Tgl No. Reff Keterangan Laporan PC Kantor Lemburan Pasir Prelim Bedeng Mur + Baut Kalsiboard Hotdip Spacer MU 408 Via Gudang Material Bantu Petty Cash
Belanja :
* Lem Epotec = 1 Dus = 50 Pcs 195,000
* Rofing 10/25 = 1000 Pcs 170,500
* Paku Beton = 5 Kg 187,600
* Catalis 100 cc = 3 Botol 45,000
18/10/16 BBK 337 Belanja :
* Epoxy Resin = 10 Set
* Sika Top 107 (Cairan) = 2 Galon
18/10/16 BBK 338 Ishinol Clear Coat G = 20 Liter /Pail x Rp. 330.000,-
18/10/16 BBK 340 Triplek 3 mm 4x8 Palem = 200 Lembar x Rp. 48.500,-
03/11/16 BBK 352 Kertas A3 = 2 Rim , Kertas A4 = 2 Rim , Spidol W/B H = 2 Pcs 281,500
Isi Max 10 = 1 Pak
Binder Clip 260 = 1 Lusin
Binder Clip 255 = 1 Gross
03/11/16 BBK 353 Sika Top 107 (Cairan) = 5 Galon 1,000,000
Kawat Seng BWG 18 = 5 Kg 65,000
03/11/16 BBK 354 Biaya u/ Engineering 10,000,000
10/11/16 BBK 367 Belanja : Kalsiboard uk 2mm/1200/2400 (16 Lembar x Rp. 220.000,-) 3,520,000
11/11/16 BBK 373 * Tinta Printer 5 Botol (Hitam = 2 Botol , Cyan , Magenta , Yellow @ 1 Botol)
* MU 408 Stone Grey = 20 Bungkus (Grouting) 400,000
14/11/16 BBK 374 Biaya Keamanan Periode : Agustus - Oktober 2016 750,000
Biaya Copy Mapping Progress 147,500
Air Mineral Isi Ulang & Aqua 148,000
Steker Listrik , Terminal Listrik 2, 3 Lubang 30,500
Belanja : 413,000
* Sipatan , Rantai besi ,Gembok , Kuas , Pilox , Kain Majun , Lem Fox Kecil
Stabilo , Battery , Tinta Refill - CN 053 A 151,300
14/11/16 BBK 375 Biaya Fotocopy - u/ Gelaran drylay 184,000
14/11/16 BBK 376 Lemburan Periode : Oktober 2016 = 45 1/2 Jam x Rp. 10.000,- (Asep) 455,000
Parkiran 457,000
Tgl No. Reff Keterangan Laporan PC Kantor Lemburan Pasir Prelim Bedeng Mur + Baut Kalsiboard Hotdip Spacer MU 408 Via Gudang Material Bantu Petty Cash
14/11/16 BBK 377 Lemburan Periode : Oktober 2016 = 47 1/2 Jam x Rp. 7.500,- (Hartoyo) 356,500
Parkiran 291,000
14/11/16 BBK 378 Lemburan Periode : Oktober 2016 = 34 1/2 Jam x Rp. 7.500,- (Marulloh) 334,000
Hari Libur = 1 Hari x Rp. 75.000,-
Parkiran 316,000
14/11/16 BBK 379 Lemburan Periode : Oktober 2016 = 33 Jam x Rp. 7.500,- (Ismanto) 247,500
Parkiran 277,000
14/11/16 BBK 380 Lemburan Periode : Oktober 2016 = 32 Jam x Rp. 7.500,- (Indra) 240,000
14/11/16 BBK 381 Lemburan Periode : Oktober 2016 = 37 Jam x Rp. 7.500,- (Gita) 277,500
14/11/16 BBK 382 Lemburan Periode : Oktober 2016 = 51 Jam x Rp. 7.500,- (Albert) 382,500
Parkiran 323,000
14/11/16 BBK 383 Lemburan Periode : Oktober 2016 = 41 Jam x Rp. 7.500,- (Affan) 307,500
Parkiran 283,000
22/11/16 BBK 392 Biaya Sewa Bedeng Periode : 20/09-19/10/16 3,210,000
NB : Harga Sewa Rp. 3.000.000 + PPN Rp. 3.300.000,-
Pot PPH 3% Rp. 90.000,-
24/11/16 BBK 393 Belanja : Paku Beton 7" = 5 Kg 187,600
25/11/16 BBK 400 Belanja : Talk = 1 Sak 85,000
Apart = 1 Tabung 300,000
01/12/16 BBK 404 Belanja : Paku Beton KW 1" = 3 Dus 112,600
Isi Tabung Pemadam Kebakaran = 1 Tabung 180,000
Lem Epotec @ 50 tube/dus = 1 dus 200,000
Kawat Las s/s 304 dia 0,8 mm = 5 kg 245,000
Skrup M10 - Rofing uk 8/25 = 1000 Pcs 132,000
08/12/16 BBK 417 Kalsiclad uk 12 mm /1200 /2400 = 18 Lembar x Rp. 220.000,- 3,960,000
08/12/16 BBK 418 Biaya Entertaint dengan Pihak MK (PT. Trimatra Jaya Persada) 1,000,000
09/12/16 BBK 421 Belanja : Plastik Cor 4 Roll = 28,7 Kg 373,100
Paku Beton Putih 3" = 5 dus 187,600
Mur Baut Ring Plat (Surya Baru Cemerlang ) 1500 set x Rp. 315 472,500
Faktur : 010.033 16 67330725
09/12/16 BBK 422 Biaya Sewa Bedeng Periode : 20/09 - 19/10/16 3,210,000
Rp. 3.000.000 + PPN 10% = Rp. 3.300.000,- (Pot PPH 3% dari 3juta Rp. 90.000,-)
15/12/16 BBK 426 Via Global Cipta Komputer - Biaya Service Printer Komputer - Epson L1300 135,000
(Cartdrige Kadaluarsa)
Fotocopy u/ data gelaran + u/ BQ 217,800
15/12/16 BBK 427 Belanja : Kain Majun 10 Kg 250,000
FH Rofing uk.10/25 = 1000 Pcs 170,500
19/12/16 BBK 438 Uang Lemburan Toyo 512,000
19/12/16 BBK 439 Sika Top 107 (Cairan) = 5 Galon
Fotocopy 74,500
19/12/16 BBK 440 Lemburan Asep 395,000
Parkiran 402,000
19/12/16 BBK 441 Lemburan Affan 281,500
Parkiran 281,000
19/12/16 BBK 442 Lemburan Marulloh 206,500
Parkiran 212,000
19/12/16 BBK 443 Lemburan Ismanto 274,000
Parkiran 132,000
19/12/16 BBK 443 Lemburan Albert 139,000
Parkiran 167,000
19/12/16 BBK 444 Lemburan gita 109,000
20/12/16 BBK 447 Biaya Entertain 20,000,000
(Yulius Adhi Rp. 3.000.000,- PBI Rp. 5.000.000,- Nakamura Rp. 1.000.000,-
Mok Rp. 5.000.000,- Higaki Rp. 1.000.000,- Dadan Rp. 500.000,-
Hadi Rp. 500.000,- Adib Rp. 500.000,- Christ Rp. 500.000,-
Belanja u/ Gudang 40,000
Fotocopy 65,000
27/12/16 BBK 457 Via CV Karya Niaga
* Sticker Dry Lay = 4000 Pcs 1,600,000
29/12/16 BBK 459 Belanja : Roffing uk 10/25 = 1000 Pcs 170,500
Via Surya Baru Cemerlang : Faktur 010.034 16 62191926 1,600,000
* Baut Mur S/S M8/20 = 1000 Set
* Ring Plat,Ring Per s/s M8 = 1000 Set
Tgl No. Reff Keterangan Laporan PC Kantor Lemburan Pasir Prelim Bedeng Mur + Baut Kalsiboard Hotdip Spacer MU 408 Via Gudang Material Bantu Petty Cash
28/02/17 BBK 76 Belanja : Sika Top 107 = 2 Set (Cat Spray - Pilox) 731,500
Kuas 4",Thinner,Impala,Cat Glotex Aluminium,Kuas 2,5'
Aqua Galon = 8 Galon , Duplikat Kunci 148,000
Biaya Bongkar Pasang AC + Cuci 150,000
Tinta Epson T6641,Kertas A4,A3,Stabillo dll 252,000
Iuran Keamanan Periode November , Desember 2016 , Januari 2017 750,000
28/02/17 BBK 77 Periode : Januari 2017 (Asep)
Biaya Parkiran 554,000
Biaya Lemburan : 50 Jam x Rp. 10.000 , 2 Hari Libur Tgl : 08,28/01/17 @ Rp. 100.000,- 700,000
Periode : Januari 2017 (Ismanto)
Biaya Parkiran 149,000
Biaya Lemburan : 57 Jam x Rp. 10.000 , 2 Hari Libur Tgl : 22/01/17 @ Rp. 75.000,- 502,500
28/02/17 BBK 79 Periode : Januari 2017 (Affan)
Biaya Parkiran 278,000
Biaya Lemburan : 40 Jam x Rp. 7.500,- 300,000
28/02/17 BBK 80 Via Surya Baru Cemerlang : Baut s/s uk.m8/35 = 500 Pcs x Rp. 1.400,- 700,000
28/02/17 BBK 81 Periode : Januari 2017 (Hartoyo)
Biaya Parkiran 268,000
Biaya Lemburan : 39 Jam x Rp. 7.500,- 292,500
03/03/17 BBK 86 Belanja : MU 408 C - 07 = 1 Kg 12,850
MU 408 C - 08 = 10 Kg 127,500
10/03/17 BBK 91 Via Surya Baru Cemerlang : No Faktur 010.001 17 17595393 2,200,000
* Mur Baut M8/35 + Ring Plat + Ring Per = 1000 Set x Rp. 2.200,-
10/03/17 BBK 92 Pengisian Tabung Pemadam Kebakaran (2 Tbg x Rp. 180.000,-) 360,000
15/03/17 BBK 99 Periode : Februari 2017 (Ismanto)
Biaya Parkiran 173,000
Biaya Lemburan : 46 1/2 Jam x Rp. 10.000 , 1 Hari Libur @ Rp. 75.000,- 349,000
15/03/17 BBK 100 Periode : Februari 2017 (Affan)
Biaya Parkiran 262,000
Biaya Lemburan : 45 1/2 Jam x Rp. 7.500,- 341,500
15/03/17 BBK 101 Periode : Februari 2017 (Asep)
Biaya Parkiran 533,000
Biaya Lemburan : 53 Jam x Rp. 10.000 530,000
17/03/17 BBK 108 Periode Februari 2017
Uang Lemburan 361/2 Jam 274,000
Parkir 274,000
Beban : SCBD Lot 10
Kemang Village , MNC , Wika Cawang
21/03/17 BBK 111 Biaya Sewa Bedeng Periode : 01/02/17 - 28/02/17
Rp. 2.000.000 + PPN 10% = Rp. 2.200.000,- (Pot PPH 3% dari 2juta Rp. 60.000,-) 2,140,000
21/03/17 BBK 112 Biaya Entertain u/Acara TTJO & TJP (Via Yulius) 2,000,000
23/03/17 BBK 119 Pin S/S 40/4 mm = 4000 Pcs 2,400,000
MU 408 C @ 1kg/Kantong = 15 Kantong 128,500
23/03/17 BBK 120 Periode : November 2016 (Pipin)
Bensin : 1,4,8,10,12,15,17,19,22,25,28 1,608,500
Parkir 157,000
Tol 869,500
Pulsa : 3,12,22/11/16 @ Rp. 102.000,- 306,000
10/04/17 BBK 139 Belanja : MU 408 P - Cocora = 10 Bungkus 127,500
Biaya Fotocopy u/Buat Progress 86,800
12/04/17 BBK 141 Via Surya Baru Cemerlang (No. Faktur : 225,000
* Mur s/s M8 = 200 Pcs x Rp. 600,-
* Ring Plat s/s m8 = 300 Pcs x Rp. 150,-
* Ring Plat s/s m8 = 300 Pcs x Rp. 200,-
12/04/17 BBK 142 Periode : Maret 2017 (Asep)
Biaya Parkiran 406,000
Biaya Lemburan : 31,5 Jam x Rp. 10.000 315,000
12/04/17 BBK 143 Periode : Februari 2017 (Ismanto)
Biaya Parkiran 290,000
Biaya Lemburan : 26,5 Jam x Rp. 7.500 199,000
12/04/17 BBK 144 Periode : Maret 2017 (Affan)
Biaya Parkiran 273,000
Biaya Lemburan : 21 Jam x Rp. 7.500,- 157,500
Tgl No. Reff Keterangan Laporan PC Kantor Lemburan Pasir Prelim Bedeng Mur + Baut Kalsiboard Hotdip Spacer MU 408 Via Gudang Material Bantu Petty Cash
Parkir 183,000
Tol 692,000
Pulsa : 6,15,27 @ Rp. 102.000,- 306,000
19/09/17 BBK 282 Periode : Mei 2017 (Pipin)
Bensin : 2,5,8,10,15,17,19,22,24,27,30 1,610,000
Parkir 68,000
Tol 841,500
Pulsa : 7,10 @ Rp. 100.000,- , 25 Rp. 52.000,- 256,000
19/09/17 BBK 283 Periode : Juni 2017 (Pipin)
Bensin : 5,9,13,15,17,20,22 1,135,000
Parkir 127,000
Tol 598,500
Pulsa : 6,12 @ Rp. 102.000,- 204,000
Spooring Balancing R12 18/06/17 245,000
Tiket Damri 40,000
06/10/17 BBK 314 Periode : Agustus 2017 (Pipin)
Bensin : 3,8,10,12,15,18,21,23,25,28,31 1,694,000
Parkir 186,000
Tol 938,900
Pulsa : 6,12 @ Rp. 102.000,- 306,000
06/10/17 BBK 315 Periode : Juli 2017 (Pipin)
Bensin : 4,7,10,13,15,18,20,22,25,28,31 1,695,500
Parkir 66,000
Tol 754,000
Pulsa : 10,19/07/17 @ Rp. 102.000,- 204,000
08/06/16 BBK Biaya Hotdip Galvanis Siku 40/4/6 = 300 Btg = 4.381 kg x Rp. 3.630,-/kg 15,903,000
23/06/16 BBK 174 AC Sharp 1 PK type (Via Bp. Agus) 4,500,000
16/12/16 BBK 349 Faktur : 010.034 16 49730980
* Kalsiboard 12 mm/1200/2400 = 50 Lembar x Rp. 230.500,- 13,040,000
* Kalsiboard 10 mm/1200/2400 = 10 Lembar x Rp. 151.500,-
Via Gudang :
5/25/2016 BBK 10 Line Laser GLL S - SO (Bosch) = 1 Unit x Rp. 1.742.000,- 1,742,000
Stand Tripod BTISO 5/8" (BOSCH) = 1 Unit x Rp. 660.000,- 660,000
Via PC ASEP :
1,030,400 84,758,500 35,126,750 2,250,000 47,179,600 50,434,700 8,762,500 39,370,000 15,903,000 3,710,000 970,950 85,000 126,988,700 2,000,000
416,570,100
2,000,000
Sisa PC di Asep (969,600)
Turi
Tgl No. Reff Keterangan
Kasbon Retensi Material Bantu
10/05/16 BBK 473 Belanja : Pisau DMX Misile Wet = 5 buah 575,000
Mesin Potong Maktec MT 410 = 1 Unit 750,000
Mesin Gurinda Maktec MT 954 = 1 Unit 450,000
Mesin Bor Maktec MT 817 = 1 Unit 497,500
17/05/16 BBK 138 Belanja : Kawat Las Atlantic dia 2,6 mm = 5 Kg 112,500
Mesin Potong MT 240 Maktec = 1 Unit 1,360,000
Travo Las Rama - 200A B Rhino = 1 Unit 1,550,000
18/05/16 BBK 142 Kasbon () Pek. Rangka Toilet , Marking Toilet dll 6,000,000
* Periode : 07/05/16 , 09/05 - 15/05/16
26/05/16 BBK 150 Kasbon () Pek. Pemasangan Dinding Toilet , Lantai Lobby dll (Mock Up) 3,300,000
* Periode : 16 - 17/05/2016 = 4 Tukang
* Periode : 18 - 19/05/2016 = 5 Tukang
* Periode : 21/05/2016 = 2 Tukang
* Periode : 22/05/2016 = 3 Tukang
02/06/16 BBK 155 Kasbon () Pek. Periode : 23 - 24/05/16 850,000
30/06/16 BBK 184 Kasbon () Pek. Pemasangan :
* Periode : 23 - 25/06/16 1,700,000
* Periode : 27 - 30/06/16 , 01/07/16 3,000,000
01/07/16 BBK 192 Kasbon () u/ THR Lebaran 2016 6,000,000
22/07/16 BBK 208 Belanja : Kabel uk. 1,5/2 = 1 Roll 290,000
Mesin Bor VTP 18 Hitachi = 1 Unit 1,200,000
Mesin Potong Maktec MT 410 = 2 Unit 1,500,000
Mesin Gurinda Maktec MT 954 = 2 Unit 900,000
Mesin Las Rhino HT 200 A = 1 Unit 2,000,000
Kawat Las RB 2,6 mm = 2 Box 300,000
22/07/16 BBK 209 Kasbon () Pek. Pemasangan Periode : 11 - 17/07/16 4,400,000
29/07/16 BBK 216 Kasbon () Pek. Pemasangan Periode : 18 - 24/07/16 11,000,000
05/08/16 BBK 222 Kasbon () Pek. Pemasangan Periode : 25 - 31/07/16 12,000,000
09/08/16 BBK 223 Lampu LED 50 Watt = 2 Unit 400,000
12/08/16 BBK 230 Kasbon () Pek. Pemasangan Periode : 01-07/08/16 18,300,000
15/08/16 BBK 235 Belanja : Pisau DMX Misile = 5 Pcs x Rp. 99.500,- 497,500
Batu Potong 14" x 3 = 5 Pcs 125,000
Lem Epotec = 1 Dus 195,000
Steker Genset Karet = 5 Pcs 125,000
Kabel Eterna 3/2,5 = 3 Roll 2,346,000
Kabel Eterna 2/2,5 = 1 Roll 395,000
19/08/16 BBK 244 Kasbon () Pek. Pemasangan Periode : 08 - 14/08/16 23,000,000
19/08/16 BBK 245 Kabel Eterna Uk. 3/2,5 = 1 Roll 585,000
25/08/16 BBK 255 Kasbon () Pek. Pemasangan Periode : 15 - 21/08/16 27,000,000
01/09/16 BBK 266 Kasbon () Pek. Pemasangan Periode : 22-28/08/16 28,500,000
08/09/16 BBK 283 Kasbon () Pek. Pemasangan Periode : 29/08 - 04/09/16 26,000,000
15/09/16 BBK 293 Kasbon () Pek. Pemasangan Periode : 05-11/09/16 22,500,000
21/09/16 BBK 302 Kasbon () Pek. Pemasangan Lantai,Dinding, dll Periode : 12-18/09/16 17,000,000
30/09/16 BBK 313 Kasbon () Pek. Pemasangan Lantai,Dinding, dll Periode : 19-25/09/16 22,000,000
06/10/16 BBK 317 Kasbon () Pek. Pemasangan Lantai,Dinding, Foyer dll 15,500,000
11/10/16 BBK 330 Belanja : Pisau DMX Misile = 6 Pcs x Rp. 630,000
CB 303 A Makita = 1 Dus (10 Set) 250,000
Pisau Potong Kimko = 5 Pcs 105,000
Pad 500,1000,2000 = 2 Pcs 135,000
13/10/16 BBK 332 Kasbon () Pek. Pemasangan Lantai,Dinding, Foyer dll 17,250,000
20/10/16 BBK 342 Kasbon () Pek. Pemasangan Lantai,Dinding,Rangka Siku dll : 10-16/10/16 16,000,000
26/10/16 BBK 348 Kasbon () Pek. Pemasangan Periode : 17/10-22/10/16 14,750,000
03/11/16 BBK 357 Kasbon () Pek. Pemasangan Lantai,Dinding,Skirting Periode : 24-30/10/16 15,250,000
10/11/16 BBK 366 Kasbon () Pek. Pemasangan Lantai , Dinding, Skirting dll Periode : 31/10 , 01 - 06/11/16 15,250,000
10/11/16 BBK 368 Belanja :
* Pisau Kymco Wet = 5 bh 125,000
* Pisau DMX Misile = 2 Pcs 210,000
* Flexible GL 80 Bilima = 5 Pcs 42,500
* Resibon 14" = 5 Pcs 125,000
* Kawat Las RD 260 = 10 Kg 220,000
18/11/16 BBK 385 Kasbon () Pek. Pemasangan Lantai,Dinding,Skirting Periode : 07-13/11/16 18,000,000
24/11/16 BBK 397 Kasbon () Pek. Pemasangan Lantai,Dinding dll Periode : 14-20/11/16 21,000,000
01/12/16 BBK 405 Kawat Las Nikko RD 260 = 10 kg 212,000
Pisau DMX Misile = 6 Pcs 660,000
01/12/16 BBK 409 Kasbon () Pek. Pemasangan Lantai,Dinding,dll Periode : 21-27/11/16 21,500,000
08/12/16 BBK 415 Kasbon () Pek. Pemasangan Dinding Periode : 28/11-30/11/16 , 01-04/12/16 21,750,000
16/12/16 BBK 433 Kasbon () Pek. Pemasangan Dinding Periode : 05-11/12/16 21,750,000
22/12/16 BBK 452 Kasbon () Pek. Pemasangan Dinding Periode : 12-18/12/16 13,750,000
29/12/16 BBK 463 Kasbon () Pek. Pemasangan Dinding Periode : 19-25/12/16 14,000,000
Yanto
Tgl No. Reff Keterangan
Kasbon Retensi Perbaikan Kerja Rusmono Material Bantu
05/01/16 BBK 04 Kasbon () Pek. Pemasangan Lantai,Skirting dll Periode : 26/12 - 30/12/16 , 01/01/17 8,500,000
13/01/17 BBK 11 Kasbon () Pek. Pemasangan Lantai,Dinding,Rangka Besi dll Periode : 02-08/01/17 9,250,000
19/01/17 BBK 25 Kasbon () Pek. Pemasangan Lantai,Dinding,Rangka Besi dll Periode : 09-15/01/17 11,250,000
26/01/17 BBK 34 Kasbon () Pek. Pemasangan Lantai,Dinding,Skirting dll Periode : 16-22/01/17 10,750,000
02/02/17 BBK 42 Kasbon () Pek. Pemasangan Lantai,Dinding,Skirting dll Periode : 23-29/01/17 10,500,000
09/02/17 BBK 49 Kasbon () Pek. Pemasangan Lantai,Dinding,dll Periode : 30-31/01/17,01-05/02/17 8,750,000
17/02/17 BBK 60 Kasbon () Pek. Pemasangan Lantai,Dinding,Skirting,Rangka Besi dll Periode : 06-12/02/17 9,750,000
24/02/17 BBK 69 Kasbon () Pek. Pemasangan Lantai,Dinding,Rangka Besi dll u/Lt.11,12,13,22,25,29 9,500,000
Periode : 13-14/02/17 , 16-19/02/17
03/03/17 BBK 85 Kasbon () Pek.Pemasangan Rangka,Dinding,Skirting Periode : 20-26/02/17 12,500,000
10/03/17 BBK 96 Kasbon () Pek.Pemasangan Lantai,Dinding,Skirting dll : 27-28/02/17 , 01-05/03/17 8,750,000
16/03/17 BBK 105 Kasbon () Pek.Pemasangan Dinding,Lantai Foyer,Skirting dll Periode : 06-12/03/17 9,000,000
23/03/17 BBK 115 Kasbon () Pek. Pemasangan Lantai Foyer , Rangka Besi , Pasang Dinding Jamb Lift u/ Lt.3 dll : 13-19/03/17 9,000,000
31/03/17 BBK 130 Kasbon () Pek.Pemasangan Lantai Foyer,Dinding,Rangka Besi dll Periode : 20-26/03/17 10,500,000
07/04/17 BBK 136 Kasbon () Pek.Pemasangan Box Sensor ,Bongkar Pasang Belakang Closet Male : 27-31/03/17,01-02/04/17 9,000,000
13/04/17 BBK 149 Kasbon () Pek.Pemasangan Rangka Besi,Lantai,Adu Manis dll Periode : 03-09/04/17 10,500,000
21/04/17 BBK 155 Kasbon () Pek. Fabrikasi Lisplang,Las Bracket Siku - Pasang Lisplang Periode : 10-16/04/17 10,500,000
28/04/17 BBK 163 Kasbon () Pek. Pemasangan , Fabrikasi , Sealant dll Periode : 17-23/04/17 11,000,000
05/05/17 BBK 166 Kasbon () Pek.Pemasangan & Fabrikasi Tombol Lift ,Pasang Dinding,Moving dll : 24-29/04/17 7,500,000
12/05/17 BBK 170 Kasbon () Pek. Pemasangan Inlay Stainless , Pasang Dinding Kering dll Periode : 01-06/05/17 6,000,000
24/05/17 BBK Kasbon () Pek.Perbaikan Nat Toilet,Toping Closet dll u/Lt.29,7 : 15-20/05/17 1,400,000
08/06/17 BBK 201 Kasbon () Pek.Perbaikan u/Setting Ulang Topping,Coring Lobang Tempat Shower dll u/Lt.7,3,4,5,11,22,25 1,500,000
Periode : 29-31/05/17 , 01-03/06/17
15/06/17 BBK 211 Kasbon () Pek.Perbaikan Defect Nat u/lt.3,4,29 , Lubang Coring Area VIP Toilet 1,500,000
u/lt. 3,4,11,12,13,22,25,29,20,21,23,24,28 - Unit Rusmono
20/06/17 BBK 215 Kasbon () Pek. Potong Rangka Besi Area Lampu Indikator,Poles Dinding Carpark,Pasang Skirting dll 3,600,000
u/lt.3,5,4,B5,Lt.25 Periode : 12-17/06/17 , 19-21/06/17
21/07/17 BBK 225 Kasbon () Pek. Perbaikan Nat,Pad,Resin dll Periode : 10-14/07/17 2,000,000
27/07/17 BBK 235 Upah Kerja Perbaikan Unit rusmono (Dikerjakan oleh Mandor Yanto) : 17-23/07/27 = 3 tkg 1,750,000
03/08/17 BBK 238 Kasbon () Pek. Perbaikan Nat,Resin dll u/Lt.3,4,B3 (Area Rusmono) : 24-30/07/17 = 2 tukang 1,250,000
31/08/17 BBK 256 Upah Kerja Perbaikan (Beban Rusmono) Bongkar Pintu Chimney = 2 Unit Periode : 21-23/08/17 = 3tkg 1,300,000
14/09/17 BBK 270 Kasbon () Pek.Pemasangan Pintu Chimney,Bevel,Poles,Lobang u/Kunci Pintu Besi 1,000,000
Periode : 05-06/09/17 = 3 tkg , 07/09/17 = 1 tkg
395,300,000
Proyek SCBD Lot 10 :
336,260,000
Proyek SCBD Lot 10 :
Jono
Tgl No. Reff Keterangan
Upah Kerja Retensi Material Bantu
26/05/16 BBK 151 Upah Kerja - Poles (Mock Up) u/ Lift Lobby & Toilet Periode : 19 - 21/05/16 810,000
9/1/2016 BBK 269 Belanja :
* Songket 1 P = 16 A = 1 Set 122,000 2,725,000
* Kabel Eterna Hitam uk. 3/2,5 = 1 Roll 585,000
* Mesin Gurinda Bosch Type GWS 8-100 CE 860,000
08/09/16 BBK 287 Upah Kerja Poles Periode : 30/08/16 , 01/09 - 02/09/16 3,030,000
Belanja : Pad,Ember dll 1,083,000
15/09/16 BBK 291 Upah Kerja Polesan Periode : 05-10/09/16 3,620,000
Belanja : Resibon,Flexible dll 75,000
21/09/16 BBK 300 Upah Kerja Poles Honed , Nat Lantai , Skirting u/ Lobby Lt. 15 : 13/09/16 180,000 260,000
03/10/16 BBK 314 Upah Kerja Poles u/ Lt. 15 Mock Up Periode : 22-24/09/16 2,200,000
26/10/16 BBK 346 Kasbon () Poles Periode : 19/10 - 22/10/16 1,400,000
31/10/16 BBK 351 Belanja : Kabel Eterna uk. 3/2,5 = 2 Roll 1,230,000 1,313,000
Soket Mobile 1 Phase = 1 Bh 38,000
Soket Mobile 3 Phase = 1 Bh 45,000
03/11/16 BBK 355 Upah Kerja Poles Periode : 24 - 30/10/16 4,000,000
10/11/16 BBK 364 Upah Kerja Poles Periode : 31/10,01-05/11/16 2,500,000
18/11/16 BBK 384 Upah Kerja Nat & Buffing Area Toilet male & Female Lt. 8,9,10 4,560,000
Periode : 07-10,12/11/16 = 5 Tkg + Jono , 11/11/16 = 3 tkg
24/11/16 BBK 395 Upah Kerja Poles Lantai Periode : 14 - 20/11/16 4,000,000
01/12/16 BBK 406 Upah Kerja Poles Lantai Periode : 21-27/11/16 , 28/11/16 6,000,000
Potong Kasbon (I) u/ Makan (Rp. 200.000,-)
Pinjam tgl : 18/11/16 Rp. 1.000.000,- Via BCA WAM
08/12/16 BBK 416 Upah Kerja Poles Periode : 28-30/11/16 , 01-03/12/16 4,500,000
16/12/16 BBK 432 Upah Kerja Poles Periode : 05-10/12/16 5,800,000
Potong Kasbon (II) u/ Makan (Rp. 200.000,-)
Pinjam tgl : 18/11/16 Rp. 1.000.000,- Via BCA WAM
22/12/16 BBK 450 Upah Kerja Poles Periode : 13-17/12/16 3,155,000
Potong Kasbon (III) u/ Makan (Rp. 200.000,-)
Pinjam tgl : 18/11/16 Rp. 1.000.000,- Via BCA WAM
29/12/16 BBK 461 Upah Kerja Poles Periode : 13-17/12/16 3,155,000
Potong Kasbon (IV) u/ Makan (Rp. 200.000,-)
Pinjam tgl : 18/11/16 Rp. 1.000.000,- Via BCA WAM
05/01/17 BBK 03 Upah Kerja Poles Periode : 26-31/12/16 u/ Lantai 13,14,16 2,500,000
Potong Kasbon (V) u/ Makan (Rp. 200.000,-)
Belanja : Mill,Catalis,Pigmen
Pinjam tgl : 18/11/16 Rp. 1.000.000,- Via BCA WAM
13/01/16 BBK 09 Upah Kerja Poles Periode u/lt. 16,17 Periode : 02-07/01/17 2,750,000
Belanja : Mill,Pad dll
19/01/17 BBK 24 Upah Kerja Poles Periode u/lt. 17, Pek. Perbaikan Lt. 8 -12 Periode : 02-07/01/17 3,000,000
26/01/17 BBK 33 Upah Kerja Poles Periode u/lt. 17, Pek. Perbaikan Lt. 8,9,10,11,12 Periode : 16-22/01/17 3,300,000
02/02/17 BBK 41 Upah Kerja Perbaikan Poles u/Lt.8,9,10,11,12 3,200,000
03/02/17 BBK 45 Biaya Service Mesin Buffing 520,000
Ganti Power Supply,On Off Switch Handle,Bolt & Nut For Handle Complete
09/02/17 BBK 48 Upah Harian 30/01-04/02/17 , Perapian Poles u/Lt.10,11,12 2,720,000
17/02/17 BBK 61 Upah kerja Perbaikan Poles u/Lt.10,11,12 Periode : 06-11/02/17 4,000,000
24/02/17 BBK 67 Upah Kerja Perbaikan Deffeet u/Lt. 9,11 , Buffing u/Lt.11,12 Periode : 13-18/02/17 3,500,000
03/03/17 BBK 88 Upah Kerja Poles,Lantai,Nat Skirting dll u/lt/13,14,16,17,18 Periode : 20-25/02/17 6,310,000
10/03/17 BBK 92 Belanja : Kabel Eterna uk.2/2,5 Hitam = 1Roll 420,000
10/03/17 BBK 95 Upah Kerja Poles u/lt.11,15,18,19,20 Periode : 27-28/02/17 , 01-04/03/17 6,600,000
Belanja : Batu,Pad,Mill,Pigment dll Rp. 383.000,-
16/03/17 BBK 104 Upah Kerja Poles Periode : 06-11/03/17 7,250,000
23/03/17 BBK 116 Upah Kerja Nat,Resi,Buffing u/Lt.23,24 Periode : 13-18/03/17 5,750,000
Belanja : Batu 100,2 Thinner Catalis,Steker Karet & Contact = 2 Set Rp. 143.000,-
31/03/17 BBK 131 Upah Kerja Poles Periode : 20-25/03/17 5,500,000
07/04/17 BBK 135 Upah Kerja Poles,Resin,Nat dll u/Lt. 15,16,17,18,20-27 Periode : 27-31/03/17 , 01/04/17 7,000,000
13/04/17 BBK 150 Upah Kerja Poles u/Lt.27,28,29 Periode : 03,05-08/04/17 6,600,000
Belanja : Mill,Pigmen Putih,Cutter dll (Bon : 06,07/04/17 Rp. 242.000,-)
21/04/17 BBK 153 Upah Kerja - Resin & Ngupas Lt. 30 Ngepad - Lt. 21,24 Kamar Mandi 5,350,000
Potong Nat - Ganti Resin u/Lt.13 Periode : 10-15/04/17
28/04/17 BBK 162 Upah Kerja Perbaikan yang Retak Lt. 15 , Ganti Nat Kamar Mandi dll : 17-22/04/17 5,500,000
05/05/17 BBK 165 Upah Kerja Resin,Nat dll u/Lt.17,18,20 Lt.24,25,26,28 Periode : 24-29/04/17 5,350,000
12/05/17 BBK 171 Upah Kerja Resin,Nat dll u/Lt.,20,21,28,29,30 Periode : 02-06/05/17 5,450,000
19/05/17 BBK Kasbon () Pek. Poles , Kupas dll u/Lt.28,29,30,18,17,8,6,5,4 : 08-14/05/17 8,500,000
Belanja : Pad,Stell Wool,Ember dll (Bon : 10/05/17,11/05/17,12/05/17 Rp. 515.000,-)
24/05/17 BBK Kasbon () Pek.Pembersihan , Nat Resin,Poles dll : 15-16,18-20/05/17 4,800,000
05/06/17 BBK 199 Upah Kerja Poles , Pad Resin dll u/lt.21,22,23 Periode : 22-27/05/17 5,000,000
08/06/17 BBK 206 Upah Kerja Poles,Cuci dll u/Lt.24,25,26,28 : 29/05-31/05/17,01-04/17 6,300,000
Belanja : Pad Dongsinng No.300,800,500,1000 16",thineer,Catalis Rp. 284.500
15/06/17 BBK 208 Upah Kerja Poles,Nat Resin u/lt. 5,25,28 , Perbaikan Nat dll u/Lt. 26 : 05-10/06/17 6,000,000
20/06/17 BBK 217 Upah Kerja Perbaikan Lantai yg Baret,Nat yg Nyisil,Poles,Kupas,Resin dll u/lt.22,23,24
Periode : 12 - 17/06/2017 5,200,000
Periode : 19 - 21/06/2017 1,490,000
14/07/17 BBK 223 Upah Kerja Poles,Pad,Kupas dll Periode : 04-08/07/17 u/Lt. 3,4,5 2,190,000
Belanja : Obat Extra.Lakban , Thinner 140,000
21/07/17 BBK 227 Upah Kerja Poles,Baping dll u/lt. 8,9,10,11,25,26 Periode : 12-15/07/17 1,640,000
28/07/17 BBK 236 Upah Kerja Poles,Baping,Pet dll u/Lt. 3,4,5,17,22,23,24 : 17-22/07/17 2,250,000
04/08/17 BBK 241 Upah Kerja Poles,Baping dll u/lt.11,12,13,14,21 : 24-29/07/17 2,540,000
11/08/17 BBK 242 Upah Kerja Poles,Baping,Cuci dll u/Lt.16,18,20,21,25,26,28,29 2,500,000
Periode : 31/07/17 , 01-05-08/17
18/08/17 BBK 245 Upah Kerja Perbaikan Nat Skirting,Poles dll Periode : 07-10/08/17 1,450,000
25/08/17 BBK 248 Upah Kerja Perbaikan Lantai Nat dll u/lt. 28,21,5,4,3 : 14-16/08/17 = 2 tukang 780,000
05/10/17 BBK 313 Upah Kerja Ngobatin Lantai Granite " Area Kamar Mandi " Periode : 26,28,30/09/17 990,000
19/10/17 BBK 337 Upah Kerja Ngobatin Lantai Granite yg ngompol " Area Kamar Mandi " Lt. 20 s/d Lt. 26 1,450,000
Periode : 03-05/10/17 , 06-07/10/17
Upah Kerja Ngobatin Granite yang Ngompol u/Lt. 30,28 Periode : 09,11-12/10/17 = 2 tkg 690,000
27/10/17 BBK 349 Upah Kerja Ngobatin Lantai Kamar Mandi (yg Ngompol) u/Lt.20 - 28 Periode : 16-20/10/17 = 2 tkg 1,150,000
06/11/17 BBK 364 Jono - SCBD Lot 10 - Periode : 23/10-28/10/17 1,500,000
17/11/17 BBK 384 Jono - Proyek SCBD Lot 10- 31/10,03-04/11/17 350,000
17/11/17 BBK 385 Jono-SCBD Lot 10- 06-10/11,11/11/17 1,690,000
30/11/17 BBK 405 Jono - SCBD Lot 10- Perbaikan Area Kamar Mandi u/Lt.30 : 13-15,17/11/17,18/11/17 1,400,000
29/12/17 BBK 442 Jono - SCBD Lot 10- 18-22/11/17 1,300,000
12/01/18 BBK 012 Upah Kerja Perbaikan "Panasin Lantai Kamar Mandi yg Ngompol2 & Potong Nat u/Lt.15 1,000,000
Per : 26-27/12/17 = 1 Tkg, 28-30/12/17 = 2 Tkg
19/01/18 BBK 023 Upah Kerja Perbaikan Resin Nat u/Lt.30 Ngobatin yg Ngompol u/Lt.15,31 per : 09/01/18,10-13/01/18 1,500,000
15/03/18 BBK 095 Upah Kerja Ngobatin H2O Lt.33,32 Per : 26/02/18,27/02/18 280,000
15/03/18 BBK 097 Upah Kerja Ngobatin Granite Area Kamar Mandi Per : 07-10/03/18 = 1 Tukang 600,000
210,080,000
Proyek SCBD Lot 10 :
Sirin
Tgl No. Reff Keterangan
Upah Kerja
07/04/17 BBK 133 Upah Kerja Melukis (1) u/Lt.8,9,10,11,12 Total : 46 Titik x Rp. 95.000,- 4,370,000 35,920,000
28/04/17 BBK 164 Upah Kerja Perbaikan Lantai,Dinding (Melukis) 35 Titik ke 2 2,750,000
05/06/17 BBK 196 Upah Kerja Melukis Dinding u/Lt.17,18 - Lobby Low Zone (32 Titik x Rp. 95.000,-) Ke 3 2,500,000 Sudah dibayarkan oleh 3 Perusahaan Masing 2 Rp. 11.973.500,- (02/11/17)
20/06/17 BBK 216 Upah Kerja Melukis u/Lt 21,22,23 = 44 Titik Ke 4 3,500,000
21/07/17 BBK 224 Upah Kerja Melukis Ke 5 u/Lt.8,9,10,11,12 = 42 Titik 3,500,000
03/08/17 BBK 237 Upah Kerja Melukis ke 6 u/Lt.20,23,24 = 50 Titik 4,250,000
31/08/17 BBK 250 Upah Kerja Melukis ke 7 u/Lt.13,14,15,16,17,22,23,25,26,28,29,30 = 262 Titik 12,500,000
25/09/17 BBK 293 Upah Kerja Melukis ke 8 u/Lt. 3,4,5 = 51 Titik 2,550,000
27/10/17 BBK 347 Upah Kerja Melukis u/Lt. B6,B5,B4,B3, Lt.B2 , Pray Room = 82 Titik 4,000,000
3,500,000
43,420,000
43,420,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
29/03/17 BBK 125 Ishinol Clear Coat G 20 Liter/Pail x Rp. 330.000,- 6,600,000
Ishinol Nendol 5 kg x Rp. 350.000,- 1,750,000
Ishinol Abura Remover 4 Kg x Rp. 350.000,- 1,400,000
u/Treatment Lantai yang rembes Air - Granite Star White Area Toilet
22/05/17 38 Ishinol Clear Coat G 1,5 Liter x Rp. 400.000,= 600,000
05/06/17 BBK 197 Abura Remover = 3 Kg x Rp. 350.000,- 1,050,000
Ishinol Nendol = 2 Kg x Rp. 350.000,- 700,000
ex Stok Kantor : Ishinol Clear Coat G = 5 liter 1,650,000
21/07/17 BBK 229 Ishinol Nendol 4 kg x Rp. 350.000,- 1,400,000
Abura Remover 1 Kg x Rp. 350.000,- 350,000
Ishinol Clear Coat = 1,5 Liter x Rp. 400.000,- 600,000
01/11/17 Ishinol ,abura dll 7,075,000
22/05/17 SJ 000038 Ishinol Clear Coat G = 1,5 Liter x Rp. 330.000,- 495,000
03/06/17 SJ 000059 Ishinol Clear Coat G = 4 Liter x Rp. 330.000,- 1,320,000
19/07/17 SJ 000107 Ishinol Clear Coat G = 6 Liter x Rp. 330.000,- 1,980,000
102,770,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
02/02/17 BBK 113 Sika Top 107 = 4 Set x Rp. 260.000,- 1,040,000
19,520,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
5,515,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
6,743,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
35,165,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
17/05/16 BBK 136 Via PT. Mitra Jaya Makmur Abadi 424,000
* Besi Strip Stainless uk. 304= 5/40/6 = 1 Batang
29/06/16 BBK 182 Plat Strip s/s 304 uk. 6/40x6 mtr = 30 btg x Rp. 460.000,- 13,800,000
10/03/17 BBK 93 Plat Strip s/s 304 uk. 6/40x6 mtr = 2 btg x Rp. 520.000,- 1,040,000
31,456,000
Proyek SCBD Lot 10 : (NO. PROYEK 1)
40,011,500
Proyek SCBD Lot 10 : (NO. PROYEK 1)
Mortar Utama
Tgl No. Reff Keterangan
302
MU 408 970,950
68,569,250
250,393,250 ok
38,500
Mortar Utama
440 400 450
363,000
1,136,850
2,904,000
2,084,500
1,042,250
3,168,000
9,240,000
1,408,000
1,925,000
1,584,000
13,090,000
7,040,000
14,630,000
8,470,000
2,816,000
3,080,000
1,584,000
9,240,000
3,168,000
7,700,000
704,000
8,712,000
24,640,000
3,520,000
5,005,000
11,475,200
4,504,000
1,267,200
5,005,000
1,408,000
12,320,000
1,430,000
6,160,000
Tgl No. Reff Keterangan Qty (10x50) Qty (12x75) Sat Hilti