Professional Documents
Culture Documents
Environmental Department
FMIPA UNS
2021
Wind Turbines (that work)
• Proximity of turbines
• Orientation w.r.t.
prevaling winds
• Ignoring local
topography
•…
hS = 10 hrs.
Wind farm: (at PC)
PWF = 2 PT (4000 MW) Eo/Ei = 1.30
Spacing = 50 D2
vrated = 1.4 vavg Underground storage Transmission:
PT = 2000 MW
Optimization To Date
Turbine blade design
Huge literature
Generators
Already near optimal
Wind farm layout
Mostly offshore
Integer programming
Topography
Multi-site new
+ Transmission challenge
+ Storage
Need Wind Data
Prevalent Direction, Speed, seasonality
Measurement tower position & duration
optimization too…
US Investment in Wind Power
2008 Investment: $16.4B (private + public)
Total since 1980: $45+B
Estimate for 2009-2018: $300B-$700B
Optimization can have a huge impact