4
1-HR SHAFT
E E
three-eighths inch = one foot
CORRIDOR
CORRIDOR CORRIDOR CORRIDOR
C C
CONF. ROOM
0
CONFERENCE ROOM
CORRIDOR
4" UP AND
IT CLOSET COPIER ROOM OVER SERVING
COPIER ROOM ELEC. FIRST FLOOR
FD
COPIER ROOM FD
4" UP AND
one-quarter inch = one foot
D D OVER SERVING
SECOND
4
1225 N. LOOP WEST, SUITE 900 1511 WESTPORT ROAD 400 W. CESAR CHAVEZ STREET, SUITE 500
HOUSTON, TX 77008
(713) 864-2900
KANSAS CITY, MO 64111
(405) 842-6100
AUSTIN, TX 78701
(512) 472-6721 FP-101
4
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
0
0°
INTERIOR
15
SUB FAB
CEILING GRID 7. REFER TO NFPA 24, ANNEX A. 10.8.2 FOR ADDITIONAL DESIGN REQUIREMENTS.
END CAPS PLAN FOR SIZE
LINK SEAL &
(TYP.)
BOLT (TYP.) CONCRETE SPLASH BLOCK
0
MINIMAL THRUST BLOCK BEARING AREA, A(b0 = bxh [SQ FT] REFER TO ARCHITECTURAL
NORMAL PIPE SIZE [IN] TEE & END 90 DEGREE BEND 45 DEGREE BEND
6" 7.5 10.6 5.7
REFER TO
6
B NOTE: B
1. INSTALL WITH ALL APPURTENANCES REQUIRED BY AND IN COMPLIANCE WITH NFPA 13.
2. PIPING IS SHOWN SCHEMATICALLY.
2
C C
BLIND FLANGE
TO ROOF FRAMING STRUCTURE ABOVE
2
NUT
WASHER
SCHEDULE 40
STEEL PIPE SLEEVE
NUT MINIMUM 3/4"
0
TIE RODS
SURGE SUPPRESSOR CLIP L3X3X5/16 X6" WELDED
6
TO OUTSIDE OF SLEEVE
(TWO SIDES)
SWIVEL RING HANGER
PUSH-ON OR
MECHANICAL JOINT REFER TO THRUST
BLOCK DETAIL
4
D NOTES: D
1. RODS, CLAMPS, BOLTS, WASHERS, STRAPS, ETC. SHALL CONFORM TO NFPA 24.
2. MINIMIZE THE LENGTH OF PIPING UNDER STRUCTURE.
3. CAST PIPE SLEEVE INTO STRUCTURE. COORDINATE SLEEVE INSTALLATION WITH
STRUCTURAL ENGINEER.
4. PROVIDE BURIAL DEPTH TO TOP OF PIPE AS PER NFPA 24 OR MINIMUM 36".
SWIVEL RING HANGER WITH 5. SEAL SPACE BETWEEN SLEEVE AND PIPE WATERTIGHT.
one-half inch = one foot
E E
three-eighths inch = one foot
0
8
one-quarter inch = one foot
4
F F
0
BID DOCUMENTS
APPROVED: DIRECTOR SHEET TITLE PROJECT TITLE VA PROJECT NUMBER
CONSULTANTS ARCHITECT FIRE PROTECTION DETAILS NEW ADMINISTRATION BUILDING Office of
16
1225 N. LOOP WEST, SUITE 900 1511 WESTPORT ROAD 400 W. CESAR CHAVEZ STREET, SUITE 500
HOUSTON, TX 77008
(713) 864-2900
KANSAS CITY, MO 64111
(405) 842-6100
AUSTIN, TX 78701
(512) 472-6721 FP-401
4
VA FORM 08-6231
1 2 3 4 5 6 7 8 9