TOE POINT CROSS POINT

Sr. No. Ele & Dis Calculation Sr. No. Ele & Dis Calculation

1 14.837 H = -0.004 1 640.270 J =


5.850 P = -0.008 0.000 K =
2 10.621 Q = 2810.000 2 640.182 X =
15.000 4.450 Y =
3 10.602 3 640.680
20.000 3.220
4 638.790
Slope = -2.000 Elevation = 10.624 4.000
Distance = 14.277 Elevation =
NOTE : NSL Distance =
Fill Sec. Slope is - VE Cut Sec. Slope is + VE 3
PGL 1 2
4
POINT
Calculation

-0.020
-2.423
3.417
640.202

640.202
3.417
INTERSECTION POINT BETWEEN CUT & FILL X-Sec.
Sr. No. Elevation

1 135.000 PGL Fill Sec.


2 132.150 NSL
3 140.000 NSL Cut Sec.
4 138.450 PGL

Length Between X-Sec. To X-sec. 20.000

First X-sec. Rd. = 250.000

Inter Point, RD 262.955


PGL IN VERTICAL CURVE (LHS) PGL IN VERTICAL CURVE (R
Tangent = 75 Y = -4.019 Tangent =
Next Grade = -9.154 X = 25.000 Next Grade =
Back Grade = 12.28 M = -0.447 Back Grade =
Required Ch. = 00+100 Dis = 50.000 Required Ch. =
Pvc. Ch. = 00+075 L1 = 5011.860 Pvt. Ch. =
Pvi. Ch. = 00+150 A1 = 5011.413 Pvi. Ch. =
Pvi Ele. = 5018.000 Pvi Ele. =

Req. Elevation = 5011.413 Req. Elevation =

Mid Ordinate = -4.019

I.P Elevation = 5013.981

Normal Grade Normal PGL


Rd. 1 = 03+796 IP RD. = 05+725
Elevation 1 = 4781.500 Grade = -6.500
Rd. 2 = 04+053 IP Elevation = 4572.500
Elevation 2 = 4752 Required Rd. = 05+825
Distance = 257.000 Distance = 100
Grade = -11.479 P.G.L = 4566.000
L IN VERTICAL CURVE (RHS)
75 Y = -4.019
-9.154 X = 50.000
12.28 M = -1.786
00+175 Dis = 25.000
00+225 L1 = 5015.712
00+150 A1 = 5013.925
5018

5013.925
AREA OF CROSS SECTION
Sr. No. Elevation Distance
Calculation
1 130.885 0.000
###
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
###
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
###
8 130.508 0.000
9 130.508 -1.300
###
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
5.289 Area of X-Sec.
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300 5.289 Area of X-Sec.
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22 5.289 Area of X-Sec.
23
24
25
26
27
28
29
30
31
32
MATERIAL CALCULATION IN Cft MATERIAL CALCULATION IN
Tangent = -0.776 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 1.5 Ratio = 2

Ratio = 3 = 3 Ratio = 3

Total Qty of Concrete = 1.000 Total Qty of Concrete

Cement Bags / Cft = 0.224 Cement Bags / CM

Sand / Cft = 0.420 Sand / CM

Aggregate / Cft = 0.840 Aggregate / CM

Cement used in Qty. = 0.224 Bags Cement Bags used in Qty.

Sand used in Qty. = 0.420 Cft Sand used in Qty.

Aggregate used in Qty. = 0.840 Cft Aggregate used in Qty.


IAL CALCULATION IN CM

= 1

= 2

= 4

= 1.000

= 6.216

= 15.541

= 31.082

= 6.216 Bags

= 15.541 CM

= 31.082 CM
BRICK MASONRY IN Cft BRICK MASONRY IN CM
Tangent = -0.952 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 4 Ratio = 2

Total Qty of CFT = 1.000 Total Qty of CFT

Cement Bags / Cft = 0.048 Cement Bags / CM

Sand / Cft = 0.240 Sand / CM

Cement used in Qty. = 0.048 Bags Cement Bags used in Qty.

Sand used in Qty. = 0.240 Cft Sand used in Qty.

Bricks used in Qty. = 13.500 N0# Bricks used in Qty.


ICK MASONRY IN CM

= 1

= 4

= 1.000

= 1.695

= 8.477

= 1.695 Bags 2181

= 8.477 CM

= 500 N0#
CEMENT PLASTER 1/2" THICK IN Sft
Ratio = 1 = 1
Ratio = 2 = 3
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.013
Sand / Sft = 0.047

Cement used in Qty. = 0.01 Bags

Sand used in Qty. = 0.05 Cft

CEMENT PLASTER 3/4" THICK IN Sft


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.015
Sand / Sft = 0.075

Cement used in Qty. = 0.02 Bags

Sand used in Qty. = 0.08 Cft

CEMENT PLASTER 3/8" THICK IN Sft


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.010
Sand / Sft = 0.048

Cement used in Qty. = 0.01 Bags

Sand used in Qty. = 0.05 Cft


CEMENT PLASTER 1/2" THICK IN SM
Ratio = 1 = 1
Ratio = 2 = 2
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.269
Sand / SM = 0.673

Cement Bags used in Qty. = 0.27 Bags

Sand used in Qty. = 0.67 CM

CEMENT PLASTER 3/4" THICK IN SM


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.161
Sand / SM = 0.807

Cement Bags used in Qty. = 0.16 Bags

Sand used in Qty. = 0.81 CM

CEMENT PLASTER 3/8" THICK IN SM


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.161
Sand / SM = 0.807

Cement Bags used in Qty. = 0.16 Bags

Sand used in Qty. = 0.81 CM


STONE MASONRY IN Cft STONE MASONRY IN CM
Tangent = -84723.91 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 3 Ratio = 2

Total Qty of Concrete = 84724.000 Total Qty of Concrete

Cement Bags / Cft = 0.090 Cement Bags / CM

Sand / Cft = 0.338 Sand / CM

Cement used in Qty. = 7625.16 Bags Cement Bags used in Qty.

Sand used in Qty. = 28594.35 Cft Sand used in Qty.


ONE MASONRY IN CM

= 1

= 3

= 2398.754

= 3.179

= 11.921

= 7625.16 Bags

= 28594.35 CM
EASTING - NORTHING BEARING -
Instrument At = BM-1 Instrument At =
Easting = 68585.709 Easting =
Northing = 41545.956 Northing =
Distance = 543.480 RO =
Bearing = 317.004 Easting =
Northing =
RO = BM-2
Next point Easting ( E ) = Sin Bearing x Distance + Easting = 68215.084 Diffrence of Easting =
Next point Northing ( N ) = Cos Bearing x Distance + Northing = 41943.458 Diffrence of Northing =

Distance =
Baering =

360, 0
E = - ve E = + ve
N = + ve N = + ve
270
E = - ve E = + ve
N = - ve N = - ve
180
BEARING - DISTANCE
BM-1
68585.709
41545.956
BM-2
68215.084
41943.458

-370.625
397.502

SQR (Diff of Easting ^2 + Diff of Northing ^2) = 543.480


Tan x (Diff of Easting / Diff of Northing) =
-1
-42.996

0 - 90 = 2.004
90 - 180 = 137.004
180 - 270 = 137.004
90 270 - 360 = 317.004