Professional Documents
Culture Documents
Update: 22-May-21
TM Surabaya
Project Progress Report
TM Surabaya
(22-May-21)
PROJECT SUMMARY (DAILY) ............................................................................................................................ 2
PROJECT ON PROGRESS
1. JOB DETAIL (KRI SHS 990) : CONTINUE ..................................................................................................... 11
1) DG-1 .......................................................................................................................................................... 12
2) DG-2 .......................................................................................................................................................... 19
2. JOB DETAIL (KT JAYANEGARA 401) : CONTINUE ...................................................................................... 22
1) PROP-STBD ............................................................................................................................................. 23
2) PROP-PORT ............................................................................................................................................. 25
3. JOB DETAIL (KRI AHP 355) : CONTINUE ..................................................................................................... 26
1) MPK 1 / ME-SB ......................................................................................................................................... 27
2) MPK 2 / ME-PS ......................................................................................................................................... 28
4. JOB DETAIL (KT KST 356) : CONTINUE ....................................................................................................... 30
1) MPK 1 / ME-SB ......................................................................................................................................... 31
1) MPK 2 / ME-PS ......................................................................................................................................... 33
PROJECT FINISHED
5. JOB DETAIL (KT SUBALI II) : FINISHED ....................................................................................................... 35
1) PROP-PORT ............................................................................................................................................. 36
6. JOB DETAIL (KRI YOS 353) : FINISHED ....................................................................................................... 37
1) MPK 1 / ME-SB ......................................................................................................................................... 38
2) MPK 2 / ME-PS ......................................................................................................................................... 38
7. JOB DETAIL (KRI KPL 981) : FINISHED ....................................................................................................... 39
1) DG-2 .......................................................................................................................................................... 40
8. JOB DETAIL (AHTS TRANSKO CELEBES) : FINISHED ............................................................................... 41
1) AE DG-1 ..................................................................................................................................................... 42
2) AE DG-2 ..................................................................................................................................................... 42
3) FIFI-1 PS .................................................................................................................................................... 42
4) FIFI-2 SB .................................................................................................................................................... 42
Page 1 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
PROJECT SUMMARY (DAILY)
ACTIVE PROJECT
Page 2 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
FINISHED PROJECT
Page 3 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
PERSONNEL ACTIVE (TODAY)
Diki Saputra
Fajar Himawan
Fajar Setyawan
Sawal
Yohanes Suyanak
Senen (KD-Electrical)
Ahmad Rezaldi
Elu Susanto
Widiyanto
Dedik Subiyantoro
Ekky Saegara
M Choeroeriza
Mustajab
Luki Ariyanto
Page 4 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
Personnel Activity by Location (01-May-21 to 22-May-21)
ACTIVE
DIVISION NAME VESSEL LOCATION
DATE
ELECTRICAL DIVISION Diki Saputra 5-May-21 KRI YOS 353 SITE (OT)
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI AHP 355 SITE
20-May-21 KRI KST 356 SITE
21-May-21 KRI KST 356 SITE
22-May-21 KRI KST 356 SITE
Erlambang Widyasmoro (SPV-
3-May-21 KT JAYANEGARA 401 SITE
Electrical)
21-May-21 KT JAYANEGARA 401 SITE
Fajar Himawan 5-May-21 KRI YOS 353 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
11-May-21 KRI KST 356 SITE
17-May-21 KRI KST 356 SITE
18-May-21 KRI KST 356 SITE
Fajar Setyawan 1-May-21 KRI KPL 981 SITE (OT)
3-May-21 KRI KPL 981 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
WORKSHO
7-May-21 KRI SHS 990
P (OT)
SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Fiki Untung Saputra 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
WORKSHO
6-May-21 KRI SHS 990
P (OT)
WORKSHO
7-May-21 KRI SHS 990
P (OT)
SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Idham Gholili 3-May-21 KRI KPL 981 SITE
6-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
Page 5 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
21-May-21 KT JAYANEGARA 401 SITE
WORKSHO
Riwan Muhtar Findi 6-May-21 KRI SHS 990
P (OT)
WORKSHO
7-May-21 KRI SHS 990
P (OT)
SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Senen (KD-Electrical) 3-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
8-May-21 KRI SHS 990 SITE (OT)
18-May-21 KT JAYANEGARA 401 SITE
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI AHP 355 SITE
WORKSHO
ENGINE DIVISION Agung Jimmy Prasetyo (KD-Engine) 9-May-21 KRI SHS 990
P (OT)
21-May-21 KRI AHP 355 SITE
WORKSHO
Ahmad Khomar (WKD-Engine) 7-May-21 KRI SHS 990
P (OT)
WORKSHO
8-May-21 KRI SHS 990
P (OT)
WORKSHO
9-May-21 KRI SHS 990
P (OT)
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
WORKSHO
Ahmad Rezaldi 6-May-21 KRI SHS 990
P (OT)
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
11-May-21 KRI SHS 990 SITE
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE
22-May-21 KRI SHS 990 SITE (OT)
Ajie Rachman Mulyono 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
KT JAYANEGARA 401 SITE
17-May-21 KRI SHS 990 SITE (OT)
Page 6 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE
22-May-21 KRI SHS 990 SITE (OT)
Dedik Subiyantoro 5-May-21 KRI YOS 353 SITE (OT)
WORKSHO
6-May-21 KRI SHS 990
P (OT)
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
11-May-21 KRI SHS 990 SITE
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Ekky Saegara 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
Eko Miharsono 4-May-21 KT JAYANEGARA 401 SITE
WORKSHO
6-May-21 KRI SHS 990
P (OT)
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
WORKSHO
Elu Susanto 8-May-21 KRI SHS 990
P (OT)
18-May-21 KRI AHP 355 SITE
20-May-21 KRI KST 356 SITE
21-May-21 KRI KST 356 SITE
22-May-21 KRI KST 356 SITE
Fajar Ramadhan 17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Iin Sukinar 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
Joko Susilo 5-May-21 KRI YOS 353 SITE (OT)
WORKSHO
8-May-21 KRI SHS 990
P (OT)
Page 7 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
11-May-21 KRI KST 356 SITE
M Choeroeriza 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
18-May-21 KT JAYANEGARA 401 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
Rahmad Sudarsono 5-May-21 KRI YOS 353 SITE (OT)
WORKSHO
8-May-21 KRI SHS 990
P (OT)
11-May-21 KRI KST 356 SITE
17-May-21 KRI KST 356 SITE
18-May-21 KRI KST 356 SITE
20-May-21 KRI KST 356 SITE
21-May-21 KRI KST 356 SITE
22-May-21 KRI KST 356 SITE
Riyan Edhi Prasetyo 5-May-21 KRI YOS 353 SITE (OT)
WORKSHO
7-May-21 KRI SHS 990
P (OT)
WORKSHO
8-May-21 KRI SHS 990
P (OT)
WORKSHO
9-May-21 KRI SHS 990
P (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Rizqi Ramadhani 1-May-21 KRI KPL 981 SITE (OT)
3-May-21 KRI KPL 981 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
Sawal 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
18-May-21 KT JAYANEGARA 401 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
Sujito 5-May-21 KRI YOS 353 SITE (OT)
8-May-21 KRI SHS 990 WORKSHO
Page 8 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
P (OT)
20-May-21 KRI KST 356 SITE
21-May-21 KRI KST 356 SITE
22-May-21 KRI KST 356 SITE
WORKSHO
Sukamto 6-May-21 KRI SHS 990
P (OT)
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
11-May-21 KRI SHS 990 SITE
17-May-21 KRI SHS 990 SITE (OT)
18-May-21 KRI SHS 990 SITE (OT)
19-May-21 KRI SHS 990 SITE (OT)
20-May-21 KRI SHS 990 SITE (OT)
22-May-21 KRI SHS 990 SITE (OT)
Widiyanto 1-May-21 KRI KPL 981 SITE (OT)
3-May-21 KRI KPL 981 SITE
7-May-21 KRI SHS 990 SITE (OT)
8-May-21 KRI SHS 990 SITE (OT)
9-May-21 KRI SHS 990 SITE (OT)
10-May-21 KRI SHS 990 SITE (OT)
11-May-21 KRI SHS 990 SITE
20-May-21 KRI SHS 990 SITE (OT)
21-May-21 KRI SHS 990 SITE
Yohanes Suyanak 1-May-21 KRI KPL 981 SITE (OT)
3-May-21 KRI KPL 981 SITE
GEARBOX DIVISION Eky Gilang Pratama 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
18-May-21 KT JAYANEGARA 401 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
Rizky Nur Eka Putra 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
Wisnu Eko Saputro 4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
Page 9 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
18-May-21 KT JAYANEGARA 401 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KT JAYANEGARA 401 SITE
WELDER DIVISION Mustajab 4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
Sindhu Kusuma Putra 3-May-21 KT JAYANEGARA 401 SITE
4-May-21 KT JAYANEGARA 401 SITE
5-May-21 KT JAYANEGARA 401 SITE
6-May-21 KT JAYANEGARA 401 SITE
7-May-21 KT JAYANEGARA 401 SITE
8-May-21 KT JAYANEGARA 401 SITE (OT)
9-May-21 KT JAYANEGARA 401 SITE (OT)
10-May-21 KT JAYANEGARA 401 SITE
18-May-21 KRI KST 356 SITE
19-May-21 KT JAYANEGARA 401 SITE
20-May-21 KT JAYANEGARA 401 SITE
21-May-21 KRI KST 356 SITE
Page 10 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
1. JOB DETAIL (KRI SHS 990) : CONTINUE
VESSEL DATA
Page 11 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) DG-1
Engine Data Generator Data
Model : Caterpilar 3412 Model : SR4B
Serial No. : 9BR01007 Serial No. : 4SJ01596
Arr No : 179-0779 Frequency : 60 HZ
SMU : 11627 H Power : 500 kW
Power : 719 BHP / 536 BkW Current : 820 A
High Idle : 1817 RPM Voltage : 440 V
No Date Parts Description
1 5-Feb-21 Aftercooler Remove
2 Air Filter, Base Remove
3 Expansion Tank Remove
4 Fresh Water Pump Remove
5 Fuel Filter, Base Remove
6 Fuel Line Remove
7 Indicator Panel Remove
8 Injection Pump, Timing Gear Remove
9 Oil Cooler Remove
10 Oil Cooler, Base Remove
11 Oil Filter, Base Remove
12 Sea Water Pump Remove
13 Turbocharger Remove
14 Valve Mechanism, Cover Remove
15 Water Lines Remove
16 8-Feb-21 Air Starting Remove
17 Cylinder Head Remove
18 Generator, Coupling Remove
19 Generator, Cover Remove
20 Generator, Permanent Magnet Remove
21 Junction Box Remove
22 Pulley Remove
23 Rocker Arm Remove
24 Turbocharger, Housing Remove
25 9-Feb-21 Coupling, Plate Remove
26 Engine Oil Pump Remove
27 Flywheel Remove
28 Flywheel Housing Remove
29 Front Housing Remove
30 Generator, Stator, Exciter Remove
31 Oil Pan Remove
32 Piston As Remove
33 10-Feb-21 Generator, Housing Remove
34 Generator, Rotor Exciter Remove
Page 12 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
35 Injector Remove
36 Piston As Remove
37 11-Feb-21 Camshaft Remove
38 Crankshaft Remove
39 Cylinder Liner Remove
40 Heat Exchanger Remove
41 Piston As Remove
42 15-Feb-21 Camshaft Move to Main Deck
43 Crankshaft Move to Main Deck
44 Cylinder Head Move to Main Deck
45 Cylinder Liner Move to Main Deck
46 Engine Oil Pump Move to Main Deck
47 Front Housing Move to Main Deck
48 Fuel Lines Move to Main Deck
49 Fuel Priming Pump Move to Main Deck
50 Generator, Bearing Housing Move to Main Deck
51 Generator, Rotor Move to Main Deck
52 Heat Exchanger Move to Main Deck
53 Piston As Move to Main Deck
54 Piston Cooling Jet Move to Main Deck
55 Sea Water Pipelines Move to Main Deck
56 Sea Water Pump Move to Main Deck
57 Fresh Water Pipelines, Flexible Move to Main Deck
Connection
58 Sea Water Pipelines, Flexible Move to Main Deck
Connection
59 Turbocharger, Housing (Inlet) Move to Main Deck
60 16-Feb-21 Disassembled Parts: Deliver to Tesco's Workshop (Details on
attachment no. SIMB/05/II/2021)
Camshaft
Cylinder Head
Fuel Line
Heat Exchanger
Idle Gear
Injector
Liner
Oil Pump
Piston
Sensors
Rotor Generator
Tosen
Inlet Turbo
Piston Jet
Cover Front
Exhaust Elbow
Sea Water Pipelines
61 17-Feb-21 Cylinder Head Clean Up
62 Cylinder Liner Clean Up
63 Exhaust Temperature Sensor Remove
Page 13 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
64 Fuel Transfer Pump Disassemble and Clean Up
65 Generator, Rotor Measure resistance before clean up
process
66 Heat Exchanger Disassemble and Clean Up
67 Piston As Disassemble and Clean Up
68 Valve Mechanism Remove
69 Valve Spring Remove
70 Generator, Stator - Permanent Measure resistance before clean up
Magnet process
71 Generator, Exciter - Rotor Measure resistance before clean up
process
72 Generator, Exciter - Stator Measure resistance before clean up
process
73 Junction Box, Panel Perform Simulation
74 18-Feb-21 Camshaft Clean Up
75 Cylinder Liner Measuring
76 Generator, Rotor Exciter Clean Up
77 Generator, Stator Exciter Clean Up
78 Indicator Panel Clean Up
79 Junction Box Clean Up
80 Piston Pin Measuring
81 Rocker Arm Clean Up
82 Valve Guide Measuring
83 Valve Lifter Measuring
84 Valve Mechanism Clean Up
85 Valve Spring Measuring
86 Generator, Stator Exciter Clean Up
Permanent Magnet
87 Generator, Rotor Exciter Clean Up
Permanent Magnet
88 19-Feb-21 Connecting Rod Measuring
89 Cylinder Head Valve Measuring
90 Generator, Rotor Clean Up
91 Heat Exchanger, Cover Clean Up
92 Piston As Measuring
93 Cyilinder Head Clean Up
94 Chamber Clean Up
95 20-Feb-21 Engine Oil Pump, Shaft Measuring
96 Front Cover Clean Up
97 Piston Cooling Jet Clean Up
98 Valve Mechanism, Rotocoil Clean Up
99 Parts Replacement Check
100 22-Feb-21 Camshaft Measuring
101 Cylinder Head Colour Check
102 Generator, Rotor Clean Up
103 Injector, Nozzle Measuring
104 Replacement Parts Check
105 23-Feb-21 Diesel Generator Unit Verification 1
Page 14 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
106 24-Feb-21 Crankshaft Check visual condition, result: found
scratch wear on surface of the journal
107 25-Feb-21 Front Cover Check Spare Parts of DG of KRI SRI 352,
for replacement parts
108 Generator, Bearing Housing Check Spare Parts of DG of KRI SRI 352,
for replacement parts
109 Push Rod Check Spare Parts of DG of KRI SRI 352,
for replacement parts
110 27-Feb-21 Aftercooler Unit Test (using pressurized air to find leakage
occurred, with 1 bar of pressure), OK
111 Oil Cooler Test (using pressurized air to find leakage
occurred, with 5 bar of pressure), OK
112 2-Mar-21 Air Shutoff, Solenoid Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990 (Spring only)
113 Connecting Rod Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
114 Front Cover Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
115 Generator, Bearing Housing Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
116 Piston As Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
117 Push Rod Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
118 Turbocharger, Lines Take from KRI SRI 352 DG, to be installed
on DG 1 of KRI SHS 990
119 3-Mar-21 Connecting Rod Clean Up (parts taken from KRI SRI 352)
120 Front Cover Clean Up (parts taken from KRI SRI 352)
121 Piston As Clean Up (parts taken from KRI SRI 352)
122 Push Rod Clean Up (parts taken from KRI SRI 352)
123 Bearing Housing, Bracket Clean Up (parts taken from KRI SRI 352)
124 15-Mar-21 Heat Exchanger Press Test, OK
125 16-Mar-21 Spare Parts Check parts to be installed from KRI SRI
352
126 23-Mar-21 Disassembled Parts Clean Up
127 24-Mar-21 Disassembled Parts Clean Up
128 30-Mar-21 Disassembled Parts Maintain for assembly preparation
129 Tools Maintain for assembly preparation
130 6-May-21 Exhaust Valve, Insert Install
131 Intake Valve, Insert Install
132 Oil Sensor Replace
133 Rocker Arm Install
134 Spare Parts Take from TM Surabaya Warehouse to be
Installed
135 Turbocharger Assemble
136 Oil Transfer Pump Assemble
137 Junction Box, Mount Shock Install
138 Air Shutoff, Relay Replace
Page 15 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
139 Fuel Shutoff, Relay Replace
140 Solenoid, Air Starting Install
141 Engine Speed Indicator Install
142 Engine Oil Pressure Indicator Install
143 7-May-21 Cylinder Block Deliver to Site
144 Electrical System PerforM Simulation
145 Front Housing Deliver to Site
146 Generator, Bearing Housing Deliver to Site
147 Generator, Rotor Deliver to Site
148 Spare Parts Deliver from M3 Warehouse to Site
149 Valve Insert Grinding
150 8-May-21 Air Starting Unit Assemble
151 Crankshaft Move from Tank Deck to Engine Room
152 Cylinder Block Move and Placed under Oil Pan
153 Generator, Rotor Move to Generator Stator
154 Sea Water Pump Assemble
155 Cylinder Head (LH), Valve Insert Grinding
156 Cylinder Head (RH), Valve Guide Install and Measure Height after
installation
157 Cylinder Head (LH), Valve Guide Remove, Install, and Measure Height after
installation
158 9-May-21 Camshaft, Bearing Install
159 Crankshaft Clean Up and Install
160 Cylinder Head Assemble
161 Fuel Transfer Pump Assemble
162 Generator, Bearing Housing Install
163 Generator, Coupling Plate Install
164 Generator, Cover Install
165 Generator, Rotor Exciter Install
166 Generator, Stator Exciter Install
167 Heat Exchanger Assemble
168 Cylinder Head (RH), Valve Guide Measure Height
169 Crankshaft, Main Cap Bearing Install
170 Generator, Rotor Permanent Install
Magnet
171 Generator, Stator Permanent Install
Magnet
172 Generator, Bracket Install
173 10-May-21 Camshaft Install
174 Crankshaft Install
175 Cylinder Liner Install
176 Flywheel Housing Install
177 Indicator Panel Install
178 Piston As Assemble and Install
179 Benerator, Bearing, Lock Install
180 Tube As - Oil Jet Install
181 Junction Box, Bracket Install
182 11-May-21 Crankshaft Install
Page 16 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
183 Engine Oil Pan Prepare Installation positioning
184 Flywheel Install
185 Idle Gear Install
186 Timing Gear Install
187 Oil Transfer Pump Install
188 17-May-21 Actuator Install
189 Aftercooler Install
190 AVR Install
191 Cylinder Head Install
192 Fresh Water Pump Install
193 Fuel Injection Pump Install
194 Nozzle Install
195 Pulley Install
196 Valve Lifter Install
197 Vibration Damper Install
198 Engine - Generator Couple
199 Exhaust Manifold (RH) Install
200 Governor, Drive Timing Gear Install
201 18-May-21 Expansion Tank Install
202 Junction Box Install
203 Sea Water Pump Install
204 Turbocharger Install
205 Water Temperature Sensor Install
206 Engine Oil Filter Base Install
207 Engine Oil Lines Install
208 Exhaust Manifold (LH) Install
209 Turbocharger, Inlet Install
210 Contactor Sensor Install
211 19-May-21 Air Lines Install
212 Air Starting Unit Install
213 Fuel Lines Install
214 Heat Exchanger Install
215 Junction Box, Wiring Install
216 Water Lines Install
217 Turbocharger, Inlet Install
218 20-May-21 Air Filter, Housing Install
219 Air Starting System Install
220 Cylinder Head Valve Adjustment
221 Fresh Water Filling
222 Fuel Lines Install
223 Water Lines Check leakage occurred, OK
224 Heat Exchanger, Sea Water Install
System
225 Oil Pressure Indicator (Before Install
Filter)
226 Oil Pressure Indicator (After Filter) Install
227 Air Starting, Solenoid Install
228 21-May-21 Diesel Generator Unit Run Engine up to 1300 RPM, by following
Page 17 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
condition:
1) Leakage occurred on Hose As of Air
Starting System
2) Friction occurred between Rotor and
Permanent Magnet of Generator
3) Electrical system of Air Starting Unit
unable to operate (Recovered by manually
operation)
229 Engine Oil Filling
230 22-May-21 Diesel Generator Unit Manually Start Up
231 Generator, Stator Permanent Repair
Magnet
232 Heat Exchanger, Plug Repair
233 Fuel Injection Pump, Plug Repair
234 Actuator, Couple Start Up
Page 18 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
2) DG-2
Engine Data Generator Data
Model : Caterpilar 3412 Model : SR4B
Serial No. : 9BR01009 (12718 H) Serial No. : 4SJ01597
Arr No : 179-0778 Frequency : 60 HZ
SMU : 12718 H Power : 500 kW
Power : 719 BHP / 536 BkW Current : 820 A
High Idle : 1817 RPM Voltage : 440 V
No Date Parts Description
1 26-Feb-21 Engine Oil Take Sample
2 12-Apr-21 Diesel Generator Unit Perfrom Survey, Check Leakage Occurred
on DG 2 KRI SHS 990. Result:
Check from lower section of engine
visually, found leakage on cylinder liner no.
4.
3 Engine Oil Pan Remove
4 Expansion Tank, Fresh Water Filling
5 Generator, Coupling Remove
6 Sea Water System Remove
7 Engine Oil, Pipelines Remove
8 13-Apr-21 Cylinder Head, Cover Remove
9 Exhaust Manifold Remove
10 Fuel Lines Remove
11 Indicator Panel Remove
12 Injector Remove
13 Rocker Arm Remove
14 Water Lines Remove
15 Air Fiter Remove
16 Cylinder Head (RH) Remove
17 14-Apr-21 Air Filter Install
18 Air Starting Install
19 Diesel Generator Unit Run DG Unit
20 Engine Oil Filter Install
21 Engine Oil Pump Install
22 Fuel Lines Install
23 Generator, Coupling Connect
24 Indicator Panel Install
25 Rocker Arm Clean Up and Install
26 Sea Water Pump Install
27 Water Lines Install
28 Cylinder Head (RH) Remove, Clean Up, and Install
29 Piston As No. 4 Remove, Clean Up, and Install
30 Piston As No. 11 Remove, Clean Up, and Install
31 Piston As No. 12 Remove, Clean Up, and Install
32 Cylinder Liner No. 4 Remove, Clean Up, and Install
Page 19 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
33 Cylinder Liner No. 11 Remove, Clean Up, and Install
34 Cylinder Liner No. 12 Remove, Clean Up, and Install
35 15-Apr-21 Air Filter Install
36 Air Starting Install
37 Diesel Generator Unit Run DG Unit
38 Engine Oil Filter Install
39 Engine Oil Pump Install
40 Fue Lines Install
41 Fuel Lines Install
42 Generator, Coupling Connect
43 Indicator Panel Install
44 Rocker Arm Clean Up and Install
45 Sea Water Pump Install
46 Water Lines Install
47 Cylinder Head (RH) Remove, Clean Up, and Install
48 Piston As No. 4 Remove, Clean Up, and Install
49 Piston As No. 11 Remove, Clean Up, and Install
50 Piston As No. 12 Remove, Clean Up, and Install
51 Cylinder Liner No. 4 Remove, Clean Up, and Install
52 Cylinder Liner No. 11 Remove, Clean Up, and Install
53 Cylinder Liner No. 12 Remove, Clean Up, and Install
54 16-Apr-21 Oil Pressure Indicator, Hose As Install
55 18-May-21 Aftercooler Remove
56 Exhaust Manifold Remove
57 Fuel Lines Remove
58 Generator, Stator Exciter Remove
59 Intake Manifold Remove
60 Junction Box, Wiring Remove
61 Oil Cooler Remove
62 Rocker Arm Remove
63 Turbocharger Remove
64 Turbocharger Housing Remove
66 Water Lines Remove
67 Generator, Rotor Permanent Remove
Magnet
68 Generator, Stator Permanent Remove
Magnet
69 Heatsink Remove
70 19-May-21 AVR Remove
71 Camshaft Remove
72 Cylinder Head Remove
73 Engine Oil Pan Remove
74 Engine Oil Pump Remove
75 Expansion Tank Remove
76 Fuel Injection Pump Remove
77 Generator, Bearing Housing Remove
78 Generator, Rotor Exciter Remove
79 Piston As Remove
Page 20 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
80 Sea Water Pump Remove
81 Engine - Generator, Coupling Remove
82 Generator, Flange Remove
83 Generator, Fan Remove
84 Generator, Guard Remove
85 20-May-21 Crankshaft Remove
86 Generator, Rotor Remove
87 Piston As Remove
88 21-May-21 Accessories Clean Up
89 Cylinder Head Valve Remove and Clean Up
90 Cylinder Liner Remove
91 Generator, Bearing Remove
92 Cylinder Head Valve, Spring Remove
93 22-May-21 Accessories Clean Up
94 Crankshaft Clean Up
95 Cylinder Block Clean Up
96 Cylinder Head Clean Up
97 Cylinder Head Valve Clean Up
98 Cylinder Head Valve, Spring Clean Up
99 Nozzle Adapter (Chamber) Clean Up
Page 21 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
2. JOB DETAIL (KT JAYANEGARA 401) : CONTINUE
VESSEL DATA
Page 22 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) PROP-STBD
Propulsion Data Engine Data
Model : SRP 1515 FP Model : C280-6
Serial No. : SRP 119978 Serial No. : SCB00156
Build Year : 04 / 2016 Arr No : 297-2549
ID NO : 1212711 SMU :
Power : 1850 BkW @ 1000 RPM
High Idle : 1010 RPM
No Date Parts Description
1 3-May-21 Flange Base, Hole Cover Plate Remove
2 Flange Base, Hole Inner Surface Clean Up
3 Lifting Tools Preparation
4 4-May-21 Kort Nozzle Move and lift to dock, placed under flange
base
5 SRP Unit Move and lift to dock, placed under flange
base
6 5-May-21 SRP Unit Install, and welding bottom side of flange
base
7 SRP Unit, Mounting Fasteners Tightening (28 Pcs)
8 6-May-21 Kort Nozzle Lift and Install
9 Kort Nozzle, Fastener Install
10 SRP Mounting, Fastener Tightening
11 7-May-21 Propeller Install
12 Transmission Oil Filling
13 Kort Nozzle, Support, Fastener Tightening
14 8-May-21 Propeller Cap Tightening
15 Transmission Oil Fill New Oil
16 Kort Nozzle, Support, Fastener Tightening
17 9-May-21 Kort Nozzle, Support, Fastener Tightening
18 Propeller Cap, Fastener Tightening and Measure Clearance
betweed Propeller and Lower, Result: 7.5
mm
19 SRP Unit, Plate Welding
20 Kort Nozzle, Eye Plate Cut
21 Bottom Hull, Eye Plate Cut
22 10-May-21 Propeller Parts (Pisau) Install
23 Working Tools Return to Workshop
24 18-May-21 Coupling Clean Up and Positioning
25 Flange Base, Hole Cover Plate Cutting
26 Main Deck, Support Pillar Cutting (Remove)
27 Chain Block, 10 Tonnes Move to Main Deck
28 Steering Pump Clean Up and Positioning
29 19-May-21 Flange Base, Hole Cover Plate Cutting
Page 23 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
30 Coupling / Clutch Install
31 Steering Pump / Hydraulic Pump Install
32 Cross Joint / Cardan Shaft Install
33 Rudder Junction Box, Wiring Connect
34 Wiring, Bracket Install
35 20-May-21 Bulkhead Install
36 Oil Cooler Install
37 Sea Water System Flushing
38 Steering Pump / Hydraulic Pump Install
39 Cross Joint / Cardan Shaft Install
40 Wiring, Bracket Install
41 Cross Joint / Cardan Shaft, Guard Install
42 Pneumatic System, Air Lines Flushing
43 FFU, Solenoid Install
44 21-May-21 Wiring, Bracket Install
45 Planetary Gear, Hydraulic Oil Add
46 SCS, Wiring Check
Page 24 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
2) PROP-PORT
Propulsion Data Engine Data
Model : SRP 1515 FP Model : C280-6
Serial No. : SRP 119979 Serial No. : SCB00154
Build Year : 04 / 2016 Arr No : 297-2549
ID NO : 1212712 SMU :
Power : 1850 BkW @ 1000 RPM
High Idle : 1010 RPM
No Date Parts Description
1 7-May-21 Transmission Oil Drain
2 8-May-21 Transmission Oil Drain and Fill with New Oil
Page 25 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
3. JOB DETAIL (KRI AHP 355) : CONTINUE
VESSEL DATA
Page 26 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) MPK 1 / ME-SB
Engine Data Generator Data
Model : Caterpillar 3616 Model : REINTJES WGV 1000
Serial No. : 1PD00470 Serial No. : 70689
Arr No : 159-3616 / BTYLL Part List No. :
SMU : 14774 H Ratio : 6.04 / 1 (CCW)
Power : 7268 HP Oil Press : 280 / 300 psi
High Idle : 1010 RPM Oil Temp :
No Date Parts Description
1 18-May-21 Turbocharger Inlet Temperature Check. Result: Failure Condition
Sensor (RH) Recommendation: Replace Sensor
2 Turbocharger Outlet Temperature Check. Result: Failure Condition
Sensor (RH) Recommendation: Replace Sensor
3 Turbocharger Inlet Temperature Check. Result: Failure Condition
Sensor (LH) Recommendation: Replace Sensor
4 Turbocharger Outlet Temperature Check. Result: Failure Condition
Sensor (LH) Recommendation: Replace Sensor
5 Cylinder No. 11, Thermocouple Check. Result: Failure Condition
Sensor Recommendation: Replace Sensor
6 21-May-21 Air Filter Check. Result: Not Installed
7 Engine Unit Run Engine
8 Turbocharger, Inlet Check
9 Safety Device, Engine Overspeed Perform Simulation. Result: Engine
Shutdown at 670 RPM
Page 27 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
2) MPK 2 / ME-PS
Engine Data Generator Data
Model : Caterpillar 3616 Model : REINTJES WGV 1000
Serial No. : 1PD00472 Serial No. : 70689
Arr No : 159-3616 Part List No. :
SMU : 14715 H Ratio : 6.04 / 1 (CCW)
Power : 7268 HP Oil Press : 280 / 300 psi
High Idle : 1010 RPM Oil Temp :
No Date Parts Description
1 18-May-21 Air Starting, Valve Solenoid Check. Result: Manually operates while
cranking, Solenoid out of operation
Recommendation: Replace Valve Solenoid
2 Engine Oil Temperature Sensor Check. Result: Out of operation
Recommendation: Replace Engine Oil
Temp Sensor
3 Engine Unit Check. Result: Engine speed drop to 500
RPM and hold on that speed during
operation
4 Governor, Air Ratio Control Recommended to check
5 Prelube Pump Check. Result: Low Performance
Recommendation: Service the unit
6 Turbocharger Unit Recommended to check and ensure
condition of unit
7 Cylinder No. 8, Thermocouple Check. Result: Failure Condition
Sensor
8 Engine Speed Indicator (Engine Check. Result: Out of
Room) operationRecommendation: Replace
Engine Speed Indicator
9 Engine Speed Indicator (MCR) Check. Result: Out of operation
Recommendation: Replace Engine Speed
Indicator
10 Gearbox Check. Result: Forward, Neautral and
Reverse Indicator out of operation
11 Turbocharger Inlet Temperature Check. Result: Failure Condition
Sensor (RH)
12 Turbocharger Outlet Temperature Check. Result: Failure Condition
Sensor (RH)
13 Turbocharger Inlet Temperature Check. Result: Failure Condition
Sensor (LH)
14 Turbocharger Outlet Temperature Check. Result: Failure Condition
Sensor (LH)
15 Cylinder No. 1, Thermocouple Check. Result: Failure Condition
Sensor
16 21-May-21 Air Filter Check. Result: Not Installed
17 Engine Unit Run Engine up to 800 RPM, No Load
Page 28 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
18 Turbocharger, Inlet Check
Page 29 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
4. JOB DETAIL (KT KST 356) : CONTINUE
VESSEL DATA
Page 30 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) MPK 1 / ME-SB
Engine Data Generator Data
Model : Caterpillar 3612 Model : REINTJES
Serial No. : 9RC00374 Serial No. :
Arr No : NMHCJ Part List No. :
SMU : 19631 H Ratio :
Power : 5445 HP Oil Press :
High Idle : 1050 RPM Oil Temp :
No Date Parts Description
1 11-May-21 Batteries Check. Result: Low
2 Exhaust Manifold, Bellow As Check. Result: Leakage occurred
3 Governor, Sight Glass Check. Result: Found Leakage, Probably
caused by Leakage on Fuel Ratio Control
Membrane.
4 Oil Pressure Sensor Check. Result: Provide engine shutdown
at 27/04/21
5 Exhaust Manifold, Compensator Check. Result: Leakage occurred
(RH)
6 Exhaust Manifold, Compensator Check. Result: Leakage occurred
(LH)
7 Governor, Lever Check. Result: Can not moving, need
manually assist on operation during engine
cranks.
8 Governor, Linkage Check. Result: Normal movement
9 Fuel Ratio Control, Membrane Check. Result: Probably Leakage
Occurred, indicated by Condition of Sight
Glass
10 Prelube, Air Pressure Regulator Check. Result: Leakage occurred
11 Engine Oil Pump, Lines Check. Result: Leakage occurred
12 Safety Device for Crankcase Check. Result: Leakage occurred at ± 750
Pressure RPM
13 Heat Exchanger, Inlet Check. Result: Leakage occurred
14 Heat Exchanger, Outlet Check. Result: Leakage occurred
15 Heat Exchanger (JW), Inlet Check. Result: Leakage occurred
16 Heat Exchanger (JW), Outlet Check. Result: Leakage occurred
17 Heat Exchanger (Fuel), Inlet Check. Result: Leakage occurred
18 Heat Exchanger (Fuel), Outlet Check. Result: Leakage occurred
19 Heat Exchanger (Gearbox), Inlet Check. Result: Leakage occurred
20 Heat Exchanger (Gearbox), Outlet Check. Result: Leakage occurred
21 Cylinder No. 2, Fuel Lines Check. Result: Leakage occurred
22 Fuel, Manometer Check. Result: Broken Condition
23 Cylinder No. 12, Thermocouple Check. Result: Failure Condition
Sensor
Page 31 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
24 Cylinder No. 2, Thermocouple Check. Result: Failure Condition
Sensor
25 Turbocharger Turbine Inlet (RH), Check. Result: Failure Condition
Thermocouple Sensor
26 Turbocharger Turbine Outlet (RH), Check. Result: Alarm Occurred
Thermocouple Sensor
27 Turbocharger Turbine Outlet (LH), Check. Result: Failure Condition
Thermocouple Sensor
28 17-May-21 Engine Unit Run Engine
29 Exhaust Manifold, Compensator Check Leakage Occurred as Reported, by
(RH) following steps:
1) Remove Glasswool Cover (Right and
Left Bank)
2) Found Leakage on Gasket Position.
Recommendation:
Replace Gasket and Bolts of Exhaust
Adapter, Exhaust Reducer and Exhaust
Flexible.
30 Exhaust Manifold, Compensator Check Leakage Occurred as Reported, by
(LH) following steps:
1) Remove Glasswool Cover (Right and
Left Bank)
2) Found Leakage on Gasket Position.
Recommendation:
Replace Gasket and Bolts of Exhaust
Adapter, Exhaust Reducer and Exhaust
Flexible.
31 18-May-21 Oil Lines Disassemble and Check. Result: Found
worn seal. Also found worn seal of housing
position
32 Sea Water System Estimate material needs to perform repair
33 Exhaust Manifold, Compensator, Estimate material needs to perform repair
Gasket
34 21-May-21 Exhaust Funnel, Bracket Adjust and Install
35 22-May-21 Crankshaft Turning, find top position 1
36 Fuel Injector Set timing
37 Valve Mechanism, Cover Remove
38 Fuel Rack Synchronization
Page 32 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
1) MPK 2 / ME-PS
Engine Data Generator Data
Model : Caterpillar 3612 Model : REINTJES
Serial No. : 9RC00375 Serial No. :
Arr No : NMHCK Part List No. :
SMU : 19725 H Ratio :
Power : 5445 HP Oil Press :
High Idle : 1050 RPM Oil Temp :
No Date Parts Description
1 11-May-21 Batteries Check. Result: Low Voltage Alarm Oftenly
Occurred, Batteries Lifetime 3 Years.
2 Cylinder No. 2 Check. Result: Operating Temperature
Lower than other Cylinder
3 Engine Oil Temperature Sensor Check. Result: Fluctuative Reading Value
4 Exhaust Manifold, Bellow As Check. Result: Leakage Found
5 Governor, Sight Glass Check. Result: Found Leakage, Probably
caused by Leakage on Fuel Ratio Control
Membrane.
6 Water Temperature Regulator, Check. Result: Leakage Found
Housing
7 Fuel Ratio Control, Membrane Check. Result: Probably Leakage
Occurred, indicated by Condition of Sight
Glass
8 Prelube, Air Pressure Regulator Check. Result: Leakage Found
9 Safety Device for Crankcase Check. Result: Leakage occurred at ± 750
Pressure RPM
10 Cylinder Head No. 1, Spacer Plate Check. Result: Leakage Found
11 Cylinder No. 8, Thermocouple Check. Result: Failure Condition
Sensor
12 Cylinder No. 9, Thermocouple Check. Result: Failure Condition
Sensor
13 Turbocharger Turbine Outlet (LH) Check. Result: High Temperature Alarm
Occurred
14 AC/OC, Inlet Temperature Check. Result: High Temperature Alarm
Occurred
15 Exhaust Gas Check. Result: Thin Black Color
16 18-May-21 Sea Water System Estimate material needs to perform repair
17 20-May-21 Crankshaft Turning, find top position 1 and 2
18 Cylinder Head Valve Adjustment at top position 1 and 2
19 Engine Unit Prelube
20 Fuel Injector Set Timing, at top position 1 and 2
21 Fuel Rack Synchronization
22 21-May-21 Crankcase Breather Install
23 Cylinder Head Valve Adjustment
24 Injector, Valve Spring Check Visually
Page 33 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
25 Intake Valve, Spring Check Visually
26 Exhaust Valve, Spring Check Visually
27 Cylinder Head Valve, Cover Install
Page 34 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
5. JOB DETAIL (KT SUBALI II) : FINISHED
VESSEL DATA
Page 35 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) PROP-PORT
Propulsion Data Engine Data
Model : SRP 330 Model : Caterpillar C18
Serial No. : SRP 117831 Serial No. : T2P1729
Build Year : 02.2012 Arr No : 3209800
ID NO : 1186040 BB SMU : 23882 H
Power : 600 BHP @ 1800 RPM
High Idle : 1800 RPM
Page 36 of 42
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
No Parts Job Desc
VESSEL DATA
Page 37 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
JOB PROGRESS RECORD
1) MPK 1 / ME-SB
Engine Data Generator Data
Model : Caterpillar 3616 Model : REINTJES WGV 1000
Serial No. : 1PD00481 Serial No. : 70693
Arr No : BVXWW Part List No. :
SMU : Ratio : 6.040 / 1
Power : 7268 HP Oil Press :
High Idle : 1010 RPM Oil Temp :
2) MPK 2 / ME-PS
Engine Data Gearbox Data
Model : Caterpillar 3616 Model : REINTJES WGV 1000
Serial No. : 1PD00479 Serial No. : 70694
Arr No : BVXWT Part List No. :
SMU : Ratio : 6.040 / 1
Power : 7268 HP Oil Press :
High Idle : 1010 RPM Oil Temp :
Page 38 of 42
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
25-Feb-21
26-Feb-21
27-Feb-21
28-Feb-21
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
517
517
516
515
514
513
512
511
510
509
Engine Unit
Engine Unit
Governor - Kobelt
Governor - Kobelt
Parts
Deg C)
(Bridge)
(Bridge)
Remove
Adjustment
Adjustment
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
25-Feb-21
26-Feb-21
27-Feb-21
28-Feb-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
4-May-21
5-May-21
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
7. JOB DETAIL (KRI KPL 981) : FINISHED
VESSEL DATA
Active Days on
NO Name Division
This Project
1 Ahmad Rezaldi ENGINE DIVISION 1
2 Elu Susanto ENGINE DIVISION 34
3 Fajar Setyawan ELECTRICAL DIVISION 19
4 Fiki Untung Saputra ELECTRICAL DIVISION 2
5 Idham Gholili ELECTRICAL DIVISION 34
6 Mustajab WELDER DIVISION 2
7 Riwan Muhtar Findi ELECTRICAL DIVISION 5
8 Rizqi Ramadhani ENGINE DIVISION 43
9 Sawal ENGINE DIVISION 1
10 Sindhu Kusuma Putra WELDER DIVISION 4
11 Widiyanto ENGINE DIVISION 17
12 Wisnu Eko Saputro GEARBOX DIVISION 2
13 Yohanes Suyanak ENGINE DIVISION 42
14 Senen (KD-Electrical) ELECTRICAL DIVISION 2
15 Vindi Kurniawan (WKD-Electrical) ELECTRICAL DIVISION 32
16 Ahmad Khomar (WKD-Engine) ENGINE DIVISION 2
17 Erlambang Widyasmoro (SPV-Electrical) ELECTRICAL DIVISION 8
Page 39 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
UNIT DATA RECORD
1) DG-2
Engine Data Generator Data
Model : MTU 12V183 Model : NKT 550-4
Serial No. : 444.901-502-019684 Serial No. : 1444977 / 1996
Arr No : OM 444 LA Frequency : 50 hz
SMU : 11627 H Power : 524 kVA
Power : 455 kW Current : 756 A
High Idle : 1500 RPM Voltage : 400 - 231 V
Page 40 of 42
10-Mar-21
11-Mar-21
12-Mar-21
13-Mar-21
14-Mar-21
15-Mar-21
16-Mar-21
17-Mar-21
18-Mar-21
19-Mar-21
20-Mar-21
21-Mar-21
22-Mar-21
23-Mar-21
24-Mar-21
25-Mar-21
26-Mar-21
27-Mar-21
28-Mar-21
29-Mar-21
30-Mar-21
31-Mar-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
15-Apr-21
16-Apr-21
17-Apr-21
18-Apr-21
19-Apr-21
20-Apr-21
21-Apr-21
22-Apr-21
23-Apr-21
24-Apr-21
25-Apr-21
26-Apr-21
27-Apr-21
28-Apr-21
29-Apr-21
30-Apr-21
1-May-21
2-May-21
3-May-21
1-Mar-21
2-Mar-21
3-Mar-21
4-Mar-21
5-Mar-21
6-Mar-21
7-Mar-21
8-Mar-21
9-Mar-21
1-Apr-21
2-Apr-21
3-Apr-21
4-Apr-21
5-Apr-21
6-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
No Parts Job Desc
VESSEL DATA
Notes:
Surat Tugas, not available for the following work dates:
1) 22-Jan-21
2) 25-Jan-21
3) 26-Jan-21
4) 27-Jan-21
5) 28-Jan-21
6) 29-Jan-21
7) 30-Jan-21
Total: 7 Days
Page 41 of 42
Daily Project Progress Report
Update: 22-May-21
TM Surabaya
UNIT DATA RECORD
1) AE DG-1
Engine Data Generator Data
Model : Caterpillar C18 Model : SR4B
Serial No. : GPS00693 Serial No. : 5NJ01605
Arr No : 342-6543 Frequency : 50 hz
SMU : 35481 H Power : 450 kW
Power : 660 BHP Current : 782 A
High Idle : 1500 RPM Voltage : 415 V
2) AE DG-2
Engine Data Generator Data
Model : Caterpillar C18 Model : SR4B
Serial No. : GPS00699 Serial No. : 5NJ01605
Arr No : 342-6543 Frequency : 50 hz
SMU : 35481 H Power : 450 kW
Power : 660 BHP Current : 782 A
High Idle : 1500 RPM Voltage : 415 V
3) FIFI-1 PS
Engine Data Pump Data
Model : Caterpillar 3516 Model : 06 - 01206
Serial No. : TTH00386 Serial No. : 290GTB13A
Arr No : 282-9668
SMU :
Power : 1920 kW
High Idle : 1730 RPM
4) FIFI-2 SB
Engine Data Pump Data
Model : Caterpillar 3516 Model : 06 - 01206
Serial No. : TTH00386 Serial No. : 290GTB13A
Arr No : 282-9668
SMU :
Power : 1920 kW
High Idle : 1730 RPM
Page 42 of 42
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
22-Jan-21
23-Jan-21
24-Jan-21
25-Jan-21
26-Jan-21
27-Jan-21
28-Jan-21
29-Jan-21
30-Jan-21
31-Jan-21
1-Feb-21
2-Feb-21
3-Feb-21
4-Feb-21
5-Feb-21
6-Feb-21
7-Feb-21
8-Feb-21
9-Feb-21
No Parts Job Desc
Units: mm
206 Chockfast, Dam Make
207 Chockfast, Dam Make
Perform Alignment, Result:
Radial
0; 0; -0.12; -0.10
Axial
0; 0.07; -0.07; -0.09
208 Shafting Max = 0.50
Units: mm
Max: 0.50
Units: mm
231 Sea Water Strainer Clean up
232 Chockfast Preparation and perform casting
Perform Alignment (Before
Chockfast), Result:
Axial
0; -0.05; -0.19; 0.05
233 Shafting Radial
0; 0.05; -0.05; -0.15
Max: 0.50
Units: mm
234 Gearbox, Oil Pump Install
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
22-Jan-21
23-Jan-21
24-Jan-21
25-Jan-21
26-Jan-21
27-Jan-21
28-Jan-21
29-Jan-21
30-Jan-21
31-Jan-21
1-Feb-21
2-Feb-21
3-Feb-21
4-Feb-21
5-Feb-21
6-Feb-21
7-Feb-21
8-Feb-21
9-Feb-21
No Parts Job Desc
Max: 0.50
Units: mm
236 Mounting, Fastener Tightening
237 Input Pipelines, Fastener Tightening
238 Output Pipellines, Fastener Tightening
239 Coupling Install
240 Mounting, Fastener Tightening
241 Input Pipelines, Fastener Tightening
242 Output Pipellines, Fastener Tightening
Remove and Install (Due to
243 Crankshaft Clearance Measurement of Main
Cap Bearing)
Measure Clearance and Install
244 Main Cap Bearing
New Parts
245 Connecting Rod, Bearing Install
246 Piston Ring Install
247 Piston As Install
248 Rubber Coupling Install
249 Rubber Coupling, Cover Install
250 Clutch Control, Wire Connect
251 Rubber Coupling, Cover Install
252 Clutch Control Connect
253 Flywheel Housing Install
254 Crankhaft, Seal (Front) Install
255 Crankshaft, Seal (Rear) Install
256 Flywheel Install
257 Front Housing Install
258 Fuel Transfer Pump Install
259 Oil Pan Clean Up
260 Idle Gear Install
261 Fresh Water Pump Install
262 Engine - Generator Couple
263 Mounting, Front Install
264 Engine Oil Pump Install
265 Engine Oil Pan Install
266 Vibration Damper Install
267 Cylinder Head Install
268 Oil Filter Base Install
269 Oil Cooler Install
270 Exhaust Manifold Install
271 Aftercooler, Housing Install
272 Injector Install and Adjustment
273 Rocker Arm Install
274 Camshaft Install
275 Valve Mechanism Adjustment
276 Turbocharger Install
277 Turbocharger, Housing Install
278 Aftercooler Install
279 Intake Manifold Install
280 Starting Motor Install
281 ECM Install
282 Wiring Harness Install
283 Generator, Mesh Install
284 Heat Exchanger, Housing Install
285 Heat Exchanger, Plate Clean Up
286 Heat Exchanger, Seal Install
287 Air Filter Install
288 Fuel Filter Base Install
289 Heat Exchanger, Plate Clean Up
290 Heat Exchanger, Seal Install
291 Fresh Water Filling
292 Heat Exchanger Check leakage occurred, OK
293 Alternator Install
294 Vee Belt Install
295 Aftercooler, Pipelines Install
296 Fuel Filter Install
10-Feb-21
11-Feb-21
12-Feb-21
13-Feb-21
14-Feb-21
15-Feb-21
16-Feb-21
17-Feb-21
18-Feb-21
19-Feb-21
20-Feb-21
21-Feb-21
22-Feb-21
23-Feb-21
24-Feb-21
22-Jan-21
23-Jan-21
24-Jan-21
25-Jan-21
26-Jan-21
27-Jan-21
28-Jan-21
29-Jan-21
30-Jan-21
31-Jan-21
1-Feb-21
2-Feb-21
3-Feb-21
4-Feb-21
5-Feb-21
6-Feb-21
7-Feb-21
8-Feb-21
9-Feb-21
No Parts Job Desc