Professional Documents
Culture Documents
residence
Proposed
residence
31
78'-5"
Proposed
38'
residence
strickler
12
3
12
6
12 1'-6"
6
9'-1"
1'-4"
bottom of lowest beam bfl 19'5"
9'-1"
existing bfl 11'
70x20
10'-2"
7'
3 ply 1 3 7
4" x 11 8"
6x6 pt #2 syp posts
down roof trusses 12
3
10'
10'
3'
hanger
beam pocket beam pocket
12
22'-2" 15'-10" 6
30x60 30x60
30x68
90x68 30x60 60x68
28x68
15'-2" +-
30x60 30x60
11'-9"
9'-1"
flat
20'-6"
1'-4"
1'-4"
this is very important
2x8 balloon framed
box ceiling
12" beam
13'11" bfe verify
28'-6"
28'-10"
16" floor truss
9'-1"
9'-1"
2' 3'-2" 7' 5'-10" 4' 6' 12" piling
8'-4"
74'-5"
11'-10" 4'
78'-5"
28x68
2'-10"
30x60
egress 5.7 ft2
64'-5"
6'-4"
3'-2"
20x68 20x30
10'-4"
12'-4"
28x68
2'-4"
26x68
4'
28x68
20x68
20x30
3'-4"
26x68
12'-9"
8'-4"
8 8
2 x6
20x30
8'-8"
24x68 28x68
5'-4"
2 x68
8
40x68
2'-11" 3'-4" 2' 3'-9" 3'-10"
3'-4"
2'-4"
2'-4"
16x68 50x68
0 8
40x68 28x68
2 x6
16'-11"
14'-10"
14'-11"
13'-7"
12'-7"
30x60
30x60
0 0 0 0
3 x6 3 x6
egress 5.7 ft2 egress 5.7 ft2
50x68
15'-10" 6'-4" 15'-10"
beam pocket
4'
beam pocket 3 7
3 ply 1 4" x 11 8"
6x6 pt #2 syp posts
flat
38' 38'
12'-11" 12'-2" 12'-11" 4'-6" 11'-8" 21'-10"
6"
t.p. 2x12 #2 syp @ 16" oc
4'-8"
down
2x12 #2 syp pt ledger
attached w/ (2) 5 8" thru
10'
10'
bolts @ 24" oc simpson
patio
simpson lus210 lus210 each joist
4'-10"
each joist
13'-2"
3 ply 1 3 7
4" x 11 8" lvl beam
3 ply 1 3 7
4" x 11 8" lvl beam
parking parking
12'-8"
16" engineered floor
trusses @ 16" oc
80x70
74'-5"
78'-5"
64'-5"
64'-5"
12'-8"
3 ply 1 3 7
4" x 11 8" lvl beam
4'-6"
8' 4'
parking storage parking
30x68
12'-8"
22'-4"
3 ply 1 3 7
12'-4" 13'-4" 12'-4" 4" x 11 8" lvl beam
16" engineered floor
trusses @ 16" oc
13'-3"
12'-8"
8'
4'
4'