Professional Documents
Culture Documents
====================================================================================
====================================================================================
====================================================================================
====================================================================================
• Optimize both 2G and 3G network for IRAT, 2G-3G Cell Reselection strategy
and Capacity Monitoring.
• Preparing Monthly report for Ericsson to be submitted to customer for
evaluataion for KPI achievements.
• Preparing all SOP for parameter changes, Drive Test report and also
template for regular reporting as standard reporting to Telkomsel SQA
• Coordination Supervised and monitor all optimization activities done by
engineer by following procedure and standard required by Telkomsel
• Coordination Support and co-ordinating for any major events such as MTQ,
POSTEL DTand VIP Complain such as preparing Drive Test team for standby,
performance report for every event, feature trial before and after for
evaluation.
• Support Internal Ericsson Solution department for any new
product/features trial.
• Perform drive test analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).
====================================================================================
• Coordination Support and co-ordinating for any major events such as Java
Jazz Festival, Jakarta Fest, Indonesia International Motorshow. And all
Marketing events and request from customer such as preparing Drive Test
team for standby, performance report for every event, feature trial before
and after for evaluation.
• Support and co-ordinating for any major events such as Java Jazz Festival,
Jakarta Fest, Indonesia International Motorshow. And all Marketing events
and request from customer such as preparing Drive Test team for standby,
performance report for every event, feature trial before and after for
evaluation.
• Monitor and 5eighbo voice and data capacity such as TCH/ SDCCH
utilization, GPRS/EDGE performance, GSL/RPP utilization and proposed for
upgrade if necessary. Special Documents ie Network Augmentation Order
(NAO) to be released for any DRU, RPP board or Transmission link upgrade.
• Co-ordinating with other related department such as Transmission
Planning, RF Planning, Back Office, NOC and Field Maintenance for further
action related to any major issues.
• Support Internal Ericsson Solution department for any new
product/features trial.
• Performed daily optimisation on 6eighbor area for AXIS network in
Jabodetabek which consist of BSCKU01 , BSCKU02.
• Perform drive test analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).
====================================================================================
====================================================================================
• Consultant for NSN NPI Services, Excelcom 2G Project. Take responsible for
Madura Cluster, East Region.
• Perform statistic analysis based on baseline KPI agreement.
• Perform BSS parameter changes including implementation to achieve the
KPI target.
• Perform drivetest analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).
• Perform inconsistency check BSS parameter including clean up any
inconsistencies.
• Perform neighbour audit using NCS (RNO 8eighbor)
====================================================================================
• Submitting drive test request to the drive tester team for particular
• problem cells which is indicated by statistic data.
• • Optimising Indoor (IBS) cellsite.
• • VIP complain optimisation.
====================================================================================
====================================================================================
====================================================================================
====================================================================================
====================================================================================
• RF optimisation team for Izmir city, Izmir Turkiye Responsible for Turkcell’s
pilot project (GSM 900)
• Performing drive test for various requirement such as new site verification
(site acceptance test), validation of BSS parameter changes, benchmarking,
and trouble shooting based on trouble ticket
• Performing post processing and analysis of drive test result for all
requirements. And propose some network changes in order to
• enhance the network performance and proposed some antenna
configuration (antenna downtilt, antenna direction)
• Analyse the statistic counter (Call setup success rate, TCH drop call rate,
SDCCH drop rate and handover successful rate )
• Proposed some parameter changes (Ericsson R6) to enhance the network
performance and proposed some antenna configuration (antenna downtilt,
antenna direction)
• Preparing and submitting New Site Drive test Report to the customer.
• Task Involved Preliminary RF Survey, Technical survey to determine
coverage objective, best candidate, antenna configuraton, site
configuration.
====================================================================================
====================================================================================