You are on page 1of 7

CIVIL MATERIAL TESTING SERVIC

TESTING RATE LIST


Equimpment
S.No Description of Work
Qty
Soil Soil Aggregate Mixture
1 Sieve Analysis of fine / coarse aggregates 1
2 Hydrometer Analysis 1
3 PROCTOR 4
4 C.B.R 1
5 Plastic Index / Atterberg limit 1
6 Consolidation test of soil 1
7 Direct Shear Test 1
8 Chloride content in Soil 1
9 Sulpahte content in Soil 1
10 Unconfined compressive strength of Soil 1
11 Natural Moisture Content 2
12 Specific Gravity 1
13 F.D.T (Sand cone method) 6
14 Moisture Ready Method for (N.M.C) 3
15 Plate Load Test (excluding Cantiledge system, crane & load) 1
Concrete/Cement Tests
1 Settling Time 1
2 Cement Specific Gravity 1
3 Mortar Making and Compression test @ 7 days 1
4 Noramal consistency of cement 1
Aggregate Tests
1 Gradation 1
2 Loss Angles Abrasion 1
3 Clay Lumps 1
4 Specific Gravity 1
5 Flakiness And Elongation 1
6 Soundness by sodium / magnesium 1
7 Fineness Modulus 1
8 Unit Weight Of Aggregate 1
9 Impact Value 1
10 Crushed Value 1
11 Organic impurities of fine aggregate 1
12 Moisture content 1
13 Sand Equivalent 1
14 Alkali Silica reactivity of aggregates by Mortar bar method 1
Concrete Tests
1 Gradation for concrete aggregate 1
Compressive Strength cylinder / cube / block / brick upto 12"
2 1
Length & Height
3 Capping Cylinder/Core 1
4 Slump Test on site/lab 4
5 Temperature on site/lab 1
6 Air content of freshly concrete on site/Lab 1
7 Core Cutting 2
8 Concrete Mix desgine Upto 30 Mpa 2
9 Tensile/ spliting strength of concrete cylinder 1
Steel Tests Mechanical & Chemical test
1 Tensile/Bend,Elongation 1
2 Chemical composition of Steel up to 5 sample 1
Asphalt / Bitumen Tests
1 Bitumen Extraction of Asphalt 1
2 Maximum Specific Gravity of Asphalt (Gmm) 1
3 Bulk Specific Gravity of Asphalt 1
4 Marshall Stability and flow 1
5 Peneteration test on bitumen 1
6 Softing Point of bitumen 1
7 Flash and fire point of bitumen 1
8 Ductility of Bitumen 1
9 Marshall Mix Design Asphalt 1

All above Charges are Exclusive tax and sample collection,Site Mob Demobilization will be C
STING SERVICES
TE LIST Equimpment Equimpment
Cost including Manpower per year Rate (PKR)
tax Utilization
292,622 1 3,000
1 5,000
2 5,000
681,030 6,000
2,500
3,000
304,200 5,000
12,376 6,000
12,376 6,000
5,000
2,000
2,000
4,500 2,500
27,500 5,000
150,000

5,000
3,000
5,000
2,000

3,000
297,825 5,000
5,000
3,000
2,000
5,000
2,000
2,000
3,000
2,500
5,000
3,000
3,000
30,000

3,000
700
22,000 500
1,500
1,500
157,960 5,000
411,477 5,000
35,000
176,326 3,000

31800/-USD 5,000
75000/-USD 5,000

6,000
443,566 3,000
3,000
6,000
88,825 2,500
2,500
2,000
292,500 5,000
271,588 50,000

Site Mob Demobilization will be Charged Additionally


the corrosion rate at the start of corrosion propagation

time since corrosion initiation >=1 year tp

PROBABILITY OF LONGITUDINAL CRACKING AND SPALLING


for a limit crack width of 0.5mm.

the corrosion rate at the start of corrosion propagation I corr uA/cm^2


concrete cover mm
water-cement ratio
A
B
wc/C mm
the time to severe cracking tser year
The term -“first cracking”- used herein is the first visible crack, which was
observed through a magnifying glass t 1st year
For time-variant corrosion rates, the time to cracking and spalling T sp year
1.5

2.015241 2.519051 3.358735 2.356194 2.945242 3.078567


50 40 30 50 40 30
0.45 0.45 0.45 0.5 0.5 0.42
6.5 6.5 6.5 6.5 6.5 6.5
0.57 0.57 0.57 0.57 0.57 0.57
0.009 0.01125 0.015 0.01 0.0125 0.014
4.727898 3.330577 2.120145 3.808048 2.682586 2.405868

1 1 1 1 1 1
6.971209 5.327958 3.904491 5.889464 4.565921 4.2405

You might also like