Professional Documents
Culture Documents
numbers
Electrical Power
Transmission (EE-
352)
Transmission Poles/Towers
Audit Form
Part 1 – Parameter Estimation
1 Location
3 Height of Tower
(approx. m/ft)
4 Voltage level
(AC/DC)
Arcing Horn
6 (present/absent)
Type of Circuit
10
(single/double/multiple)
Page 2 of 8
S Parameter Location#1 Location#2 Location#3 Location#4
No
Types of conductors
12
(single/bundled)
13 Bundled Conductors
(triangular/rectangular spaced)
Types of insulators
15 (suspended/strain/both/others)
Distance between
20
towers/length of span
(approx., m/ft)
Vibrations (resonant/galloping/
22
dancing)
23 Type of dampers
S Parameter Location#1 Location#2 Location#3 Location#4
No
28 Temperature (°𝐶)
31 Humidity (%)
Part 2 – Attributes and Recommendations
4
Part 3 – Pole/Tower Pictures along with student(s)
Location#1
Location#2
Location#3
Location#4