b. TRIPS/alarms to be checked
description Mark v Tag no Field
Switch no
Flame failure Trip L28f DT 28FD-
7, 28FD-8
Exhaust spread High trip L30SPT5
Exhaust Gas temp.High trip L86TXT
Trip oil Pressure Low trip L63HLL 63 HL-
1,63 HL-2, 63 HL-3
Lube oil Supply Temp.High trip L26QT 26 QA-
1,26QT-1A, 26QT-1B
Over Speed trip L12H 77NH-
1, 77NH-2, 77NH-3
Lube oil. Pressure low L63QTX 66 QA-
2,63 QT-2A,63QT-2B
Exhaust Gas Pressure High trip L63ETH 63 EA-
1, 63 ET-1,63 ET-2
Vibration High trip L39 VT 39 V-
1A,1B,39V-3A,3B,39V-4A,4B,39V-4D,4E,4F, 39 V-5A,5B
Customer Trip L4 CT
On Base Liquid Fuel Suppy PR. Low L63FL2A Z 63FL-
2A
OFF Base Liquid Fuel Suppy PR. Low L63FL2B Z 63 FL-
2B
Warren pump Lube oil pr. Low L63 QAT 63 QA-
3,63 Qa-4
Warren pump Lube oil Temp.High trip L26QT3 26 QT-
3
IGV Control trouble trip L41 GVT
Turbine Air inlet Filter DP HighL63TFH 63 TF-
1,63 TF-2A,63 TF-2B
c. Gas monitors to be checked / calibrated
Acc. Comp 45 HA-1,2
Turbine comp 45 HT-1,2
Off base skid 45 HFS-1,2
Off base skid 45 HFS-3
Turbine comp 45 HT-3
Acc. Comp 45 HA-3
d. Fire Protection system sensors/solenoid/switches to be checked /
calibrated
Fire protection -CO2 release solenoid valve 45 CR-1to6
Fire protection Co2 - release Pr. Switch 45 CP-1to6
Fire alarm bell LS2-1
fire Detector - ACC. Comp 45 FA-1A
45 FA-1B
45 FA-2A
45 FA-2B
fire Detector - Turbine. Comp 45 FT-1A
45 FT-1B
45 FT-2A
45 FT-2B
fire detector - Exhaust Comp 45 FT-8A
45 FT-8B
fire detector - Exhaust Comp 45 FT-9A
45 FT-9B
Fire Detector - OFF base fuel skid 45 FL-1A,2A
Electronic Hooters EH-1to4
Emergency push buttons EPB-1to6
e. Additional Job list
Nox steam inlet line first and second valves to be serviced
Nox steam inlet line both flow meters to be checked
Naphtha control valve tuning and stroke check to be done
HSD control valve tuning and stroke check to be done
Atomizing air temperature control valve to be serviced
Self cleaning system SOV 's in south & north bank to be checked
c. Re assembly
i. Rotor placement inside the turbine compartment
ii. alignment checking of the newly installed rotor.
iii. replacement of the outer casings
iv. Replacement of the turbine outer pipings
v. Coupling the turbine to load gear and accessory
compartment coupling