Facility
Maintenance/Management: Making
the best of each tool work - together
CAPEX OPEX
Construction Construction
BEP BEP
Construction
Sub- Sub- Sub- Sub- Sub-
Contractor Contractor Contractor Contractor Contractor
BEP BEP BEP BEP BEP
FAMILY TYPES
1 A1- Sprinkler 68:C Fast Response K=80
2 A2- Sprinkler 68:C Fast Response K=115
3 A3- Sprinkler 74:C Fast Response K=80
4 A4- Sprinkler 93:C Standart Response K=80
5 A5- Sprinkler 93:C Fast Response K=80
6 B1-Sprinkler 68:C Fast Response K=80
7 B2-Sprinkler 74:C Fast Response K=80
8 C-Duvar Tipi Sprinkler 68:C Fast Response K=80
TAV Construction
CAD+BIM+GIS+CMMS for Airport Facility Maintenance/Management – GeoDesign+BIM, Amsterdam, 23 November 2017
BIM Lifecycle Management
• BIM System Execution Plan for FM & • Federated BIM model and • BIM + GIS UI use cases
Lifecycle Management content reviews per requirements
• Operation analytics, reporting and
• Define BIM requirements for FM use • Remedial actions
• Attributes & documents
management dashboard
• Room/Space definitions • Integration platform review and • Integration with other FM systems
• System definitions deployment
• Zone definitions • ERP
• BMS
• Asset and CMMS database • Security
• BIM modeling for existing facilities and content population/integration
infrastructure with BIM • Platform Management & Staff
• As-built based modeling
• Laser scanning training
• Site survey based modeling
• Platform models and database
• Review existing BIM models for FM updating
use & compliance
BIM GIS
A360/AGOL
3D Content 2D Content