(2) Field Test

a. standard penetration test (like)

The Standard Penetration Test (SPT) is carried out every 2 meter depth interval during drilling, a
load of 63.50 kg is dropped freely from a height of 75 cm to insert a "spilled barrel sampler".
Penetration is carried out on vertical holes and the number of blows is calculated at every 15 cm
to reach 45 cm. The price of N - SPT is calculated on the second 15 cm and the third insert of the
30 cm "spilled barrel sampler". If the "spilled barrel sampler" penetration is more than 50
punches, while the input has not reached 30 cm, then this SPT can be stopped. Each sample
taken is wrapped in a plastic bag and labeled depth and number of blows. SPT is not done on rock
layers or rocky soil.

b. water passing test (permeability test)

The water passing test is carried out every 5 m depth interval in the borehole by means of a
"water pressure test" or using pressurized water. "Rubber packer" is installed at the depth to be
tested, then pressurized water is pumped into the drill hole, where the water pressure has been
determined. At each pressure carried out observation of discharge for 10 minutes, and each
minute recorded the discharge.

water passing permeability


STAGE LOCATION BOREHOLE NO. SPT
test test

Feasibility
Study (FS)

Design Details
DJ 1 2 14 2
(DD)
Dam axis 2 14

diversion t
unnel

spillway

Additional
Investigation
(2015)

Design
Certification

(3) laboratory testing


Laboratory tests include soil testing from the "borrow area", which is in the form of mechanical
and physical properties of the material, as well as testing for fine aggregates in the form of sand
and coarse aggregates, and these tests include:

STAGE LOCATION NO. ITEM QTY

Feasibility Study
- - - -
(FS)

1 Natural Water Content 14

2 Sieve Analysis 14

3 Specific Gravity 14

Dam Site 4 Density 14

(Soil) 5 Atterberg Limit 14

6 Permeability 14

7 Triaxial Test 14

8 Shringkage 14
Design Details
(DD) 1 Atterberg Limit 9

2 Consolidation Test 7

3 Density 9

Borrow 4 Water Moisture 9

(Soil) 5 Specific Gravity 9

6 Sieve Analysis 9

7 Permeability 7

8 Pin Hole Test 7


9 Shringkage 9

Standard Compaction
10 7
Proctor

11 Triaxial CU Test 9

1 Density 4

2 Water Moisture 4

3 Specific Gravity 6

4 Compressive 3
Quarry
5 Abration 3
(Rock)
6 Shringkage 4

7 Soundness 3

8 Triaxial CU Test 4

9 Absorption 2

1 Sieve Analysis 6

2 Specific Gravity 6

3 Absorption 6

Sand and Gravel 3 Volume Weight 5


Material 4 Abration 3

5 Sand Equivalent 3

6 Silt Content 6

7 Soundness 3

Additional
Investigation - - - -
(2015)

Dam Site
1 Petrography 3
(Rock)
Design
1 Natural Water Content 4
Certification Borrow
2 Specific Gravity 4
(Soil)
3 Density 4
4 Sieve Analysis 4

5 Consistency Test 4

6 Compaction Test 4

7 Permeability 4

8 Triaxial CU Test 4

9 Consolidation Test 4

10 Pin Hole Test 4

1 Petrography 2

2 Specific Gravity 5

3 Absorption 5

Quarry 4 Natural Density 5

(Rock) 5 Soundness 5

6 Abration 5

7 Compressive Strength 5

8 Alcali Reactivity 5