CONTENTS
Introduction 1
Intention 2
Organisational setup 3
Exhibits
Boiler Log 10
Repair Log 11
Boiler Monitoring System Form 12
Record of Revisions 14
2
INTRODUCTION
3
INTENTION
Due to the wide variety , types and makes of equipments used the
guide should be supplemented with manufacturers recommendations
concerning the maintenance and care of of the system.
4
ORGANISATIONAL SETUP AND
CHAIN OF RESPONSIBILITIES
ENGINEERING MANAGER
RESPONSIBLE FOR
IMPLEMENTATION
OF PM PROGRAM
MAINTENANCE SUPERVISOR
5
REPAIR PROGRESSION
OPERATER REVIEW
PM OUTLINE
NOTIFY MAINTENANCE
SUPERVISOR
IF PROBLEM NO
DISCOVERED
YES MAINTENANCE
SUPERVISOR REVIEW
NO OPERATER REPAIR
IS
MAINTENANCE
QUALIFIED FOR
YES THE JOB
ENTER
STATUS IN
LOG BOOK ENTER SOLUTION
IN REPAIR LOG
NO
IS PROBLEM A
SYSTEM
MODIFICATION
ENGINEERING
YES
REVIEW (PE)
MAINTENANC
E SUPERVISOR
REVIEW
NO
IS
ENGINEERING
YES QUALIFIED TO
DO JOB
HIRE A QUALIFIED
CONTRACTOR
NOTIFY
NO
INSPECTION
HIRE CONSULTANT
AGENCI IF
IF NECESSARY
REQUIRED
6
DAILY CHECK LIST
Note: The above check list should also refer to specific written procedures. In all cases the
equipment manufacturers recommendation should be followed. This check off list uses
ASME section VI and ASME CSD-1 for its specific written instructions.
7
WEEKLY CHECKLIST
Note: The above check list should also refer to specific written procedures. In all cases the
equipment manufacturers recommendation should be followed. This check off list uses
ASME section VI and ASME CSD-1 for its specific written instructions
8
MONTHLY CHECKLIST
Note: The above check list should also refer to specific written procedures. In all cases the
equipment manufacturers recommendation should be followed. This check off list uses
ASME section VI and ASME CSD-1 for its specific written instructions
9
SIX MONTHLY CHECKLIST
Note: The above check list should also refer to specific written procedures. In all cases the
equipment manufacturers recommendation should be followed. This check off list uses
ASME section VI and ASME CSD-1 for its specific written instructions
10
ANNUAL CHECKLIST
Note: The above check list should also refer to specific written procedures. In all cases the
equipment manufacturers recommendation should be followed. This check off list uses
ASME section VI and ASME CSD-1 for its specific written instructions
11
BOILER LOG
MAINTENANCE TESTING AND INSPECTION LOG
BOILER NO. MONTH
PRESSURE RATING YEAR
CAPACITY FUEL USED
PERSON TO NOTIFY IN AN EMERGENCY
EMERGENCY TEL. NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2
9
OBSERVE
WATER LVL.
RECORD
PRESSURE
RECORD FUEL GAS
TEMP.
DAILY CHKS.
SEMI ANNAUL
ANNUAL CHECKS
CHECKS
GENERAL COMMENTS AND SPECIAL OBSERVATIONS
12
MECHANICAL /ELECTRICAL REPAIR LOG
13
BOILER MONITORING SYSTEM
14
RECORD OF REVISIONS
15
16