Therefore, to reduce the height of water level observed above zero staff to chart
datum, a correction of 0.030m is applied.
Table 1: Height of water level above zero staff and chart datum
Height of water level (metres)
No Time
Above Zero Staff Above chart datum
1 0855 1.200 1.230
2 0900 1.120 1.150
3 0905 0.980 1.010
4 0910 0.820 0.850
5 0915 0.680 0.710
6 0920 0.520 0.550
By using the formula stated above, charted depth for each 5 minutes interval is
calculated and tabulated in table2.
Table 2: Depth below chart datum
12m
10m
9:00
FIX1
9:01
FIX2
9:02
FIX3
9:03
FIX4
9:04
FIX5
Charted Depth
9:05
FIX6
9:06
FIX7
9:07
FIX8
9:08
FIX9
9:09
FIX10
9:010
FIX11
9:011
FIX12
SOUNDING REDUCTION
9:012
FIX14
9:13
FIX14
9:14
FIX15
9:15
FIX16
9:16
FIX17
9:17
FIX18
9:18
FIX19
9:19
FIX20
9:20
FIX21