Professional Documents
Culture Documents
Safe Work Procedure Waste Baler 2
Safe Work Procedure Waste Baler 2
C - 22 April 2021
Mr. Ahmad Syouqi Mr. Lim Kok Siong Mr. Ahmad Syouqi
ISHE Dept General Manager ISHE Dept R-1
Safe work procedures must be followed when performing maintenance, housekeeping and
repair works on electrical equipment.
The Lock-Out Tag-Out (LOTO) system must be implemented. The system should cover
the following actions minimally: