Site Modernization Report of

U0352ATONSU_ET
Huawei Technologies Co., Ltd.
January 21, 2021

All rights reserved

1
Document Control

1. Revision History
Revision
Date Name Revision
Number
V1.0

2. Reviewers
Reviewer Date Feedback

2
Content

1 BASIC PARAMETERS............................................................................................................................ 2
1.1 SITE INFORMATION...............................................................................................................................2
2 SITE CHECKLIST.................................................................................................................................... 2
3 THE ANALYSIS ON DT........................................................................................................................... 2
3.1 PSC DISTRIBUTION..............................................................................................................................2
3.2 EC / IO DISTRIBUTION.........................................................................................................................2
3.3 RSCP DISTRIBUTION............................................................................................................................2
4 DATA SERVICE TEST............................................................................................................................. 2
4.1 THROUGHPUT CELL 1................................................................................................................................2
4.2 THROUGHPUT CELL 2................................................................................................................................2
4.3 THROUGHPUT CELL 3................................................................................................................................2
5 ACTIONS.............................................................................................................................................. 2
6 SUMMARY.......................................................................................................................................... 2
APPENDIX THE CONTACT ENGINEERS............................................................................................................ 2
1 BASIC PARAMETERS

1.1 SITE INFORMATION

Market MTN U2100 RANMOD


Site Name U0352ATONSU_ET
Latitude / Longitude 6.69706 /-1.57949
General Location ASHANTI REGION
Date 21/01/2021
BTS Type OUTDOOR
Carrier U2100

1.2 ANTENNA INFORMATION

Antenna
Cell ID Antenna type M tilt E Tilt Azimuth
Height
03527 OCTABAND RET

03528 OCTABAND RET

03529 OCTABAND RET

2 SITE CHECKLIST
No. Activity/Process Cell 1 Cell 2 Cell 3 Result
UL DL UL DL UL DL
Uplink Frequency /
1 1972.40 2162.40 1972.40 2162.40 1972.40 2162.40 ok
Downlink Frequency
Scrambling Code
2 190 ok 191 ok 192 ok ok
correctly defined
Idle

The LAC is correctly


3 804 ok 804 ok 804 ok ok
defined
The RAC is correctly
4 13 ok 13 ok 13 ok ok
defined
Max CPICH_RSCP > -85
6 >-85 ok >-85 ok >-85 ok ok
dBm near site
Max CPICH_EcIo > -8 dB
7 >-8 ok >-8 ok >-8 ok ok
near site
Connection

Terminating calls and


8 mobile originating calls ok ok ok ok
for voice checked
The voice service quality
9 is good by the engineer ok ok ok ok
feeling
Latency 10 Latency test ok ok ok ok
PS data service ok ok ok ok
PS 11
successful in each cell
No. Activity/Process Cell 1 Cell 2 Cell 3 Result
(R99)
12 HSDPA ok ok ok ok
3G Softer-handover is
13 ok ok ok ok
checked
Handover
Inter-RAT Handover is
14 ok ok ok ok
checked

2 THE ANALYSIS ON DT
3.1 PSC DISTRIBUTION
Before Modernization After Modernization
3.2 EC / IO DISTRIBUTION

Before Modernization After Modernization

3.3 RSCP DISTRIBUTION


Before Modernization After Modernization
3 DATA SERVICE TEST

3.1 Throughput Cell 1

3.2 Throughput Cell 2


3.3 Throughput Cell 3

4 Actions

No action was taken.

5 Summary

The site’s basic functionalities are working fine and stable as verified by site survey and Drive test. The
performance of the site is OK and the township is well covered.