Quantity (FPS) Quantity
(MKS)
Sr Description No Length Breadth Height
Addition
Providing and Laying of cement concrete
1 1:4:8 using crushed or broken stone graded
as per specified
Omission
Rate Amount
A -
B
Quantity
(FPS)
Sr Description No Length Breadth Height
Total ( A + B )
ANNEX - B
Quantity
(MKS)
Rate Amount
5,685.00
16,152.28
Quantity Quantity
(FPS) (MKS)
Sr Description No Length Breadth Height
Total ( A+ B)
ANNEX - C
Rate Amount
Quantity
(FPS)
Sr Description No Length Breadth Height
Excavation of Panoramic Lift in
1 1.00 18.67 9.58 1.50 268.29
ordinary soil upto 1.5mtr
Excavation of Panoramic Lift in 1.00 18.67 9.58 1.50 268.29
ordinary soil 1.5mtr to 3mtr
Excavation of Panoramic Lift in
1.00 18.67 9.58 1.50 268.29
ordinary soil 3mtr to 4.5mtr
Excavation of Panoramic Lift in
ordinary soil 4.5mtr to 5.33mtr 1.00 18.67 9.58 0.83 148.45
A 953.32
Total ( A+B+C)
ANNEX - D
Quantity
(MKS)
Rate Amount
26.99
1.26
61.62
Quantity Quantity
(FPS) (MKS)
Sr Description No Length Breadth Height
Total ( A)
ANNEX - E
Rate Amount
Quantity Quantity
(FPS) (MKS)
Sr Description No Length Breadth Height
Addition
A 1.00
Omission
B 1.00
Rate Amount
Quantity
(FPS)
Sr Description No Length Breadth Height
providing and Laying granular
material filling under foundation,
brought from outside source free
from organic & other undesirable
matters including watering,
Ramming, Compacting in 6inches
layersat optimum Moisture content
to achieve 95% as per AASHTO
1 complete in all respects as per
drawings and specifications
2 Sand Backfilling
Grid N/ Line 1 to 2 1.00 20.00 5.00 11.75 1,175.00
Grid N/ Line 2 to 10 1.00 124.75 4.50 19.50 10,946.81
Grid A to N/ Line 1 1.00 234.50 6.00 12.00 16,884.00
Grid A/ Line 1 to 8 1.00 121.75 4.50 14.50 7,944.19
Grid G to N/ Line 10 1.00 142.75 4.00 12.50 7,137.50
B 44,087.50
Total (A+B)
ANNEX - G
Quantity
(MKS)
Rate Amount
414.23
1,248.23
Quantity (FPS)
Sr Description No Length Breadth Height
Addition
Providing and Laying of RCC
1:2:4 using crushed or broken
1 stone graded as per New
Drawing
A 180,134.47
Omission
Providing and Laying of RCC
1:2:4 using crushed or broken
2 stone graded as per Old
Drawing
Quantity
(MKS)
Rate Amount
5,100.07
Quantity Quantity
(FPS) (MKS)
Sr Description No Length Breadth Height
Addition
1 Stone Masonry
Line 1/ Grid A 1 4 3 14.5 174 4.926387
Line 8/ Grid A 1 4 3 10.5 126 3.567384
Line 8/Grid A 1 14 3 4 168 4.756512
A 13.25028