AALAMI ENGINEERING

SCOPE OF WORK
ORGANIZATION NAME: Bajaj Auto. Ltd

PROJECT TITLE: WAREHOUSE MANAGEMENT SYSTEM

GOAL STATEMENT: Develop Warehouse Management System to handle the material and monitor the production status for same

OBJECTIVE 1: Finalizing Dashboards, Flow chart and Report Formats

ACTIVITIES/TASKS OUTPUTS

1.1 Finalizing WMS Web Portal for Issuing material  Completed dashboard screens for WMS
Required:  Managers can login and update the production plan in advance
 Work order number, BOM against WO, Updating of  Material status can be seen from WMS in real time
monthly plan to warehouse through portal (through  Completed report templates
excel and manual entry) and real time observation of  Completed flow chart of the system approved by Bjaj and AALAMI.
material status (at various stages) which was received
against WO .
 Adding BOM (Fixed) against each Order.
1.2 Finalizing Report and flow of data in the system for
reliability
Required:
 Report format as per AALAMI
 Credentials to be taken from the Managers and
operators in Android Tablets before starting operation
 Any change in Plan (WO) to be recorded in the system
and updated in Android Tablet .

All Rights Reserved by AALAMI ENGINEERING Page | 1


AALAMI ENGINEERING

OBJECTIVE 2: Setting up BARCODE SCANNER AND PRINTER

ACTIVITIES/TASKS OUTPUTS

2.1 Setting up BARCODE SCANNER/STATUS UPDATE  Accurate status update of material in WMS and Server.
Required from AALAMI ENGINEERING.:  High speed data communication from WMS to PMS Server to Android app.
 Providing Android application where you can select
work order number and then update the status of
material through barcode reader or manually through
dropdown ( as desired by bajaj),
 Recording inputs from the android application and
sending data to Server when requested.
 Production count at every production stage to be
captured and uploaded in WMS.

Required from BAJAJ:


 Reliable network connectivity setup specifically for
android application, to enable interference free
dataflow between application and server and software,
as there is no provision for storing data on android app
 Getting Barcode label printed at each stage containing
required information
 Android phone or tab for installing and operating app
(minimum Android OS version must be 5.0 and upper)
2.2 Connectivity from WMS to Android App
Required from AALAMI ENGINEERING .:
 Installation of WMS in BAJAJ server and getting app
ready for communication between both.
 Connecting both application and WMS software to

All Rights Reserved by AALAMI ENGINEERING Page | 2


AALAMI ENGINEERING
server
Required from BAJAJ:
 Space in server for installation of WMS
 Installing any extra wifi router for enhancing data
speed .
 Internet connectivity for WMS and android app

OBJECTIVE 3: Setting up PMS Server in AWS

ACTIVITIES/TASKS OUTPUTS

3.1 Installing WMS software in the server  WMS software displaying real-time values of the material status as given in the
Required from AALAMI ENGINEERING : dashboards approved provided by Bjaj and AALAMI.
 setting up Server as per the demand of the WMS  WMS software generating Excel report when the user exports and prints the
Software reports respectively.
 Copy of WMS software and installing it on the server
while ensuring everything is working according the
required standards

OBJECTIVE 4: Connecting Android tablets to PMS Server

ACTIVITIES/TASKS OUTPUTS

4.1 Setting up Android Tablets and Digital Display of Inventory  Reliable and fast communication of commands and status update from Android
Required from AALAMI ENGINEERING .: Tablets to WMS Server.
 Installing WMS Android application and other  Digital Display of Inventory available in real time.
necessary tools for proper functioning of system
 Ensuring wireless communication between Android
tablets and WMS Server

All Rights Reserved by AALAMI ENGINEERING Page | 3


AALAMI ENGINEERING
Required from BAJAJ:
 Wi-Fi connectivity between Android and server
 Providing Android tablets/Mobile Phone.
 Screens for displaying the inventory (Must be smart tv
which support android and wifi)

OBJECTIVE 5: SAP Integration with WMS Server

ACTIVITIES/TASKS OUTPUTS

5.1 Integration SAP with WMS  Seamless communication between SAP and WMS.
Required from AALAMI ENGINEERING .:
 API to push data to SAP
 Ensuring Integration using API
Required from BAJAJ:
 API to get data from SAP
 Providing support to the development team for
Integration with WMS

OBJECTIVE 6: Integration of Physical Barcode Printer and Reader with WMS

ACTIVITIES/TASKS OUTPUTS

6.1 Integrationof physical Barcode Printer and Reader with  Barcode Printer/Scanner hardware compatible with WMS.
WMS

All Rights Reserved by AALAMI ENGINEERING Page | 4


AALAMI ENGINEERING
Required from AALAMI ENGINEERING .:
 Develop software ecosystem so as to incorporate
Physical printer and reader with WMS.
 Take Hardware related information from BAJAJ
regarding make and model of Printer and Scanner and
then develop WMS software compatible with those
hardware
Required from BAJAJ:
 Hardware make and model of printer/Reader.
 Internet/power/Bluetooth connectivity for integration of
third party hardware with WMS.

OBJECTIVE 7: Uploading Image of Inspection

ACTIVITIES/TASKS OUTPUTS

7.1 To Upload the image of Inspection @ 10 positions  Inspection images at ten positions will be available in WMS.
Required from AALAMI ENGINEERING .:
 Camera abled android application to capture ,store
and upload the image after inspection @ Ten
Positions.
 Display the image captured and upload in WMS.
Required from BAJAJ:
 Seamless Internet Connectivity to upload the image.

All Rights Reserved by AALAMI ENGINEERING Page | 5


AALAMI ENGINEERING
HIGH LEVEL ARCHITECTURE

All Rights Reserved by AALAMI ENGINEERING Page | 6