SEE COMMENT

APPROVED THE APPROVED OR THE


APPROVED AS CORR. CORRECTIONS/COMMENTS THIS DOCUMENT HAS NO APPROVAL FROM PROJECT OWNER (ARHC) AND JACMI
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

55mmx69mm
A B B' C D E E' F G H J J' K L M N P P' Q R

1,890
1,020
GFCI
2 ELPGA-9

1,000
GFCI
ELPGA-10 ELPG4-4

2,300
3,800

2,700
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)
ELPG4-5

3,000
1,400

1,980
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL) GFCI

3,235

3,100
2,135

2,130

2,100
TO LIGHTS

1,560
2,100
3
GFCI
TO ELEVATOR SHAFT TO ELEVATOR SHAFT TO ELEVATOR SHAFT TO ELEVATOR SHAFT
TO LIGHTS
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)

TO ELEVATOR SHAFT EPP2-7

740
LIGHTING CKT. (TYPICAL)
6 TO ELEVATOR SHAFT
540

TO ELEVATOR SHAFT
TO ELEVATOR SHAFT

1,800
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)

2,750
LIGHTING CKT. (TYPICAL)

3,050
TO ELEVATOR SHAFT
2,990

130 20
ELPG2-9 LIGHTING CKT. (TYPICAL) TO ELEVATOR SHAFT ELPG3-7
1,300 LIGHTING CKT. (TYPICAL)
ELPG2-6 630
2,300

ELPG3-8
GFCI 1,050 2,360
7
2,160

1,300
1,400 ELPG2-27 1,230 ELPG3A-6

APPROVED THE APPROVED OR THE


APPROVED AS CORR. CORRECTIONS/COMMENTS
1,330
NOTED
INDICATED HEREIN DOES
PPT2-8 NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
8 DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

SPECIFICATIONS.
970 380
BY: Edwin Francis Cruz
9

DATE: 15 JUN 2021


S T U U' V W X X' Y Z AA AA' AB AC AD AD' AE AF AG AH AJ

55mmx69mm

(BASEMENT FLOOR LVL.)


LEGEND/S:
1 POWER SETTING OUT EMBEDDED TO SLAB
SCALE NTS

PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
1
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
A B B' C D E E' F G

GFCI
2 ELPGA-9
ELPGA-10

3,800

1,980
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)

3,235
2,135

2,130
3
TO ELEVATOR SHAFT TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)
APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

15 JUN 2021
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

DATE:

55mmx69mm

(BASEMENT FLOOR LVL. TOWER 1)

LEGEND/S:
1 ENLARGED FLOOR PLAN
SCALE NTS

PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
2
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
4

TO ELEVATOR SHAFT EPP2-7


6
LIGHTING CKT. (TYPICAL)

540
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)

EPP2-9
TO ELEVATOR SHAFT

2,990
130 ELPG2-9 LIGHTING CKT. (TYPICAL)
1,300
ELPG2-6

2,300
GFCI
7
1,400 ELPG2-27 2,160 1,230
APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.

1,330 BY: Edwin Francis Cruz

DATE: 15 JUN 2021


PPT2-8

55mmx69mm
8
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

970 380

S T U U' V W X X' Y

LEGEND/S:
(BASEMENT FLOOR LVL. TOWER 2)
1 ENLARGED FLOOR PLAN
SCALE NTS

PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
3
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
4

740
6 TO ELEVATOR SHAFT
TO ELEVATOR SHAFT

1,800
LIGHTING CKT. (TYPICAL)

2,750
LIGHTING CKT. (TYPICAL)

3,050
20
TO ELEVATOR SHAFT ELPG3-7
LIGHTING CKT. (TYPICAL)
630
ELPG3-8
1,050 2,360
7

1,300
ELPG3A-6

9
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

Z AA AA' AB AC AD AD' AE AF AG AH AJ
(BASEMENT FLOOR LVL. TOWER 3)
1 ENLARGED FLOOR PLAN
APPROVED THE APPROVED OR THE
SCALE NTS CORRECTIONS/COMMENTS
APPROVED AS CORR.
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
LEGEND/S: REVISE & RESUBMIT
DISAPPROVED
CONTRACTOR FROM
COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

55mmx69mm
PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
4
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
H J J' K L M N P P' Q

1,890
1,020
2

1,000
GFCI
ELPG4-4

2,300

2,700
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)
ELPG4-5

3,000
1,400

GFCI

3,100
2,100
TO LIGHTS

1,560
2,100
3
GFCI
TO ELEVATOR SHAFT TO ELEVATOR SHAFT
TO LIGHTS
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

(BASEMENT FLOOR LVL. TOWER 4)


1 ENLARGED FLOOR PLAN
SCALE NTS APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
INDICATED HEREIN DOES
LEGEND/S:
NOTED
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

PROJECT TITLE SHEET CONTENTS: REVISIONS 55mmx69mm


DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
5
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
A B B' C D E E' F G H J J' K L M N P P' Q R

1,890
1,020
GFCI
2 ELPGA-9

1,000
GFCI
ELPGA-10 ELPG4-4

2,300
3,800

2,700
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)
ELPG4-5

3,000
1,400

1,980
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL) GFCI

3,235

3,100
2,135

2,130

2,100
TO LIGHTS

1,560
2,100
3
GFCI
TO ELEVATOR SHAFT TO ELEVATOR SHAFT TO ELEVATOR SHAFT TO ELEVATOR SHAFT
TO LIGHTS
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)

TO ELEVATOR SHAFT EPP2-7

740
LIGHTING CKT. (TYPICAL)
6 TO ELEVATOR SHAFT
540

TO ELEVATOR SHAFT
TO ELEVATOR SHAFT

1,800
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)

2,750
LIGHTING CKT. (TYPICAL)

3,050
TO ELEVATOR SHAFT
2,990

130 20
ELPG2-9 LIGHTING CKT. (TYPICAL) TO ELEVATOR SHAFT ELPG3-7
1,300 LIGHTING CKT. (TYPICAL)
ELPG2-6 630
2,300

ELPG3-8
GFCI 1,050 2,360
7
2,160

1,300
1,400 ELPG2-27 1,230 ELPG3A-6

1,330
PPT2-8

8
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

970 380

S T U U' V W X X' Y Z AA AA' AB AC AD AD' AE AF AG AH AJ

(BASEMENT FLOOR LVL.)


LEGEND/S:
1 POWER SETTING OUT EMBEDDED TO SLAB
SCALE NTS
APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
PROJECT TITLE SHEET CONTENTS: REVISIONSSPECIFICATIONS. DATE DRAWN BY LMC SHEET NO.
BY: Edwin Francis Cruz DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL.
15 JUN 2021 CHECKED BY
DATE:

DATE 10/02/2021
1
wdainc@wdaic.com.ph
APPROVED BY
PRC NO.
Validity
PTR NO.
Date Issued #Site Full Address
55mmx69mm
TIN Issued at
DATE 10/02/2021

GSPublisherVersion 0.0.100.100
A B B' C D E E' F G

GFCI
2 ELPGA-9
ELPGA-10

3,800

1,980
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)

3,235
2,135

2,130
3
TO ELEVATOR SHAFT TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)

APPROVED THE APPROVED OR THE


APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

DATE: 15 JUN 2021

55mmx69mm

(BASEMENT FLOOR LVL. TOWER 1)

LEGEND/S:
1 ENLARGED FLOOR PLAN
SCALE NTS

PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
2
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
4

TO ELEVATOR SHAFT EPP2-7


6
LIGHTING CKT. (TYPICAL)

540
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)

EPP2-9 TO ELEVATOR SHAFT

2,990
130 ELPG2-9 LIGHTING CKT. (TYPICAL)
1,300
ELPG2-6

2,300
GFCI
7
1,400 ELPG2-27 2,160 1,230
APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz
1,330
DATE: 15 JUN 2021
PPT2-8
55mmx69mm
8
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

970 380

S T U U' V W X X' Y

LEGEND/S:
(BASEMENT FLOOR LVL. TOWER 2)
1 ENLARGED FLOOR PLAN
SCALE NTS

PROJECT TITLE SHEET CONTENTS: REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
3
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
4

740
6 TO ELEVATOR SHAFT
TO ELEVATOR SHAFT

1,800
LIGHTING CKT. (TYPICAL)

2,750
LIGHTING CKT. (TYPICAL)

3,050
20
TO ELEVATOR SHAFT ELPG3-7
LIGHTING CKT. (TYPICAL)
630
ELPG3-8
1,050 2,360
7

1,300
ELPG3A-6

9
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

Z AA AA' AB AC AD AD' AE AF AG AH AJ
(BASEMENT FLOOR LVL. TOWER 3)
1 ENLARGED FLOOR PLAN
SCALE NTS APPROVED THE APPROVED OR THE
APPROVED AS CORR. CORRECTIONS/COMMENTS
INDICATED HEREIN DOES
LEGEND/S:
NOTED
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

PROJECT TITLE SHEET CONTENTS:


55mmx69mm REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
4
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
H J J' K L M N P P' Q

1,890
1,020
2

1,000
GFCI
ELPG4-4

2,300

2,700
TO ELEVATOR SHAFT
LIGHTING CKT. (TYPICAL)
ELPG4-5

3,000
1,400

GFCI

3,100
2,100
TO LIGHTS

1,560
2,100
3
GFCI
TO ELEVATOR SHAFT TO ELEVATOR SHAFT
TO LIGHTS
LIGHTING CKT. (TYPICAL) LIGHTING CKT. (TYPICAL)
C:\Users\User\Desktop\lyka\MIDPARK SHOP DRAWINGS\SHOP DRAWINGS\ELECTRICAL\SETTING OUT\POWER\BASEMENT.pln

(BASEMENT FLOOR LVL. TOWER 4)


1 ENLARGED FLOOR PLAN
SCALE NTS THE APPROVED OR THE
APPROVED
APPROVED AS CORR. CORRECTIONS/COMMENTS
LEGEND/S: NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

PROJECT TITLE SHEET CONTENTS: 55mmx69mm REVISIONS DATE DRAWN BY LMC SHEET NO.
DATE 10/02/2021
POWER SETTING OUT @BASEMENT LVL. CHECKED BY
DATE 10/02/2021
5
wdainc@wdaic.com.ph
PRC NO. PTR NO.
APPROVED BY
Validity Date Issued #Site Full Address DATE 10/02/2021
TIN Issued at

GSPublisherVersion 0.0.100.100
SEE COMMENTS

MARCH 11, 2021

APPROVED THE APPROVED OR THE


APPROVED AS CORR. CORRECTIONS/COMMENTS
NOTED
INDICATED HEREIN DOES
NOT RELIEVE THE
REVISE & RESUBMIT
CONTRACTOR FROM
DISAPPROVED COMPLYING WITH ALL THE
REQUIREMENTS OF THE
REMARKS:
CONTRACT PLANS AND
SPECIFICATIONS.
BY: Edwin Francis Cruz

DATE: 15 JUN 2021

55mmx69mm
SY2:
- VERIFY ELECTRICAL REQUIREMENTS WITH
CONSULTANT
- VERIFY ARCHITECTURAL REQUIREMENTS

(1) CONDUITS PASSING THROUGH SHEARWALLS


SHALL ALWAYS BE PERPENDICULAR TO THE
SHEARWALL

(2) KINDLY INCLUDE THE DIAMETER OF CONDUITS IN


THE DRAWINGS FOR SUBSEQUENT SUBMITTALS

SEE ENLARGED PLAN SEE ENLARGED PLAN

MAR 11, 2021


MAR 11, 2021
MOVE (1)

(1) CONDUITS PASSING THROUGH SHEARWALLS SHALL


ALWAYS BE PERPENDICULAR TO THE SHEARWALL

MAR 11, 2021


MOVE (1)

(1) CONDUITS PASSING THROUGH SHEARWALLS SHALL


ALWAYS BE PERPENDICULAR TO THE SHEARWALL

MAR 11, 2021


MAR 11, 2021
SEE ENLARGED PLAN SEE ENLARGED PLAN

MAR 11, 2021


MAR 11, 2021
MOVE (1)

(1) CONDUITS PASSING THROUGH SHEARWALLS SHALL


ALWAYS BE PERPENDICULAR TO THE SHEARWALL

MAR 11, 2021


MOVE (1)

(1) CONDUITS PASSING THROUGH SHEARWALLS SHALL


ALWAYS BE PERPENDICULAR TO THE SHEARWALL

MAR 11, 2021


MAR 11, 2021