PERMIT APPLICATION FOR AUTHORIZATION TO DISCHARGE


NON-CONTACT COOLING WATER

1. NON-CONTACT COOLING WATER

Provide a schematic flow diagram of the non-contact cooling water system including
inlet, heat exchangers, distribution and discharge.

Diagram No. _________________

2. DESIGN RATE OF NON-CONTACT COOLING WATER

Average discharge rate Maximum discharge rate


(m3/h): (m3/h):

3. TEMPERATURE

What is the estimated increase in temperature of the non-contact cooling water passing
through the system?

Average increase in Temp Maximum increase in Temp


(C) : (C) :

4. ADDITIVES

a) Will supplementary chlorination be used

[ ] Yes [ ] No

b) Will any chemical(s) be introduced in the non-contact cooling water system on a


continuous or intermittent basis?

[ ] Yes [ ] No

c) If yes, provide information on the chemical(s):

Chemical Composition Application Rate/ Conc. in Final


Frequency Discharge
(mg/l)

W5-1
Facility: ______ Initials: ______
528774544.rtf

d) Submit Material Safety Data Sheets (MSDS) of all the additives (except for
chlorine)

List the relevant section/ page numbers in the addendum

5. CHARACTERISTICS OF VARIANCE STREAMS (JUBAIL)/ BRINE


DISCHARGES TO THE RED SEA (YANBU)

a) Any wastewater stream(s) will be introduced to the non-contact cooling water system
on a continuous or intermittent basis:

[ ] Yes [ ] No

b) If yes, complete the following tables providing information on each constituent that
will or may be present in the non-contact cooling water stream (Variance Stream)
which will be introduced either continuously or intermittently

Source Avg. Discharge Maximum Frequency of


Rate discharge rate Discharge
(m3/h) (m3/h)

Quality of the variance stream/ brine prior to mixing with the return cooling water

Parameter Average Maximum


Concentration Concentration (mg/l)*
(mg/l)*
As per Table 3-D of RCER 2004
and other parameters if any

6. SAMPLING

a) Provide location of sampling points, flow meter, flow totalizer and temperature
measurement for the seawater cooling return.

Drawing No. _________________

W5-2
Facility: ______ Initials: ______
528774544.rtf

b) Provide location of sampling points, flow meter, flow totalizer, auto-sampling


system and any continuous monitoring analyzers for the variance stream/ brine
prior to mixing with the seawater cooling return

Drawing No. _________________

c) Provide details of the cabin(s) to be built for housing any auto-sampling system(s)

Drawing(s) No. _________________

d) Provide details of any continuous monitoring analyzers used for variance stream/ brine

List the relevant section/ page numbers in the attachment

e) Identify a list of parameters to be regularly monitored and reported to the Royal


Commission in the monthly self-monitoring reports for seawater cooling return

Parameter Frequency

f) Identify a list of parameters to be regularly monitored and reported to the Royal


Commission in the monthly self-monitoring reports for variance streams/ brine

Name of Variance Stream Parameter Frequency

7. Provide a site plan indicating the proposed location of the outfall to the Red Sea

Drawing(s) No. _________________

W5-3
Facility: ______ Initials: ______