Kathmandu-Lalitpur Bridge Maintenance Proposal

This proposal outlines a plan to maintain the Kathmandu-Lalitpur Koteshowr Bridge over the Bagmati River. The bridge is a critical transportation route that has deteriorated over the past decade, causing traffic issues. The proposal estimates that maintaining the bridge will cost Rs. 200,000,000 and take 2 months to complete once preparations are made. It details objectives, methodology, cost estimates, timelines, and evaluation plans to guide the maintenance project and alleviate transportation problems for the public.

Uploaded by

Be-fit Be-strong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views8 pages

Kathmandu-Lalitpur Bridge Maintenance Proposal

This proposal outlines a plan to maintain the Kathmandu-Lalitpur Koteshowr Bridge over the Bagmati River. The bridge is a critical transportation route that has deteriorated over the past decade, causing traffic issues. The proposal estimates that maintaining the bridge will cost Rs. 200,000,000 and take 2 months to complete once preparations are made. It details objectives, methodology, cost estimates, timelines, and evaluation plans to guide the maintenance project and alleviate transportation problems for the public.

Uploaded by

Be-fit Be-strong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

A

PROPOSAL

ON

THE MAINTENANCE OF

KATHMANDU-LALITPUR KOTESHOWR

BRIDGE

SUBMITTED BY

SUBASH SHRESTHA

CHIEF CONSULTANT

SUPREME CONSTRUCTION PVT. LTD.

SUBMITTED TO

MINISTRY OF ROAD AND TRANSPORT

KATHMANDU, NEPAL

FEBRUARY 4, 2020
ABSTRACT

This abstract contains brief details about the proposal on the project concerned with the

maintenance of the bridge, connecting Kathmandu and Lalitpur, over Bagmati river located at

Kupondole. The Kathmandu-Lalitpur route is one of the busiest ones. Over the decade, the

condition of the bridge linking Kathmandu and Lalitpur has been degrading. Therefore, the

necessity to enhance the bridge is of prime importance. The main objective of submitting this

proposal is to undertake the project and improve the condition of the bridge. Throughout the

project, road and bridge engineers along with skilled manpower and resources will be utilized to

a huge extent. An approximate budget of Rs. 200,000,000 (Twenty crore rupees) is estimated to

be required for the completion of this project. On the completion of this project, it is expected to

facilitate effective and secure transportation of vehicles and commute of people which has

become a major problem for the public for a significant period due to the current state of the

bridge.
STATEMENT OF PROBLEM

The bridge over Bagmati river joining Kathmandu to Lalitpur is an important route for

transportation as there are many vehicles moving from one town to the other everyday. Over the

past years, the condition of the bridge at Koteshwor has worsened. This has led to the difficulty

in daily commute from Kathmandu to Lalitpur and vice versa. Due to the critical state of the

bridge, other alternative routes which are longer and hectic have to be used. Koteshwor, being of

the busiest places of Kathmandu has a very heavy traffic every day. The traffic is very difficult to

resolve and control. People have to go through uncontrollable and troublesome traffic which

makes them frustrated and angry. The poor quality of the bridge has invited many basic problems

in public transport.

Considering the problems, the Ministry of Road and Transport has decided to carry out

maintenance of the bridge at Koteshwor and has recently published a public notice requesting

qualified consultancies to submit their proposal showing their interest to undertake the project on

the maintenance of the bridge over Bagmati river linking Kathmandu and Lalitpur. In response to

the same public notice, this proposal has been presented. The estimated budget calculated for the

successful accomplishment of the project is Rs. 200,000,000. Once this project is completed, it is

expected to facilitate the transportation route from Kathmandu to Lalitpur and solve the existing

problems of traffic and insecurity of the bridge.


RATIONALE

Since the commuters of both cities, Kathmandu and Lalitpur, are facing a lot of inconvenience

travelling from one city to the other due to the lack of maintenance of the bridge causing it to

become fragile and less secure and although the urban cities are going under the phase of

infrastructural development with general people feeling the lag of progress in transportation

sector, the concerned Ministry has planned to address the public demands and sentiments by

renovating the bridge at Koteshwor within this year and has published a notice asking the

interested consultancies to submit their proposals for handling the project. This proposal aims at

undertaking the responsibility of maintenance of the bridge to overcome the problem of traffic

and providing ease at transport for the public within shortest possible time frame.
OBJECTIVES

The general objective of the present project is to solve the problem of inconvenience felt in

transportation by the public everyday caused by the lack of strong maintenance of the bridge

over Bagmati river at Koteshwor. The project aims to repair vulnerable and damaged bridge

connecting Kathamandu to Lalitpur and enhance its durability. 

Specific Objectives

● To implement new technologies to keep the bridge safe and secured for a long period of

time.

● To provide the local inhabitants of both cities with the facility of better transportation.

● To eliminate the complication in commute faced by the general public.


METHODOLOGY

During the course of this project, locally available materials and resources will be utilized as

much as possible and skilled, trained and experienced human resources and manpower will be

hired to work on the bridge. In case of insufficiency felt in the local resources, raw materials,

laborers and other necessary equipment, hire and purchase of required human resources and

things will be adopted to fulfill the requirements.

COST ESTIMATE

S. No. Items/ Particulars Amount in NRs.


1 Equipment 70,000,000.00
2 Salary 10,000,000.00
3 Transportation 20,000,000.00
4 Electricity 30,000,000.00
5 Food and Beverage 50,000,000.00
6 Others 20,000,000.00
Total 200,000,000.00
TIME MANAGEMENT

S. No. Activities Time Allotment


1 Feasibility Study 3 weeks
2 Report Presentation 2 months
3 Hire and Purchase 3 months
4 Laying Foundation 3 months
5 Finishing Touch 3 months
6 Complete Renovation of Bridge 2 months

EVALUATION/ FOLLOW-UP

In order to get the progress of the work at the project site evaluated from the concerned

authorities, progress report will be prepared and submitted on a regular basis at the interval of 1

month. On some special occasions, seminars must be organized in order to present the progress

report in the presence of the authorities.


WORKS CITED
1. Henry, SG (2018) Highway Bridge Maintenance Planning and Scheduling
2. Shulte, Bret. "Putting a Price on Maintenance." US News & World Report, vol.
142, no. 17, 14 May 2007, p. 37. Ebsco, Access no: 24984616.