‘COMMENT. COMPLIANCE STATEMENT REV
‘CONSULTANT COMMENTS
\WALLTECH RESPONSE
|i cacultion shal te submited wits cordinted
lupdate shop dravings to reflect changes prevent
jection of submission duet incomplete informatio.
lreeably feloning load path.
[al commen mentioned herein shal be applicable
‘sila cendisone
[Any effects of such comments onthe stress and
oading calculations tall be cai through the
tected toad path in ealculation process.
Outcome of enginecrng verifications such a steel,
profi sizes, se-out nzerialength shall be
coordinated and presented in drawing
loodeting Se wil notte reviewed. Fajade conzactor
stall esure input an ouspat be cel represented oa
[sialon submission.
[wre actions and forces are called out, refermce
[pages reo be incited.
[peas try why stick system and gas calalton
have not ben included in this report. Provide updated
sick system calculation addressing comments rom
previous revisions.
[All cletstions sal be provided in logical sequence}
Gener! Comens ee Noted
[FT As por approves catcuaton in Rev OmaTione
Jace hanged from top bracket However as per up-
lated shop drawings and ste candeion mulions are
staked at bttom bracket At door location end mul
lions are stacked but mulion on doors
franged wich wit lead excassve load on ransom
Jabove door due to buling movements. Hence mul-
lion above door shall be released in dead lad and
ransom shall be verifed for longer span above
[door
[Comments we resouon for Stick Curtin wall
|Calculcion already provided in revision 1 and its
lpproved, Refer aached document Revision
submission was only fr the commen of perortod
[panes
[All calculations shal be eubmited with cordinated
updated shop drawings o reflect changeso prevent
‘eton of eabmission det incomplete information,
[Revised deal tached
de legible delals Aso en
re
ected in shop drawings.
a changes willbe re-
Please cnity why supports are provided at his
location
Stand model revised by eng perforations and
‘lamin abe sears of 25 3 SHS with moment of|
Inertia stacked Sel.veight and Full wind load spied
[Revised analysis atached.
Revise perforation pattern hall be created in mode
"Noted, Refer comment 3
Please carity how fixing llows thermal expansion of
stun panel
‘Panels re fixed betvoen mulion and transom smi
class panel fixation sing gskcted pressure plate
fixation. Exposed thermal expaion for the panel i
1.9R6nen. Expansion Provision provide fe mm.
Please provide refrence snapshots fr applied load
|Soapsot taced for le epi ious. Retr page
nero[why 0.4 factor have bee considered?
the pecvious Stand analysis was dose fo the complete
pana without ay porfraions. So the salsis
considering te actual Site elent plates with plate
weght wil be ample To aan the aera condition,
perforation wight reduced and given a slf weight
reductive factor of 06, The Stand model erevised with
exfrations hence self weight factor of 1 00s given,
iu
tease create pecoration in mode! and aply fll oad
lo verity sities of pane dw prfrtion pater
Stand mode! revised by adding preations and
sominiam ike stifenreof25 3 SHS with moment of
nerin ached Selfveigh and Full wind loud applied.
Seengh and serviveabilyveriSction stached.
fl
tease incude the moment of inet ofthe stiffer in
afuminium tbe tifeners of25x3SHS i rested othe
‘Stand mode. Moment of inertia ofthe siflener inthe
{modal property is tached io the Page No: 8
u
|provice veritcation of al connecon. Also provide
|vrifcaton of eacing end iteaer.
\Penel and stifener-
Pane sn the stiffeners ae bonded together by suctral|
(bonding estant
‘Stftensr Verifcation-
etd fer suength and serviceability.
Suteners to vera frame =
Steers and veial perimeter fumes ae joined
together with 5.518 serews at both ends, whichis
eid and stached.
ststener we]
Fe
2
Joc mode with pnet
incorrect o model steer seperately, Sifener should
Steers are modeled along withthe perforated panel
and verified for sengh nd servicsbty.
ite
|The ends offence shal be connected wo the end
sme to atch the calculation asamption
supers are connoced to the perimeter fame with 5.5
[ameter screws a both ends. Verification fire screws
atached fe review:STRUCTURAL CALCULATION
SOP-8.5-F3, REV 0, 10/09/2015
MANGROVE ROTANA RESORT
wie
po PEVORATED PANEL FORBALL ROOMNOOF SCREEN
| erety [A Goptamer
INTRODUCTION
‘This chapter includes analysis and design of perforated panel & stiffener verification for ball room
roof screen. Panel is modelled as plate elements as in figure.
‘The panel is 1500mm width and 300mm height. Stiffeners are provided at every 500mm.
SA
H tenn
sde—ramemy |
Fig5:1 Stand Model nottom—pxeyee_|
aa Mee ew este: EOE at
Joy} Node 2: 0.903 peta cba leosly y): LIFDOOI matt
ay) = = comms
jn | weds: Gai, Steartran Yn): OAS gage
Zi Materot Show AmainZ 0); C0515 watz
cu >]
Page 8 of 19STRUCTURAL CALCULATION
SOP-8.5-F3, REV 0, 10/09/2015
4G Waltech
‘Project Name | MANGROVE ROTANA RESORT Ret.No. | SC-W120.193.07
Project No. | WI20-193
‘STICK CURTAIN WALL SYSTEM PODIUM LEVEL &
‘eam PERFORATED PANEL FOR BALL ROOM ROOF SCREEN
Prepared By | Arya Gopakumer
3. cheek
Stiffeners are connected to the perimeter frame by 5.Sscrews at each end.
Length x Effective Width x Thickness x density
Dead load on screw =
1.2DL =
Wind load on screw =
1.2WL =
‘Number of screws
Dead Load
‘Shear Load
1.5m x 0.5m x 3mm x 2.72
0.61KN
0.73KN
Length x Effective Width x Wind Load
1.5m x 0.5m x 2kN/m2
1.5kN
1.8KN
2
0.36kN
0.90KN
[Repeated comment #71 Please provide verification of all
lconnections. Also provide verification of
|connection between cladding and stiffener.
}1.Comment has partially addressed. Verification of sealant
lbond between stiffener and cladding have not been veri-
ied,
Conclusion: Provide 5.5mm serews at both ends
Page 14 of 19