You are on page 1of 15

WELLY LUKMANULHAKIM

MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA


E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

Personal Information Marital status : Married


Citizenship : Indonesia
Born in : Bogor Indonesia
Birth date : October 5th, 1969
Based in : Indonesia

Summary of Diploma in Electronic, Polytechnic , University of Indonesia.


qualifications

Professional February 2019 - Present , PT Camduk Indah Cemerlang Consulting , Indonesia


experience
Project Manager for SAP Enhancement & Business Integration project for
PT. Mitsubishi Chemical Indonesia
• SAP Enhancement project preparation.
• UNCAL ESB Bussiness Integration preparation.
• Meeting with customer, gathering customer requirement.
• Design mockup.
• Preparing Proposal and Project Timeline for new system development.
• Conduct SIT and UAT with customer.
• Internal System Integration to ensure all function working properly.
• Coordination with other IT vendors.

February 2018 – August 2018, Ericsson Indonesia, PT SINERGI AITICON


2G(Sr) 4G RF Optmisation Engineer, Swap Overlay LTE and 2G Network Kaltara
Region, Telkomsel Kalimantan in PT Ericsson
• Site owner for new overlay Swap site 2G,3G, 4G Telkomsel Kaltara, Ericsson
Network.
• Perform parameter validation for new overlay LTE, and 2G sites
• Involved temporary for Blue Ocean Project to improve 2G Voice and
Payload traffic.
• Perform Physical optimization to improve data payload or to improve
overshooting coverage.
• Perform QC report of LTE , 2G ,for acceptant test purpose.
• Updating QC tracker activity
• Perform parameter optimization for Payload improvement.
• IFHO improvement for new LTE Overlay sites.
• Perform Worst Performing Cell Report for LTE Payload (Data Traffic) as per
each mini cluster.
• Monitoring cell availability daily and submitting HCR submission to back
office for any related the hardware alarm and availability issue,
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Coordinating wit DT Coordinator for any case related to Drivetest and


Physical Optimization.

October 2016 – August 2017 , Ericsson Indonesia , PT LEXCORP


2G 3G Team Leader , Modernization Improvement Project, Kaltara Region,
Telkomsel Kalimantan.
• Join with MIP Telkomsel Kalimantan as 2G 3G Team Leader , Modernization
Improvement Project, Kaltara Region, Telkomsel Kalimantan
• Daily monitoring KPI performance for 2G 3G network Kaltara Region
(Tanjung Selor, Tanjung Redep, Malinau , Nunukan, Tarakan).
• Monitoring HCR submission for any related the hardware alarm to avoid
missing HCR.
• Monitoring, controlling and actuating optimization workflow of team
member.
• Distributing additional task to the team member such as VIP Complain,
Sudden Request from SQA and EID.
• Re-Checking report from team member for the weekly report.
• Support DT Coordinator which is related to the Drivetest team and rigger
team.

January 2016 – October 2016 , Ericsson Indonesia , PT LEXCORP


2G Senior RF Optimisation Engineer, Modernization Improvement Project,
Telkomsel Kalimantan
• Join with MIP Telkomsel Kalimantan as Senior 2G RF.Optimisation Engineer
Balikpapan and Kaltara.
• Daily monitoring KPI performance for 2G network Balikpapan and Kaltara
(Tanjung Selor, Tanjung Redep, Malinau , Nunukan, Tarakan)
• Perform analysis of Worst Performing Cells (WPC) KPI Retainability ,
Accessibility, Mobility , VoiceTraffic and Data Tarffic. Including rectification
such as parameter change, Hardware alarm escalation, Physical Changes.
• Perform weekly meeting with SQA , video conference.

September 2015 – January 2016 , Ericsson Indonesia , PT LEXCORP


2G Senior RF Optimisation Engineer, Swap Project Telkomsel Kalimantan.
• Join with Swap Project Telkomsel as Senior 2G RF.Optimization Engineer
Balikpapan and Banjarmasin.
• Take responsible for swap project activity 2G system.
• Perform consistency check parameter before and after swap
• Uploading 2G Neighbour Cell and UMFI for 2G to 3G Reselection purpose
• Neighbour audit using NCS (RNO Tools) include neighbour addition /
deletion for.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Perform IRAT Audit and UMFI audit (neighbour to 3G)


• Consistency check parameter using C N A.
• Cross feeder identification and investigation for all sites.
• Capacity monitoring for 2G on radio side such as SDCCH, FPDCH, NUMREQ
dimensioning.
• Analysing Worst Preforming Cell include parameter / physical change
recommendation includes CR Execution through Winfiol and Command
Handling.
• Daily alarm monitoring 2G for certain swap batch in Balikpapan and
Banjarmasin.
• Site visiting if needed such as cross feeder case.

Feb 2015 – July 2015, Telkomsel Indonesia , Telkominfra , PT IMMOBI


2G Senior RF Optimisation Engineer, Telkomsel Operator , Jabodetabek (Feb-Apr
2015) & Sumbagut Region (April 2015 – July 2015)
• Join with TuebeX Project Telkomsel as Senior 2G RF.Optimisation Engineer
• Take responsible for Zone-1 2G Jabodetabek (3 Clusters)
• Take responsible for Zone 1, Zone 2 and Main Road Medan Belawan (8
clusters)
• Perform analysis of Bad Spot and Zero Drop include parameter/physical
changes recommendation includes parameter changes implementation.
• Analysing Worst Preforming Cell include parameter/physical changes
recommendation includes parameter changes implementation.
• Perform regional weekly meeting with Telkomsel regarding Weekly
Reports.
• Perform Neighbor Audit

May 2014 – November 2014 , Ericsson Indonesia , PT LMT Indonesia


2G/3G Team Leader, NPI Service Ericsson Indonesia , Telkomsel Operator Batam
Region , Sumbagteng.
• Offered as Team Leader for 2G/3G Network Performance and Optimization
and report directly to NPI Telkomsel account Project Manager.
• Managing Bad Spot , Hot Spot and IBS Redesign Report include final
reporting.
• Managing and supervised 2G/3G engineers , OSS Engineer, STS Negineer,
Drive Tester and Rigger in Batam. (consist of 4 RNCs and 6 BSCs )
• Responsible to improve target 2G KPIs such as Drop Call Rate, CSSR, TCH
Availability, HOSR, SDCCH Drop, TCH and SDCCH Congestion. 3G KPIS CSSR
CS, CSSR PS, CSSR HS, CCSR CS , CCSR PS , CCSR HS , SHO, IFHO ISHO,
Capmon
• Regular weekly meeting with SQA Regional to present current issues,
network performance and optimization activities done every week.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Optimize both 2G and 3G network for IRAT, 2G-3G Cell Reselection strategy
and Capacity Monitoring.
• Preparing Monthly report for Ericsson to be submitted to customer for
evaluataion for KPI achievements.
• Preparing all SOP for parameter changes, Drive Test report and also
template for regular reporting as standard reporting to Telkomsel SQA
• Coordination Supervised and monitor all optimization activities done by
engineer by following procedure and standard required by Telkomsel
• Coordination Support and co-ordinating for any major events such as MTQ,
POSTEL DTand VIP Complain such as preparing Drive Test team for standby,
performance report for every event, feature trial before and after for
evaluation.
• Support Internal Ericsson Solution department for any new
product/features trial.
• Perform drive test analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).

November 2011 – April 2014 , Ericsson Indonesia , Obelixnetwork Malaysia


2G Team Leader, NPO MS AXIS Ericsson Indonesia , AXIS Operator Jabodetabek –
Sumatera Region ( November 2011 – April 2014 )
• Coordination with GSC India in daily optimization activities.
• Strategic Optimization Sumatera Region.
• Offered as Team Leader for 2G Network Performance and Optimization
and report directly NPO-AXIS MS Project Manager.
• Managing and supervised 10 x 2G engineers in Jabodetabek and Sumatera
consist of 20 BSCs.
• Responsible to improve target KPIs such as Drop Call Rate, CSSR, TCH
Availability, HOSR, SDCCH Drop, TCH and SDCCH Congestion.
• Regular weekly meeting with NTS to present current issues, network
performance and optimization activities done every week.
• Optimize both 2G and 3G network for IRAT, 2G-3G Cell Reselection strategy
and Capacity Monitoring for Radio, ABIS, ATER, Iub, IuCS, IuPS
• Preparing Monthly report for Ericsson to be submitted to customer for
evaluataion for KPI achievements.
• Preparing Monthly report for Ericsson to be submitted to customer for
evaluataion for KPI achievements.
• Preparing all SOP for parameter changes, Drive Test report and also
template for regular reporting as standard reporting to NTS.
• Coordination Supervised and monitor all optimization activities done by
engineer by following procedure and standard required by NTS
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Coordination Support and co-ordinating for any major events such as Java
Jazz Festival, Jakarta Fest, Indonesia International Motorshow. And all
Marketing events and request from customer such as preparing Drive Test
team for standby, performance report for every event, feature trial before
and after for evaluation.
• Support and co-ordinating for any major events such as Java Jazz Festival,
Jakarta Fest, Indonesia International Motorshow. And all Marketing events
and request from customer such as preparing Drive Test team for standby,
performance report for every event, feature trial before and after for
evaluation.
• Monitor and 5eighbo voice and data capacity such as TCH/ SDCCH
utilization, GPRS/EDGE performance, GSL/RPP utilization and proposed for
upgrade if necessary. Special Documents ie Network Augmentation Order
(NAO) to be released for any DRU, RPP board or Transmission link upgrade.
• Co-ordinating with other related department such as Transmission
Planning, RF Planning, Back Office, NOC and Field Maintenance for further
action related to any major issues.
• Support Internal Ericsson Solution department for any new
product/features trial.
• Performed daily optimisation on 6eighbor area for AXIS network in
Jabodetabek which consist of BSCKU01 , BSCKU02.
• Perform drive test analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).

( November 2009 – November 2011 ) , Ericsson Indonesia , Obelixnetwork


Malaysia
Sr. RF Optimisation Engineer, NPO MS AXIS Ericsson Indonesia , AXIS Operator
Jabodetabek
• Offered as RF Optimisation Engineer and report directly NPO-NTS MS
Project Manager.
• Performed daily optimisation on 6eighbor area for AXIS network in
Jabodetabek which consist of BSCJK01, BSCJK02, BSCJK03 , BSCJK04
,BSCJK05
• Responsible to improve target KPIs such as Drop Call Rate, CSSR, TCH
Availability, HOSR, SDCCH Drop, TCH and SDCCH Congestion.
• Producing Monthly, Bimonthly and Postel report that consist of Voice Drive
test plots (Rx Lev, Rx Qual, SQI) and Data drive test plots and statistic (GPRS
and EDGE) to be submitted to Project Manager.
• Produced report before and after for Global Network tuning such as new
BSC software patch, GPRS parameter, Radio Parameter and others.
Supervised Drive Test team to conduct test for verifications.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Performed network tuning to improve main KPI which involve parameter


tuning, frequency tuning, site physical tuning (downtilt antenna,
reorientate etc). This come together with report before and after
implementation.
• Performed trial and implementation for parameter that can improve KPI
such as ACLC, Locating (ACCMIN,MSRXMIN), Dynamic AMR FR/HR, Cell
Load Sharing etc.
• Handling VIP customer complaint for voice and data (GPRS and EDGE) issue.
Supervised Drive Test team to conduct the test. Brief reports were
prepared to show the action and improvement.
• Daily consistency checks, alarm and faulty monitoring. Any major
alarm/fault will be escalated to Back Office/ Field.

September 2009 – November 2009 Ericsson Indonesia , Sinergi Aiticon


Sr. RF Optimisation Engineer (Ericsson Network ) – ( Telkomsel Operator,
Palembang ) Sumbagsel Indonesia
• Consultant for NPI Services, Telkomsel 2G Project. Take responsible for
Palembang Area, West Region.
• Perform statistic analysis based on baseline KPI agreement.
• Perform BSS parameter changes including implementation to achieve the
KPI target of New Site Roll Out.
• Perform drivetest analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).

April 2009 – August 2009 , Ericsson Indonesia ,


Sr. RF Optimisation Engineer (Ericsson Network ) – ( Telkomsel Operator,
Pekanbaru West) Batam, Indonesia
• Consultant for NPI Services, Telkomsel 2G Project. Take responsible for
Pekanbaru West Cluster, West Region.
• Perform statistic analysis based on baseline KPI agreement.
• Perform BSS parameter changes including implementation to achieve the
KPI target.
• Perform drivetest analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).
• Perform inconsistency check BSS parameter including clean up any
inconsistencies.

December 2008 – February 2009 Nokia Siemens Network Indonesia , Aircom


International Singapore
Sr. RF Optimisation Engineer (Ericsson Network ) – ( GSM Excelcom Operator,
East Region) Surabaya, Indonesia
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Consultant for NSN NPI Services, Excelcom 2G Project. Take responsible for
Madura Cluster, East Region.
• Perform statistic analysis based on baseline KPI agreement.
• Perform BSS parameter changes including implementation to achieve the
KPI target.
• Perform drivetest analysis, tuning BSS parameter and propose physical
changes (antenna tilt etc).
• Perform inconsistency check BSS parameter including clean up any
inconsistencies.
• Perform neighbour audit using NCS (RNO 8eighbor)

September 2008 – Oktober 2008 , Ericsson Indonesia , PT LMT Indonesia


RND & Optimisation Engineer (Ericsson Network ) – ( GSM Excelcom Operator ,
FLP project) Jakarta, Indonesia
• Creating frequency planning for FLP Dual band GSM network including BSIC
plan, HSN, MAIO plan using TCPU 7.1.
• CDD preparation for new plan and modifying hopping type (baseband to
synthesize) including implementation/execution to the network.
• Perform statistic analysis for new synthesize hopping network.
• Perform optimisation of new frequency plan and new hopping system to
achieve the KPI target.

December 2007 – June 2008 , Ericsson Indonesia , PT LEXCORP Indonesia


RF Optimisation Engineer (Ericsson Network ) – Network Performance
Improvement Services ( Indosat 2G/3G Operator ) Jakarta, Indonesia
• Consultant for Ericsson NPI Services, Indosat 2G Project. Take responsible
for AREA1 (Highly Dense and VIP Area) , ( 4 BSCs ).
• Monitoring the BSC and Cell Statistic using Static analyser 3.1
• Maintain and optimizing main KPI for 3 BSCs such as TCH Drop Rate, SDCCH
Drop Rate, Handover Success Rate, Random Access Success Rate, Call Setup
Success Rate TCH congestion, SDCCH congestion to achieve the KPI target.
• Optimised the network by tuning Parameter Changes (Ericsson R11) such
as Idle mode, Locating, Dual band Traffic Balancing, Power Control,
Dynamic Half Rate etc.
• Determine the cause of degradation such as Transcoder congestion,
Transmission congestion, Transmission Link failure, Faulty TRX etc.
• Clean up inconsistencies parameter.
• Maintain 9eighbor9 relation using NCS (RNO).
• Prepare and submit parameter changes based on result of performance
statistic and drive test analysis.
• Drive test analysis using TEMS 7.1 and Mapinfo.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Submitting drive test request to the drive tester team for particular
• problem cells which is indicated by statistic data.
• • Optimising Indoor (IBS) cellsite.
• • VIP complain optimisation.

September 2007 – November 2007 Ericsson Hub Senegal (Guinea Conakry)


RF Planning & Optimisation Engineer (Ericsson Network ) – Cellcom Guinea
Conakry)
• Perform Site design for Cellcom GSM Dualband network.
• Perform Preliminary Site Survey and Join Technical Site Survey.
• Preparing Technical Site Survey Report.
• Technical Meeting with customer.

March 2007 – June 2007 , Ericsson Indonesia , PT LEXCORP Indonesia


RF Optimisation Engineer (Ericsson Network ) – Network Performance
Improvement Services ( Indosat 2G/3G Operator ) Jakarta, Indonesia
• Consultant for Ericsson NPI Services, Indosat 2G Project. Take responsible
for BEKASI1 Cluster , ( 4 BSCs ).
• Monitoring the BSC and Cell Statistic using Static analyser 3.1
• Maintain the main KPI for 3 BSCs such as TCH Drop Rate, SDCCH Drop Rate,
Handover Success Rate, Random Access Success Rate, Call Setup Success
Rate TCH congestion, SDCCH congestion to achieve the KPI target.
• Perform RF Optimisation for maintaining main KPI such as TCH Drop,
Handover Success Rate, Random Access Success Rate, Call Setup Success
Rate. Additional KPI such as SDCCH Drop, TCH Congestion, SDCCH
Congestion.
• Optimised the network by tuning Parameter Changes (Ericsson R11) such
as Idle mode, Locating, Hierarchical Cell Structure, Power Control, Dynamic
Half Rate etc.
• Determine the cause of degradation such as Transcoder congestion,
Transmission congestion, Transmission Link failure, Faulty TRX etc.
• Monitoring KPI statistic for TRX upgrade site, troubleshooting for particular
problem site after TRX Upgrade implementation such as parameter audit
and site audit.
• Monitoring KPI statistic for New On Air site, troubleshooting for particular
problem site after new site implementation such as parameter audit and
site audit.
• Preparing weekly report for BEKASI1 cluster.
• Clean up inconsistencies parameter.
• Maintain 10eighbor10 relation using NCS (RNO).
• Swapped Feeder analysis based on drive test and Handover statistic data.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Perform analysis of hardware failure for particular problem cell using


Command Handling.
• Prepare and submit parameter changes based on result of performance
statistic and drive test analysis.
• Drive test analysis using TEMS 7.1 and Mapinfo.
• Submitting drive test request to the drive tester team for particular
problem cells which is indicated by statistic data.

October 2006 – January 2007 LMN Ericsson Telefonaktiebolaget, Kingdom of


Saudi Arabia , Inteligent Solutions UK
Sr. RF Optimisation Engineer – Network Performance Improvement Services (
Mobily 2G/3G Operator ) Jeddah, Saudi Arabia
• Consultant for Ericsson NPI Services, Mobily Etihad (2G/3G GSM Operator
in Jeddah Region).
• Take responsible for 3 BSCs ( E205, E251, E232)
• Monitoring the BSC and Cell Statistic using Business Object.
• Monitoring the BSC and Cell Statistic using Real time Performance
Monitoring (RPMO).
• Maintain the main KPI for 3 BSCs such as TCH Drop Rate, SDCCH Drop Rate,
Handover Success Rate, TCH Assignment Success Rate TCH congestion,
SDCCH congestion to achieve the KPI target.
• Maintain neighbour cell relation for the existing and new on-air sites using
NCS and MCOM 4.2.
• Perform analysis of hardware failure for particular problem cell using
Command Handling.
• Parameter Tuning (R11) such as, Hierarchical Cell Structure, Dynamic MS
Power Control, Dynamic BTS Power Control , BSIC re-planning etc.
• Prepare and submit parameter changes based on result of performance
statistic and drive test analysis.
• Drive test analysis using TEMS 7.1 and Mapinfo.
• Submitting drive test request to the drive tester team for particular
problem cells which is indicated by statistic data.
• Task involved in Hajj Project 2006 for Fast Optimisation Team for Hajj event.
(Haram, Mina, Muzdalifah, Arafat).

• February 2005 – March 2006. LMN Ericsson Nigeria , Networkers
International UK
• Sr. RF Optimisation Engineer – Network Performance Improvement
Services ( for V-Mobile Nigeria, Dual Band GSM Operator )
• Lagos , Victoria Island
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Consultant for Ericsson NPI Services, for supporting V-Mobile GSM


Operator in Lagos Region.
• Monitoring the BSC and Cell Statistic using Optima and Business Object.
• Maintain the main KPI for 3 BSCs such as TCH Drop Rate, SDCCH Drop Rate,
Handover Success Rate, TCH Assignment Success Rate to achieve the KPI
target.
• Perform BCCH Frequency retune (synthesized hopping network) to using
MCOM 4.2. and combine with TCP 3.4 for analysing the interference.
• Maintaining and clean up cell 11eighbor11 relation for the existing and new
on-air sites using TCP 3.4 and NCS
• Perform analysis of hardware failure for particular problem cell using
Command Handling.
• Parameter Tuning (Ericsson R9 & R10) such as, Hierarchical Cell Structure,
Dynamic MS Power Control, Dynamic BTS Power Control , BSIC re-planning
etc.
• Perform implementation of parameter changes using CNAI (Cell Network
Administrator Import).
• Perform implementation of parameter changes using OSS Command
Handling, CNA , CNAI (import/export)
• Submitting drive test request to the drive tester team for particular
problem cells which is indicated by statistic data.
• Analysing drive test data using Tems Investigation 5.1 and post processing
in Mapinfo.
• Preparing KPI weekly Report .

March 2004 – December 2004. Ericsson Private Limited, India , Networkers


International UK
Sr. RF Engineer, Network Optimisation – Network Performance Improvement
Services. ( Airtel India , Dual band GSM Operator )
New Delhi
• Perform network performance analysis using Business Object, RNO tools
(MRR, NCS and FAS) and create the BSS parameter Changes Request. (R10).
• Perform BSC performance improvement by removing top 10 worst cells
which is not achieved KPI such as SDCCH Drop rate, TCH Drop rate,
Handover Success rate, TCH assignment success rate.
• Perform performance analysis using Business Object, RNO tools (MRR, NCS
and FAS).
• Generate the BSS parameter Changes Request.
• Parameter Tuning (Ericsson R10) such as, MBC (Multi Band Cell) , Dynamic
MS Power Control, Dynamic BTS Power Control etc.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Remove inconsistency parameter based on consistency check recording


using CNA.
• Perform weekly KPI presentation for the responsible BSCs for internal NPI
meeting.
• Neighbor cell 12eighbor12ion using NCS and NOX (recommendation) to
achieve KPI (Handover Successful Rate).
• Submitting drive test request to the drive tester team for some problem
cells which is indicated by statistic data.
• Drive test analysis for some problem cells and creating the changes
recommendation.
Chandigarh & Rajashtan
• Task involved initial network validation to support the Radio Network
Design .
• Perform network performance statistic analysis using Business Object.
• Propose BSS parameter changes recommendation (Ericsson R9) for
GSM900 and GSM1800 network to achieve the KPI’s target.
• Maintenance of 13eighbor cell list, 13eighbor cell offset, up link and down
link power control parameter, locating parameter etc.
• Perform monthly drive test analysis and preparing the presentation report
including BSS Parameter Changes Request to be submitted to the customer.
• Perform troubleshooting for VIP customer complain which is related to RF
and creating investigation report & recommendation.

November 2001 – March 2004, PT Ericsson Indonesiasia , Contractor


Sr. RF Engineer, Radio Network Design & Optimisation.
• Perform site survey and site hunting for GSM1800 network and preparing
Site Survey Report.
• Perform site survey for dual band Outdoor Microcells and drive test
measurement using TEMS Transmitter & Tems Investigation.
• Perform join Survey with the client.
• Preparing Cell Design Data and Interference plot for GSM1800 new sites
rollout.
• Collecting & processing Radio Interference Recording data in OSS to be
used in uplink interference identification.
• Changing the BSS parameter by using MML command from command
handling related to GSM 1800 new site rollout.
• Perform initial tuning and optimisation for new on air sites on GSM 1800
network, which consist of Site Audit, Preliminary Drive test, BSS Parameter
Changes Implementation, Hardware Changes proposal.
• Preparing Network Tuning & Acceptance Test Report for the new sites,
which is achieved KPI target.
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Join effort with Operation and Implementation to perform trouble shooting


on the BTS related to the RF performance problem.
• Optimising the traffic distribution in HCS layer (Ericsson R8)
• Analyse the statistic counter (Call setup success rate, TCH drop call rate,
SDCCH drop rate and handover successful rate )
• Task involved traffic analysis for dual band network using Planet Prediction
tools.
• Task involved drive test for in building site for GSM 1800.
• Task involved frequency clearance test for Charoen Phokphand project
GSM 1800.

October 2000 – August 2001 , Ericsson Saudi Arabia , Intelligent Solutions UK


RF Design & Optimisation Engineer
• Team leader for Network Optimisation in MSC GSR3, South Riyadh and
Riyadh – Khamasin.
• Perform network optimisation, which consist of BSS parameter changes,
antenna type changes, antenna downtilt changes, antenna orientation
changes, TRU upgrade proposal.
• Perform new site initial tuning for vendor swapped out project.
• Task Involved Preliminary RF Survey, Technical survey to determine
coverage objective, best candidate, antenna configuraton, site
configuration.
• Co-ordination with subcontractor for preparing Site Search Order and Site
Survey Report to be submitted further to Project Divison.
• Maintenance of neighbour cell list, neighbour cell offset, up link and down
link power control parameter, locating parameter, HCS layer parameter etc.
(Ericsson R7 , R8 )
• Coordinating rigger team to perform site audit, and antenna configuration
changes.
• Directing the drive test team to do the daily activity.
• Perform drive test investigation based on VIP trouble ticket, problem found
from statistic data and weekly drive test data.
• Verification (acceptance test), validation of BSS parameter changes.
• Analyse the statistic counter (Call setup success rate, TCH drop call rate,
SDCCH drop rate and handover successful rate )
• Preparing Weekly Report for MSC GSR3 Network Performance.

December 1999 – August 2000 , IRIS Telekomunikasyon Turkiye _ PT Mitrakom


Indonesia
2G RF Optimisation Engineer
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• RF optimisation team for Izmir city, Izmir Turkiye Responsible for Turkcell’s
pilot project (GSM 900)
• Performing drive test for various requirement such as new site verification
(site acceptance test), validation of BSS parameter changes, benchmarking,
and trouble shooting based on trouble ticket
• Performing post processing and analysis of drive test result for all
requirements. And propose some network changes in order to
• enhance the network performance and proposed some antenna
configuration (antenna downtilt, antenna direction)
• Analyse the statistic counter (Call setup success rate, TCH drop call rate,
SDCCH drop rate and handover successful rate )
• Proposed some parameter changes (Ericsson R6) to enhance the network
performance and proposed some antenna configuration (antenna downtilt,
antenna direction)
• Preparing and submitting New Site Drive test Report to the customer.
• Task Involved Preliminary RF Survey, Technical survey to determine
coverage objective, best candidate, antenna configuraton, site
configuration.

July 1997 – December 1999 , PT Excelcomindo Pratama , Indonesia RF


Optimisation Engineer.
Team Leader For East and West Jakarta cluster.
• Performing drive test acceptance test for new sites integration which
consist of coverage test, timeslot access test, verification of CDD (cell data
design) which consist of BCCH, BSIC, LAC, and to determine swap feeder or
sector.
• Post processing and analysing the new site drive test data
• Initial tuning for new sites which consist of BSS parameter changes
(Ericsson R5) and antenna configuration changes (antenna downtilt and
antenna direction)
• Drivet test verification after tuning modification.
• Perform benchmarking test to be compared to the competitor’s network.
• Perform monthly drive test for whole East Jakarta Cluster.
• Analyse the statistic counter (Call setup success rate, TCH drop call rate,
SDCCH drop rate and handover successful rate ) Perform site audit.
• Supervision to the radio network performance group for ongoing network
optimisation
• Maintenance of neighbour cell list, neighbour cell offset, hysteresis setting,
up link and down link power control parameter, normal and urgency hand
over threshold, locating parameter etc. (BSS Parameter)
• Supervision of network fault resolution, using TEMS by Ericsson and
Promas/Dimas by Safco
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

• Supervision of ongoing quality of service measurements using Comarco


Gen II (drive test equipment)
• Frequency clearance of external interference using spectrum analyser
• Co-ordination with another department within the company such as radio
network design, NOC, field operation, customer service, marketing, support
service, IT.

Skills Capable to use the following tools:


• Mapinfo 12
• ITK Statistik tools
• ESPA Statistic Tools
• RPMO (Real time Performance Monitoring).
• TEMS Investigation 10
• TEMS Investigation 8.03
• TEMS Investigation 7.1
• Nemo Handy
• MCOM 4.2 (Drive test analysis tools)
• Business Object (Statistic tools)
• RNO Tools (FAS, NCS, MRR,NOX Recommendation )
• CITRIX-ICA , Exceed, Reflection (OSS Command Handling, CNA, CNAI )
• Winfiol
• Mapinfo 8, Mapinfo 11.5
• OPTIMA statistic tools
• GIMS98, GIMS7 (Post processing tools for drive test)
• TEMS Transmitter (Indoor Tools)
• Tems Cell Planner 3.2.1 & 3.2.4 & 3.4 , TCPU 7 (Prediction tools)
• Tems Investigation Version 3.2.4 , Version 4.0.2 , Version 5.1.1 (Drivetset
Measurement tools)
• Planet tools by MSI (Prediction tools)
• TEMS 900/1800 by Ericsson (TEMS Classic)
• FICS (file and information converting system) by Ericsson
• Walkabout by Safco (Measurement tools)
• Voice Print (PVP) by Safco (Measurement tools)
• OPAS32 by Safco (Post processing & anaysing tools)
• Dimas by Safco ( Indoor Measurement tools)
• Promas by Safco (Measurement tools)
• NDR by Comarco Wireless Technology (Measurement tools)
• Spectrum Analyser HP , Anritsu
• Microsoft Office 2016 / 2013 / 2010 /2007 /2003 /2002 (Access , Word,
PowerPoint, Excel)
WELLY LUKMANULHAKIM
MAILING ADDRESS : JL. JANAKA 1 NO. 8 , INDRAPRASTA 2, BOGOR 16152 , INDONESIA
E-MAIL : wellylukmanulhakim2@yahoo.com
MOBILE NUMBER : +62 813 100 80006

====================================================================================

Languages • Indonesia fluent English fluent

Relevant Training • SAP Process Integration , by PT CIC , Bogor 2019


• 2G/3G RF Optimisation Training , Jakarta 2014
• Tems Visualisation, overview by Ericsson 2006
• Realtime Performance Monitoring RPMO training, Ericsson Saudi 2006
• Ericsson RBS 2000 Workshop by Ericsson Indonesia 2003
• Radio Network Tuning Workshop by Ericsson Ericsson Indonesia 2003
• GSM Radio Network Features (R8, R9.1) by Ericsson Indonesia 2003
• Cellular Basic Fundamental CME20 by Excelcom 1998
• Radio network features (Ericsson R6) by Excelcom1998
• Supervisory Training by LPPM-Excelcom 1998
• Electronic Data Communication by Excelcom 1998
• Time Management by Excelcom 1998
• Electronic Devices by Excelcom 1998
• Cellular Optimisation by Comarco Wireless technology1997
• Ericsson RBS 2000 training for Excelcom 1997
• Cell Planning Survey by Excelcom 1997
• Cell Planning Workshop CME20 by Excelcom1997
• Cellular System Engineering by Excelcom 1997

• Anton Hartono , HR Director , PT CIC , Bogor Indonesia


• Amos Phahla, RND Manager, Ericsson SA (Nigeria Porject)
Mobile : +234 802 7339924 Office : LMN Ericsson Nigeria, Lagos V.I ,
References Nigeria
• Buky Akande, Service Account Manager, LMN Ericsson Nigeria . Mobile :
+234 802 222 4231 Office : LMN Ericsson Nigeria, Lagos V.I , Nigeria -mail :
buky.akande@ericsson.com
• Jim Heinen ,Ericsson UK , Ericsson SA Project ( Cellcom Guniea Conakry
2007 )
• David ST Hasibuan , Ericsson Indonesia (AXIS Project Jakarta)
• Umesh Yadav , Ericsson Jakarta (AXIS Project Jakarta)
• Zauhari , Ericsson Jakarta (Telkomsel Project , Sumatra)
• Willy Pardede , Ericsson Jakarta (Telkomsel Project , Sumatra)

You might also like