MANAGEMENT SYSTEM FORMS

VESSEL : TETRA III TYPE : ANCHOR WINCH YEAR : 2015

PMS OC
CODE ITEMS INTERVAL JAN FEB MAR APR MAY JUN JUL AUG SEP T NOV DEC
Operating Pressure &
Temperature Of
W 001 Hydraulic fluid - Check ok ok ok ok ok ok ok ok ok
W 002 Grease Wire Daily ok ok ok ok ok ok ok ok ok
07 14 08 15 07 15 07 14 05 15 07 14 08 15 08 15 08 14
W 003 Check Brake Condition Weekly 21 28 23 29 21 29 23 30 26 30 21 28 22 28 22 28 28
Check And Grease 07 14 08 15 08 13 08 14 06 15 08 14 08 15 08 15 08 14
W 004 Nipple Weekly 21 28 18 28 21 24 21 30 21 28 21 28 23 28 2128 29
Check Foundation bolt
W 005 and nut 2 Weekly 07 27 08 27 09 21 07 22 06 22 08 21 08 22 08 22 08 22
Test emergency
W 006 towing hook 2 Weekly 07 31 08 22 07 21 07 22 06 22 07 21 08 22 08 22 07 23
Clean the equipment
W 007 and check for leakages 1 Month 07 18 07 07 06 07 08 08 07
W 008 Check brake Linings 1 Month 07 08 07 07 06 07 08 08 07
W 009 Greasing point-Grease 1 Month 07 08 07 07 06 07 08 08 07
W 010 First oil change 3 Months 07 \ \ 07 \ \ 08 \ \
Subsequent oil
W 011 changes 6 Months 07 \ \ \ \ \ 08 \ \
W 012 Filter - Clean / Renew 6 Months 07 \ \ \ \ \ 08 \ \
Maintenance Plan For Anchor Windlass

Vessel’s Chief Engr. Port Engineer


Name : Name :
Sign : Sign :