You are on page 1of 25

CONSTRUCTION OF UPPER ELAHERA CANAL

FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS

CONTRACT NO. MWSIP/MMDE/ADB/UEP/ICB-2A/P47381-005-SRI/ICB/2017/006

CONTRACT PACKAGE UECP-ICB-2A

EMPLOYER :
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
MINISTRY OF IRRIGATION
MAHAWELI WATER SECURITY INVESTMENT PROGRAM
(MMDE)

ENGINEER : PROGRAM MANAGMENT DESIGN & SUPERVISION CONSULTANT


(PMDSC)

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING CORPORATION.LTD


(CSCEC)

GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED BRIDGE


CONSTRUCTION OVER ELAHERA CANAL AT KONDURUWEWA
DOCUMENT CONTROL NUMBER : ICB2A-CSC-SAR-CS-BLB-00
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD.
CONSTRUCTION OF UPPER ELAHERA CANAL FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS

00 20-04-2021

Checked by Approved by
Revision # Date prepared by
Design Manager Chief Engineer

ICB2A-CSC-SAR-CS-BLB-GEO-00 1 of 1 Page

You might also like