Project Spreadsheets to Eurocode 2 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap F13 Rod 16-Jan-23 294
Triple Pilecap
PILECAP DESIGN to EN 1992-1: 2004 (without UK NA) Checked Revision Job No
Originated from TCC82.xls v 3.0 on CD © 2003-2006 TCC - - FB625

Cap load = 29.2 kN Group centre @ 751 m from pile 1

PILE REACTIONS kN
PILE 1 PILE 2 PILE 3 OVERTURNING MOMENTS - kNm characteristic
Gk + Qk 141.0 169.4 192.5 . DEAD IMPOSED WIND
Gk + Qk +Wk 139.9 173.4 199.6 Mx 10.0 5.0 2.0
1.35Gk + 1.5Qk 194.9 234.7 267.0 My 20.0 10.0 5.0
1.0Gk + 1.5Wk 108.8 135.4 155.4 .
1.35Gk + 1.5Qk + 0.75Wk 193.8 238.7 274.1 .

BENDING MOMENTS - kNm


1.35Gk + 1.5Qk 1.0Gk + 1.5Wk 1.35Gk + 1.5Qk + 0.75Wk
My v of col 117.1 65.4 116.4
My ^ of col 113.1 65.5 115.6 (including tolerance)
Mx 173.6 101.0 178.2

E-W STEEL N-S STEEL


M= 178.2 Ø16 M= 117.1 Ø16 K' = 0.2067
b= 1050 b= 1798 min As = 0.167%
d= 309.0 d= 293.0
K= 0.0508 K= 0.0217
z= 293.6 z= 278.4
As = 1396 As = 967
Provide 1396 Provide 967
No = 7 No = 5
As prov = 1407 As prov = 1005
σs = 307 σs = 298
Max S = 165.6 Max S = 177.1
Min S = 41.0 Min S = 41.0
S= 94.7 7H16 B S= 142.0 5H16 B

SHEAR Crit section is 135.0 from pile centres


PILES 2 & 3 Ø8 links
VEd = 274.1 b= 1050 ρl = 0.434% cotθ = 2.50
av = 515.0 vEd = 0.8448 vRd 2d/av = 0.6434 vRd,max = 4.152
Asw/S = 0.9939 No of legs = 4 Spacing = 200 4 LegsH8 @ 200 LINKS
PILE 1 Ø8 links
VEd = 194.9 b= 1260 ρl = 0.272% cotθ = 2.50
av = 615.7 vEd = 0.5280 vRd 2d/av = 0.5110 vRd,max = 4.152
Asw/S = 1.1926 No of legs = 4 Spacing = 150 4 LegsH8 @ 150 LINKS

PUNCHING At column Face At 465.7 from column face (1.55d perimeter)


VEd = 664.7 u1 = 4126 β = 1.112
vEd = 1.840 d ave = 301.0 vEd = 0.5353
vRd,max = 4.152 ok ρl = 0.231% vRd 2d/av = 0.6546 ok