You are on page 1of 7

MECHANICAL CALCULATION

( PLUMBING)

FOR

DUBAI PHYSIOTHERAPHY

DUBAI, UAE

PROJECT PROPOSAL

MARCH 2021

PREPARED BY :

MACES International
AL-KHOBAR, SAUDI ARABIA

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
TABLE OF CONTENTS
SER.
DESCRIPTION PAGE #
NO.

1.0 RAW WATER SUPPLY PIPE SIZING

2.0 HOT WATER PIPE SIZING

3.0 DRAINAGE AND VENT PIPE SIZING

4.0 ELECTRIC WATER HEATER SIZING

5.0 REFERENCE ATTACHMENTS

A) WATER SUPPLY FIXTURE UNIT TABLE A - 2


B) DRAINAGE FIXTURE UNIT TABLE 7-3
C) DEMAND LOAD CHART A-2/A -3
D) PIPE SIZING CHART A -5
E) MAX. UNIT LOADING FOR DRAINAGE & VENT TABLE 7-5
F) HOT WATER DEMAND PER FIXTURE TABLE-9

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
1.0 COLD WATER SUPPLY PIPE SIZING (TOILET & TEA ROOM)

BUILDING: Physio Theraphy

REFERENCE CODE: UNIFORM PLUMBING CODE 2000 EDITION

DESIGN PARAMETER: VELOCITY @ 6.0 FPS INSIDE PIPE ( AS PER UPC APPENDIX -"A"
PARA.- A 6.1, WHERE MAX. ALLOW. VELOCITY IS 10 fps)

MATERIALS: CPVC SCH. 80 TEMP.= 0 - 71 OC

BASIS FOR SIZING: SYSTEM WITH PREDOMINANTLY FLUSH VALVE

1.01) PIPE SIZING FOR: COLD WATER SUPPLY PIPE MAIN PIPE

MIN.
TYPE OF FIXTURE NO. OF FIXTURES FIXTURE UNITS TOTAL FU
TOTAL FU
CONNECTION
LAVATORY 12 1 1/2" 12

WESTERN WATER CLOSET 6 5 1" 30

PERENNIAL HOSE SPRAY 6 1 1/2" 6

KITCHEN SINK 13 1.5 1/2" 19.5

SHOWER 2 2 1/2" 4

TOTAL 72

FROM CHART A-3 PAGE 171 APPENDIX-A, UNIFORM PLUMBING CODE 2000 EDITION,

DEMAND LOAD = 57 GPM

FROM CHART A-5, PAGE 174 APPENDIX-A, UNIFORM PLUMBING CODE 2000 ED., @ 5 LB/SQ.IN
PER 100 FT OF FRICTION LOSS AND FLOW @ 64 GPM,

PIPE SIZE =1 1/2 " Ф

SELECTED PIPE SIZE = 2 " Ф

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
2.0 HOT WATER PIPE SIZING

BUILDING: Physio Theraphy

REFERENCE CODE: UNIFORM PLUMBING CODE 2000 EDITION

DESIGN PARAMETER: VELOCITY @ 6.0 FPS INSIDE PIPE ( AS PER UPC APPENDIX -"A"
PARA.- A 6.1, WHERE MAX. ALLOW. VELOCITY IS 10 fps)

MATERIALS: CPVC SCH. 80 TEMP.= 0 - 71 OC

2.01) PIPE SIZING FOR: HOT WATER SUPPLY MAIN PIPE

MIN.
TYPE OF FIXTURE NO. OF FIXTURES FIXTURE UNITS TOTAL FU
TOTAL FU
CONNECTION

LAVATORY 12 0.75 1/2" 9

KITCHEN SINK 13 1.125 1/2" 14.625

SHOWER 2 1.5 1/2" 3

TOTAL 27

FROM CHART A-3 PAGE 171 APPENDIX-A, UNIFORM PLUMBING CODE 2000 EDITION,

DEMAND LOAD = 40 GPM

FROM CHART A-5, PAGE 174 APPENDIX-A, UNIFORM PLUMBING CODE 2000 ED., @ 5 LB/SQ.IN
PER 100 FT OF FRICTION LOSS AND FLOW @ 47 GPM,

PIPE SIZE = 1 1/4 " Ф

SELECTED PIPE SIZE = 1 1/2 " Ф

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
3.0 FOR DRAINAGE PIPE SIZING

BUILDING: Physio Theraphy

REFERENCE: UNIFORM PLUMBING CODE 2000 EDITION


MATERIALS: PVC SCH. 40

3.01) PIPE SIZING FOR: SANITARY SEWER/DRAINAGE PIPE

MIN.
TYPE OF FIXTURE NO. OF FIXTURES FIXTURE UNITS TOTAL FU
TOTAL FU
CONNECTION
LAVATORY 12 1 1 1/4" 12

WESTERN WATER CLOSET 6 4 3" 24

KITCHEN SINK 13 2 1-1/2" 26

FLOOR DRAIN 18 2 2" 36

SHOWER 2 2 2" 4

TOTAL 102

AS PER UNIFORM PLUMBING CODE 2000 EDITION, PAGE 62, TABLE 7-5
A 100 mm DIA PIPE CAN TAKE UP TO 216 F.U. @ SLOPE 2% .

USE SANITARY DRAINAGE MAIN @ 4"(100 mm F) PIPE

FOR VENT SIZING:

WC (near Staff Changing Rooms)

TYPE OF FIXTURE NO. OF FIXTURES FIXTURE UNITS TOTAL FU


TOTAL FU
LAVATORY 2 1 2
WESTERN WATER CLOSET 2 4 8
FLOOR DRAIN 4 2 8
SHOWER 2 2 4
TOTAL 22

FOR THE SAME TOTAL FIXTURE UNIT @ 22


AS PER UNIFORM PLUMBING CODE 2000 EDITION, TABLE 7-5, UNDER VENT SECTION
VENT AT 22 TOTAL FIXURE UNITS REQUIRES A COMBINED MAIN VENT SIZE = 1 1/4" F PIPE

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
4.0 ELECTRIC WATER HEATER SIZING

BUILDING: Physio Theraphy

REFERENCES: 2003
- ASHRAE APPL. HANDBOOK CHAPTER 49 SERVICE WATER HEATING
TABLE -9 HOT WATER DEMAND PER FIXTURE FOR BUILDINGS.
-

TYPE OF FIXTURE NO. OF FIXTURES DEMAND FLOW ( GPH ) TOTAL DEMAND

LAVATORY 6 6 36

SHOWER 2 75 150

KITCHEN SINK 13 20 260

TOTAL MAX. DEMAND 446 GPH

DEMAND FACTOR = 0.30


STORAGE FACTOR= 2
PROBABLE MAXIMUM DEMAND = TOTAL MAX. DEMAND X DEMAND FACTOR
PROBABLE MAXIMUM DEMAND = 133.8 GPH
HEATER OR COIL CAPACITY = 133.8 GPH ( RECOVERY RATE REQUIRED )
STORAGE TANK CAPACITY = HEATER CAPACITY X STORAGE FACTOR
= 267.6 GALS.

POWER REQUIREMENT:

KW = RECOVERY RATE X 8.33 X ( TO - TI )


3413

at Incoming Temp. T1 = 65 OF ( 18 OC)


Outgoing Temp. To = 140 OF ( 60OC)

KW = 7.8 x 8.33 ( 140 - 65 )


3413

KW = 24.4921 (STANDARD KW=7.5)

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01
5.0 REFERENCE ATTACHMENTS

CALCULATION SHEET
Project Name: Dubai Physiotheraphy
Project Number: T082
Designed by: Date: Document No. Sheet no.
Raniel Mejia MARCH 2021 T082-PLBCALC-001 01

You might also like