You are on page 1of 8

Site Modernization Report of

U3088DAWUSASO_HT_GU
Huawei Technologies Co., Ltd.
MAY 09, 2021

All rights reserved

1
Document Control

1. Revision History
Revision
Date Name Revision
Number
V1.0

2. Reviewers
Reviewer Date Feedback

2
Content

1 BASIC PARAMETERS............................................................................................................................ 2
1.1 SITE INFORMATION...............................................................................................................................2
2 SITE CHECKLIST.................................................................................................................................... 2
3 THE ANALYSIS ON DT........................................................................................................................... 2
3.1 PSC DISTRIBUTION..............................................................................................................................2
3.2 EC / IO DISTRIBUTION.........................................................................................................................2
3.3 RSCP DISTRIBUTION............................................................................................................................2
4 DATA SERVICE TEST............................................................................................................................. 2
4.1 THROUGHPUT CELL 1................................................................................................................................2
4.2 THROUGHPUT CELL 2................................................................................................................................2
4.3 THROUGHPUT CELL 3................................................................................................................................2
5 ACTIONS.............................................................................................................................................. 2
6 SUMMARY.......................................................................................................................................... 2
APPENDIX THE CONTACT ENGINEERS............................................................................................................ 2
1 BASIC PARAMETERS

1.1 SITE INFORMATION

Market MTN U2100 RANMOD


Site Name U3088DAWUSASO_HT_GU
Latitude / Longitude 6.34863/-2.03099
General Location ASHANTI REGION
Date 09/05/2021
BTS Type OUTDOOR
Carrier U2100

1.2 ANTENNA INFORMATION

Antenna
Cell ID Antenna type M tilt E Tilt Azimuth
Height
30887 OCTABAND 2 RET 120 54

30888 OCTABAND 0 RET 190 54

30889 OCTABAND 2 RET 260 54

2 SITE CHECKLIST
No. Activity/Process Cell 1 Cell 2 Cell 3 Result
UL DL UL DL UL DL
Uplink Frequency /
1 1972.40 2162.40 1972.40 2162.40 1972.40 2162.40 ok
Downlink Frequency
Scrambling Code
2 381 ok 382 Ok 383 Ok ok
correctly defined
Idle

The LAC is correctly


3 613 ok 613 Ok 613 Ok ok
defined
The RAC is correctly
4 11 ok 11 Ok 11 Ok ok
defined
Max CPICH_RSCP > -85
6 >-85 ok >-85 Ok >-85 Ok ok
dBm near site
Max CPICH_EcIo > -8 dB
7 >-8 ok >-8 Ok >-8 Ok ok
near site
Connection

Terminating calls and


8 mobile originating calls ok Ok Ok ok
for voice checked
The voice service quality
9 is good by the engineer ok Ok Ok ok
feeling
Latency 10 Latency test ok Ok Ok ok
PS data service ok Ok Ok ok
PS 11
successful in each cell
No. Activity/Process Cell 1 Cell 2 Cell 3 Result
(R99)
12 HSDPA ok Ok ok ok
3G Softer-handover is
13 ok Ok ok ok
checked
Handover
Inter-RAT Handover is
14 ok Ok ok ok
checked

2 THE ANALYSIS ON DT
3.1 PSC DISTRIBUTION

Before Modernization After Modernization


3.2 EC / IO DISTRIBUTION

Before Modernization After Modernization

3.3 RSCP DISTRIBUTION

Before Modernization After Modernization


3 DATA SERVICE TEST
3.1 Throughput Cell 1
DL

3.2 Throughput Cell 2


DL
3.3 Throughput Cell 3
DL

Actions
No action was taken.

4 Summary

The site’s basic functionalities are working fine and stable as verified by site survey and Drive test. The
performance of the site is OK and the township is well covered.

Approved Approved

Appendix the contact engineers

Task Name E-mail Telephone


DT Haruna harubala291@gmail.com 0244737306

You might also like