Republic of the Philippines

City of General Santos


OFFICE OF THE BUILDING OFFICIAL

ELECTRICAL PERMIT APPLICATION


CHECKLIST

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

l Legal Documents:
(1 original copy and 2 photocopies)
p If a Representative is applying in behalf of the applicant:

Notarized Authorization letter to Transact with OBO


(with Valid ID of applicant and representative)
p Client
If a Representative is signing in behalf of the applicant:

Notarized Special Power of Attorney (SPA) with Valid


ID of applicant and representative
p Approved Building Permit or Certificate of Occupancy with
Client
complete copy of approved architectural/ building plans

l Technical Documents:

p
Four (4) sets of complete plans, details, and computations, signed
Assigned Professionals
and sealed by duly licensed professionals and signed by owners
p
One-Stop Shop for Construction Permits (OSCP)/ 2nd
Four (4) copies of filled-out Application Form for Electrical Permit
Floor, GSC Investment Action Center, City Hall Compound
p
Three (3) Photocopies of valid PRC ID & current PTR with seal and
3 specimen signatures of the professional by the professionals and Assigned Professionals
signed by the applicant/ owner/s)
p Two (2) sets of Cost Estimate/ Bill of Materials (signed and sealed
by duly licensed professionals and signed by owner/s) Assigned Professionals

p One (1) Pc Long size folder with fastener:


Orange Folder - Accessory Client

Supplemental Documents: if applicable


l
(1 original copy and 2 photocopies)
p
Annual inspection report/ Occupancy inspection report Client

For Distribution/ Transmission Line Applying for Locational Pole Plan at the Subdivision

l Legal Documents:
(1 original copy and 2 photocopies)
p
Development Permit Client
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
p
Lot titles of the road Registry of Deeds (ROD

l Technical Documents:

p
Four (4) sets of complete plans, details, and computations, signed
Assigned Professionals
and sealed by duly licensed professionals and signed by owners

p One-Stop Shop for Construction Permits (OSCP)/ 2nd


Four (4) copies of filled-out Application Form for Electrical Permit
Floor, GSC Investment Action Center, City Hall Compound
p
Three (3) Photocopies of valid PRC ID & current PTR with seal and
3 specimen signatures of the professional by the professionals and Assigned Professionals
signed by the applicant/ owner/s)
p Two (2) sets of Cost Estimate/ Bill of Materials (signed and sealed
by duly licensed professionals and signed by owner/s) Assigned Professionals

p One (1) Pc Long size folder with fastener:


Orange Folder - Accessory Client

Reminder:
ALL NECESSARY DOCUMENTS MUST BE COMPLETE, SIGNED, AND SEALED BY PROFESSIONALS