Used of Soil

Road No: Qty (Cube)


Received 2978.5
213 0.0
214 1255.0
219 0.0
262 826.0
263 0.0
Total Used 2081.0
Balance 897.5
213

Date Location Description Qty(Cube) MIN No

Total 0.0
214

Date Location Description Qty(Cube) MIN No

03.08.2020 0+000-0+300 BS Pocket Filling 1.5 2401


13.08.2020 0+000-0+500 LHS Pocket Filling 6.0 2402
0+050-0+120 Sub Base Filling 38.5
14.08.2020 2403
0+340+0+370 Pocket Filling 9.0
0+110-0+400 Sub Base Filling
15.08.2020 105.0 2404
0+460-0+530 Sub Base Filling
16.08.2020 0+530-0+870 Sub Base Filling 91.0 2405
17.08.2020 0+870-0+980 Sub Base Filling 31.5 2406
0+460-0+560 Sub Base Filling 60.0
19.08.2020 0+460-0+600 LHS Embankment Filling 2407
10.0
0+550-0+700 LHS Embankment Filling
0+000-0+050 BS Sub Base Filling
20.08.2020 38.5 2408
0+100-0+460 BS Sub Base Filling
21.08.2020 0+500-0+550 Sub Base Filling 7.0 2409
23.08.2020 1+390-1+555 Sub Base Filling 40.0 2410
26.08.2020 0+500-0+850 Sub Base Filling 24.5 2411
27.08.2020 0+500-0+850 Sub Base Filling 35.0 2412
28.08.2020 0+000-0+200 Shoulder work 14.0 2413
30.08.2020 0+175-0+250 BS Shoulder work 3.5 2415
31.08.2020 0+250-0+420 BS Shoulder work 14.0 2418
01.09.2020 0+460-0+500 LHS Shoulder work 3.5 2420
1+150-1+380 Sub Base Filling 86.0
02.09.2020 2421
1+330 & 1+350 Pocket Filling 1.5
03.09.2020 1+560-1+800 Sub Base Filling 94.5 2422
0+600-0+780 Shoulder work 10.5
04.09.2020 2423
1+800-2+090 Sub Base Filling 108.5
05.09.2020 2+090-20+250 Sub Base Filling 73.5 2424
1+380-1+560 Embankment Filling 14.0
08.09.2020 2427
1+660-1+780 Shoulder work 7.0
09.09.2020 0+450/0+990/1+103 Culvert By road prepa: 15.5 2429
11.09.2020 1+000-1+150 Sub base filling 52.5 2430
13.09.2020 1+390-1+560 Sub base filling 91.0 2433
0+270-0+530 BS Sub base filling 3.5
14.09.2020 2435
2+170-2+250 BS Shoulder work 10.5
0450 & 0+990 Culvert backfilling 7.0
15.09.2020 2436
2+090-2+170 Shoulder work 3.5
16.09.2020 1+960-2+250 BS Shoulder work 21.0 2437
0+990 & 0+456 Culvert backfilling 3.5
17.09.2020 0+800-1+100 Sub Base Filling 7.0 2438
1+800-1+950 BS Shoulder work 17.5
1+100-1+570 BS Sub base filling 17.5
18.09.2020 2440
18.09.2020 2440
1+790-1+810 BS Shoulder work 7.0
19.08.2020 0+430-0+480 Sub base filling 17.5 2442
20.08.2020 1+650-1+790 Shoulder work 10.5 2445
21.09.2020 0+420-0+470 Sub base filling 3.5 2447
22.09.2020 0+430-0+460 Shoulder work 3.5 2448
23.09.2020 0+420-0+485 Shoulder work 3.5 2452
1+200-1+300 Sub base filling 17.5
04.10.2020 2467
1+000-1+300 Sub base filling 14.0

Total 1255.0
219

Date Location Description Qty(Cube) MIN No

Total 0.0
262

Date Location Description Qty(Cube) MIN No

11.09.2020 0+070-0+270 Sub base filling 84.0 2431


12.09.2020 0+270-0+530 Sub base filling 101.5 2432
19.09.2020 0+530-0+600 BS Sub base filling 21.0 2443
22.09.2020 0+600-0+730 Sub base filling 45.5 2449
23.09.2020 0+730-1+020 Sub base filling 105.0 2450
24.09.2020 1+020-1+220 Sub base filling 77.0 2454
25.09.2020 1+220-1+420 Sub base filling 66.5 2455
26.09.2020 1+400-1+620 Sub base filling 84.0 2457
27.09.2020 1+610-1+740 Sub base filling 49.0 2459
28.09.2020 1+200-1+330 Sub base filling 105.0 2462
29.09.2020 2+020-2+130 Sub base filling 42.0 2461
05.10.2020 2+120-2+250 Sub base filling 45.5 2468

Total 826.0
263

Date Location Description Qty(Cube) MIN No

Total 0.0