1 Name of High Level Bridge - Construction Of Bridge Over Ajay River Between Basbariya Sarwan Block And
Samlapur Sarath Block Under Sarwan Block, Deoghar District.
8 Contents
TABLE OF CONTENT
1. Executive Summary
1.1. Name of Work
1.2. Scope of Present Work
1.3. Location of Bridge Site
1.4. Advantage of this Bridge
1.5. Salient Features of the Project
2. Methodology
2.1. Reconnaissance Survey
2.2. Topography Survey
2.3. Determination of Length of Bridge
2.4. Width of Carriageway
2.5. Finalization of Span Arrangement
2.6. Vertical Clearance above HFL
2.7. Determination of Afflux
2.8. Determination of Linear Waterway
2.9. Design Discharge
2.10.Discharge by Rational Method
2.11.Discharge by Empirical Method
2.12.Discharge by Manning’s Formula
2.13.Rugosity Co-efficient
3. Sub-Soil Investigation
3.1. Field Work (Boring/Drilling) at site
3.2. Laboratory Testing
3.3. Interpretation and Recommendation
3.4. Selection of Type of Foundation
3.5. Sub-Structure
3.6. Determination of Type of Piers
3.7. Superstructure
3.8. Expansion Joints
3.9. Bearing
3.10. Height of Approach Road in the Vicinity of Bridge
3.11. Requirement of Curve Design for Approach Road
3.12.Design Speed
3.13.Permissible Gradient
3.14.Grade Compensation
3.15.Extra Widening at Curve
3.16.Camber
3.17.Horizontal Curve
3.18.Element of Circular Curve as given in GAD
3.19.Superelevation
3.20.Vertical Curve
3.21.Minimum Length of Approach where no curve is provided
3.22.Approach Road Protection
3.23.Approach Embankment subjected to Flooding but where the
velocity of flow is insignificant (not exceeding 1m/s) to cause Erosion
3.24.Approach Embankment which are under direct and frontal attack of
river flow or otherwise subjected to velocity of flow exceeding 1 m/s
3.25.Approach to bridges located in the bed of meandering rivers
with large khadir width requiring guide bunds
3.26.Design Criteria as per para 5.3 are as follows
3.27.Side slope
3.28.Slope Protection
3.29.Pitching on the river side slope
3.30.Thickness of Pitching
3.31.Shape of Stones
3.32.Placing of Stones
3.33.Filter Design
3.34.Toe Protection
4. Preparation of General Arrangement of Drawing
5. Preparation of Detailed Design and Drawing
6. Preparation of Bills of Quantities and Quantity Estimation
7. List of Enclosures in this Report
SL
Item of Works Description
No
1 Bridge Length : 201.24m C/C of Expansion Gap
9 HFL : RL 104.690 m
2.0 Methodology
The methodology adopted for preparation of Detailed Design and Drawing has been discussed here for
making the Design and Drawing illustrative:
2.1 Reconnaissance Survey
The team of engineers and the officials that visited the site, carried out reconnaissance survey to know all
the relevant information regarding the following:
Another parameter for deciding the span arrangement is the height of approach road w.r.t. the HFL. In the
present case, the existing ground level at both end of the river bank is almost at the same level as of HFL.
Now, considering the differences between HFL & LBL, which is 5.121 m, and adding 1.5m vertical
clearance, the span length should be about 1.5 * 6.621m to 2* 6.621m i.e., 9.9315m to 13.242 m.
Secondly, the height of approach road will be considerably higher requiring wider land requirement at the
junction of the abutment at both end or guard wall of sufficient height to reduce the land requirement.
Therefore, we have adopted span of 21.75 m effective span, which is 22.36 m in total, in order to make
the bridge an economical one.
In this case 9 nos. of equal span of 21.75 m effective span each has been adopted.
Thus although the time consumed in determining the catchment area, is more using Google earth, the
accuracy is more too.
Another point is computation of catchment area using graph or plain meter and sophisticated software like
Global mapper. The sophisticated software like Global Mapper gives much accurate result.
The HFL is ascertained from watermarks, if available or the permanent objects on the banks supplemented
by local enquiry from nearby inhabitants as to the highest flood levels reached during their living memory.
The others parameters is described in the above report has been computed and enclosed in the
Hydrological calculation section. The alternate method is rational method, which is described here too,
although this should be used only for case where catchment area is less than 25 sq.km.
Q= 0.028* f *P * A * tc
S = energy slope which may be taken equal to the bed slope measured over a reasonably long reach
n = Rugosity coefficient
For value of n, following Table is used. Judgment and experience are necessary in selecting a proper value
of n for a given stream.
1 Clean, Straight bank, full stage, no rifts or deep poles 0.025 0.0275 0.03 0.033
2 Same as ( 1 ), but some weeds and stones 0.03 0.033 0.035 0.04
3 Winding, some pools and shoals , clean 0.035 0.04 0.045 0.05
λ is a function of the size, shape and roughness of the stream and is called its conveyance factor.
Thus the discharge carrying capacity of a stream depends on its conveyance factor and slope.
The boring work using Shell and Auger method commenced in accordance with IS: 1892-1979, which
consists of boring of 150 mm dia borehole and conducting Standard Penetration Test (SPT) in accordance
with IS: 2131- 1981 at 1.5 m interval by connecting a split spoon sampler to ‘A ‘ rods and driving it by 45
cm. The numbers of blows for each 15 cm of penetration were recorded. The numbers of blow required to
penetrate ting the initial 15 cm of the split spoon for seating the sampler is ignored due to the possible
presence of loose materials. The cumulative numbers of blow to penetrate the balance 30 cm interval is
termed as ‘N’ value. The ‘N’ values are presented on the bore log of each bore hole. Refusal to further
boring penetration was considered when ‘N’ value exceed 100 or when practical refusal to further
penetration was encountered.
Disturbed soil collected in the SPT sampler was preserved in the polythene covers and transported to
laboratory for determining the soil properties by conducting different laboratory testing.
In the present case, detailed sub soil investigation report has been enclosed in Annexure- IV.
3.4 Selection of Type of Foundation:
The foundation has to be provided minimum 3m – 4m below maximum scour depth. In the present case,
the computed MSL for Abutment is 96.482 m, however the non-erodible hard stratum is found within a
depth of 11m depth from GL. The ground level near abutment A-1 and A-2 is 101.268 m , and 100.804 m.
In such situation providing Open/Pile foundation below non erodible stratum for A-1 & A-2 is practically
possible hence we have adopted Open/Pile foundation for abutment A-1 & A-2.
3.5 Substructure:
Substructure include those portions of a bridge which are above the foundation which includes piers,
abutments and piers caps, dirt walls, return , wing walls etc. But exclude bearings and superstructure. It
can be built of brick/stone masonry, plain/reinforced/Prestressed concrete. Steel selection of particular
type substructure depends upon the span and type of superstructure, the height of substructure,
availability of construction materials and construction equipment, period and time of construction and
above all on overall economy.
Substructure shall be designed to withstand the loads and forces as specified in IRC: 6, the most
combination of forces and factors of safety shall be as specified in IRC: 78. For allowable stresses and
other design requirements relevant IRC codes depending upon the type of construction materials shall be
followed.
In the present case, there is no pier in the bridge. However, the abutment has been adopted as well type.
3.7 Superstructure:
It is the superstructure of a bridge that directly supports the traffic and facilities its smooth uninterrupted
passage over natural/manmade barriers like rivers, cracks, railways, roads etc. by transmitting the loads
and forces coming over it to the foundation through the bearings and superstructure.
Consistent with economy and local availability of the materials, labour and technology for a particular type
of superstructure selections may have to be made out of the following options.
a. Masonry
b. Reinforced cement concrete
c. Prestressed concrete
d. Steel
e. Composite construction which is a combination of any of the above.
In Plain areas, Road Subgrade elevation in fill sections is so fixed the difference between the formation
level (top of subgrade) and highest water table / highest flood level is not less than 0.6 to 1 m and
between formation level and ground level not less than 1 m
In Cut and Fill sections and hill roads where it may be difficult to satisfy the said 0.6 to 1 m criteria, drains
may be provided to lower down the water table.
In the rural roads, the following compositions followed as a common practice in Jharkhand State:
Prime Coat
Tack Coat
Premix
Seal Coat
The altogether thickness can be assumed as 350 mm.
Taking camber as 2.5 %, the difference in level between formation level at center and formation level at
edge of carriageway for 7.5 m carriageway comes as 94 mm.
Thus the minimum height at center of carriageway from the HFL can be taken as 2175+100+1500=
3775mm.
Therefore, the minimum height at center of carriageway from HFL is taken as 3.775 m in the Present case.
The Bridge sites undertaken for construction are selected at the Government Level and the Consultants
have no role in selection of alignment. The site selected has normally earthen or metallic road where there
is no traffic movement. In most of the cases, the available land width is insufficient even to accommodate
the abutment width of 8.45m. The connecting approach does not have any geometry in accordance with
the provisions of the Road Design Standards. There is no provision for land acquisition too. In such
situation, the design of road geometrics has no significance, as the road has to follow within the available
land width only.
However, the design has been done based upon the given criteria as illustrated below:
3.12 Design Speed:
Choice of Design Speed depends on the function of road and also terrain conditions. It is basic parameter
which determines all other geometric design features. Design speed for various classes of roads is given in
table shown below (taken from IRC SP: 20- 2002).
Rural Roads
50 40 40 35 25 20 20 20
(ODR and VR)
The design speed is also dependent on the radius of horizontal curve. The maximum permissible
Superelevation considered for plain and rolling terrain is 7%, while for hilly terrain it is 10%. The
coefficient of tyre friction with road way is considered as 0.15
Thus the relationship between the velocity of vehicle (in Kmph) and permissible Radius of Horizontal
Curve is V2/127R = 0.22 for Plain & rolling terrain.
And V2/127R = 0.25 for hilly terrain.
3.13 Permissible Gradient:
Indian Road Congress has laid down standard for gradient to be adopted in different terrains. Gradient for
different Terrains (as taken from IRC SP 20-2002) are given below.
3.3% 5% 6%
1 Plain or Rolling Terrain
(1 in 30) (1 in 20) (1 in 16.7)
Hence, for Plain Terrain desirable (Limiting) gradient as per above table shall be 2.5% (1 in 40).
The amount by which the gradient should be eased to offset the extra tractive force involved at horizontal
curves is known as ‘grade compensation’. This should be calculated by following formula (taken from IRC:
38-1988)
The above extra widening has been proposed considering lane width of 3.75m. In our case, the lane width
is taken as 7.5m, which is 2 lane.
Hence extra widening of carriageway width at curve is taken as 0.6m, which is applied equally on both
sides of carriageway.
3.16 Camber:
Generally, undivided roads on straight should be provided with a crown in the middle and surface on
either side sloping towards edge. However on hill roads this may not be possible. Camber values for
different Road surface types should be recommended from Table 2.11 of IRC SP: 20-2002, which is shown
below:
Camber (Percentage)
Surface Type Low Rainfall ( Annual High Rainfall ( Annual Rainfall >
Rainfall<1000 mm) 1000 mm)
From the above table, for the camber for bridge portion is taken as 2.5% and the same is followed for
approach road which is only 100 m in Basbariya side and 100 m in Samlapur side.
3.17 Horizontal Curve:
On Horizontal curve, the centrifugal force is balanced by the combined effects of Superelevation and side
friction. So, from clause 9.4.1 of IRC 73-1980 the basic equation for this condition of equilibrium follow
as:
Or,
Where,
v = vehicle speed in meter per second
V = vehicle speed in Kmph
g = acceleration due to gravity in m/sec²
e = Superelevation ratio in meter per meter
f = coefficient of side friction between vehicle tyres and pavement (taken as 0.15)
R = Radius of curvature in meter
For Rolling and Plain terrain, the maximum value of e shall be 0.07
Hence, for Plain & Rolling terrain,
Thus,
But the value of Radius calculated above must not be less than the minimum permissible radius. Table
below from clause 9.4 of IRC 73 -1980 shows the minimum radius of horizontal curve for different terrain
conditions.
Note: Absolute minimum and ruling minimum radii corresponds to minimum design speed and ruling
design speed.
As per clause 4.4.3 of IRC: 38-1988, the minimum radius of curve shall not be less than 26.0m, where
truck also ply on road.
However, the minimum radius of curve of 15.0m for design speed of 20 Kmph cam be provided as per
Table 3 of IRC: 38-1988.
3.18 Element of Circular Curve as given in GAD:
T.P.: This Point denotes the start of transition curve. In the present case, since transition curve has not
been provided, it represents the starting chainage of circular curve.
P.T.: This Point denotes the end of transition curve. In the present case, since transition curve has not
been provided, it represents the end chainage of circular curve.
Δ: Deflection angle of curve = (180 X L)/ (π X R)
Ts: Tangent Distance = R tan (Δ/2)
Es: Apex Distance = R [sec (Δ/2)-1]
Lc: Length of Circular Curve
Rc: Radius of Circular Curve
3.19 Superelevation:
Superelevation required on horizontal curves should be calculated from following formula. This assumes
that centrifugal force corresponding to 75% the design speed is balanced by superelevation and rest
counteracted by side friction.
Where,
e = Superelevation in meter per meter
V = Speed in Km/h
R = Radius in meter
In the present case, the design velocity has been computed using superelevation rate of 7%, using the
above formula and taking 75% Design velocity as 80.0 Kmph, e comes as 6.8%. Hence we have adopted
e as 7%. The superelevation shall be provided by the way increasing or decreasing the height of pedestal
below the superstructure.
The following Table (as per clause 5.3 of IRC 38-1988) describes the radii of horizontal curves for different
camber rates beyond which no superelevation is required.
Due to Changes in grade in the vertical alignment of the highway vertical curves at the intersection of the
different grades will be provided in the design so as to smoothen the vertical profile resulting in easing off
the changes in the gradients for the fast moving vehicles. Both summit curves and valley curves will be
introduced as per clause 2.11.3 of IRC SP: 20-2002.
The minimum length of vertical curve (as per Table-20 of IRC SP: 20-2002) is given here:
Design Speed upto (in Maximum Gradient Changes not Minimum Length of Curve (in
Kmph) requiring Vertical curves (in %) meter)
35 1.5 15
40 1.2 20
50 1.0 30
The length of summit curve and valley curves (L) is guided by & the sight distance and the deviation angle
(N). The sight Distance as per clause 2.9 of IRC SP: 20-2002 is given below:
Sight Distance (meter)
Speed (kmph)
Stopping Intermediate Stopping
20 20 40 -
25 25 50 -
30 30 60 -
35 40 80 -
40 45 90 165
50 60 120 235
The formula for determination of Length of Curve as given in IRC SP: 23-1993 has been presented here,
b. When the length of the curve is less than the sight distance
b. When the length of the curve is less than the sight distance
Where,
N= Deviation angle
L= Length of Vertical Curves
S= Stopping Sight Distance
Here, a is the algebraic difference in grade expressed in percentage
Equation of Vertical Curve can be expressed as:
y=x²/a
Where, y= ordinate of vertical curve at a distance of x
And a=a constant = 2L/N; L & N is defined as earlier
Thus maximum difference between horizontal and apex of curve at middle can be expressed as
m=L²/8R or LN/8 (SP: 20-2002)
3.21 Minimum length of approach where no curve is provided:
As per clause 120.1 of IRC: 5-1998, the minimum length of approach which should be provided in straight
reach beyond bridge is 15m.
3.22 Approach Road Protection:
Nature of protection to be provided can be divided into the following broad categories
3.23 Approach Embankments subjected to flooding but where the velocity of flow is
insignificant (not exceeding 1m/s) to cause Erosion.
These cases occur where river flows flat terrain with large spills. The thickness of slope pitching, size of
stone, its gradation and filter design have been worked out as per para 5.3 of IRC 89-1997. However, the
designed value arrived at should not fall below those indicated in figure 8.1(A) or 8.1(B). The length of
approach should begin and end at a stable section on the approach subject to a minimum of 15 m.
3.24 Approach Embankments which are under direct and frontal attack of river flow or
otherwise subjected to velocity of flow exceeding 1 m/s.
These cases occur where the flow is confined within banks during ordinary floods but spills during high
floods without meandering.
3.25 Approaches to bridges located in the bed of meandering rivers with the large khadir
width requiring guide bunds.
These cases pertained to river which meander in alluvial plains and have large khadir widths even under
ordinary flood conditions.
3.26 Design criteria as per para 5.3 are as follows
Free Board:
The free board to the top of approach protection above the water level is generally kept at 1.5m to 1.8m.
Side slope of the road protection may be determined from consideration of slope stability of embankments
and from hydraulic gradient consideration. Generally a side slope of 2(H):1(V) is adopted predominantly
cohesionless materials. (Here 1.5H: 1V is adopted, keeping in view of land availability).
Upto 2.5 30 40 30 40
3.0 30 40 30 40
3.5 35 59 30 40
4.0 45 126 35 59
4.5 57 257 44 118
5.0 71 497 54 218
3.30 Thickness of Pitching:
t= 0.06*Q 1/3
Where, Q= design discharge in m3/s
The thickness of stone pitching computed from the above formula shall be subject to an upper limit of 1m
and lower limit of 0.3 m.
3.31 Shape of Stones:
Quarry stones are preferable to round stones as the later roll off easily. Angular stone fit into each other
better and have well inter – locking characteristics.
3.32 Placing of Stones:
The pattern of laying shall be such that the joints are broken and the voids are minimum by packing with
spalls wherever necessary and the top surface is as smooth as possible.
3.33 Filter Design:
Filter shall consist of sound gravel, stone, jhama (overburnt) brick ballast and coarse sand. The filter may
be provided in one or more layers satisfying the following criteria:
In the foregoing, D15 means the size of that sieve which allows 15% by weight of the filter material to
pass through it and similar is the meaning of D50 and D85.
3.34 Toe Protection:
Launching apron shall be provided for the protection of toe and it shall form a continuous flexible cover
over the slope of the possible scour hole in continuation of pitching upto the point of deepest scour. The
size of the stone required for launching apron to resist mean design velocity is given by the formula:
v = 4.893 * (d) ½,
Where v = mean design velocity in m/s.
d= equivalent diameter of stone in meter.
For Velocities upto 5 m/s, the size and the weight of stone is also given in the table 5.2 of IRC 89- 1997
which is given below.
Upto 2.5 30 40
3.0 38 76
3.5 51 184
4.0 67 417
4.5 85 852
5.0 104 1561
However, considering that this scheme is bridge project and construction of road shall follow once after
completion of bridge, and the huge cost is involved in the protection work in accordance with the codal
provision, only 600mm thickness boulder pitching has been provided for approach road which are under
influence of HFL, and a side slope of 1.5H: 1V has been provided for scarcity of land availability.
Based upon the above methodology, a general Arrangement Drawing (GAD) is prepared showing the
Formation level, Soffit Level, HFL, Ground level, Span arrangement, Length of Bridge, Type of Foundation.
Based upon the standard method of computing volume, quantity estimation of different components of the
bridge has been done. The finished rate of items has been taken from the SOR of Road Construction
department (Including National Highway Wing), Govt. of Jharkhand and cost of the bridge has been
worked out.
7 Working Drawings
ABSTRACT OF COST
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block
Godda District and Rampur Village Of Lakhanpur Panchayat In Dumka District Under
Ramgarh Block, Dumka District.
SOR (2018-2019)
PREVIOUS REVISED
DEVIATION
SL. No. DESCRIPTION
AMOUNT
COST (In Rs.) COST (In Rs.)
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
A BRIDGE PART
(I) Depth upto 3 m cum 63.00 2517.46 158599.98 63.00 3064.14 193040.82 34440.84
(II) Depth upto 3 m to 6 m cum 73.00 468.05 34167.65 73.00 816.48 59603.04 25435.39
A Granular Material cum 536.00 153.18 82104.48 536.00 153.18 82104.48 0.00
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
(RCC Grade M35 using Concrete Mixer) cum 10730.00 405.30 4348869.00 10730.00 328.10 3520513.00 828356.00
PCC Grade M 15 cum 3687.00 30.01 110646.87 3687.00 24.39 89925.93 20720.94
PCC Grade M 25 cum 4711.00 501.25 2361388.75 4711.00 407.61 1920250.71 441138.04
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6
nominal mix in foundation with crushed stone
aggregate 40mm nominal size mechanically mixed,
9 12.4
placed in foudation and compacted by vibration
including curing for 14 days.)
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
PCC Grade M15 cum 3706.00 8.24 30537.44 3706.00 8.24 30537.44 0.00
(p) Height Upto 5m cum 4994.00 458.13 2287901.22 4994.00 458.13 2287901.22 0.00
(q) Height between 5m to 10m cum 5158.00 121.00 624118.00 5158.00 121.00 624118.00 0.00
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
RCC Grade M30 For T- Beam & Slab cum 5960.00 1426.22 8500271.20 5960.00 1426.22 8500271.20 0.00
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
for Grading - I Material cum 1060 337.5 357750 1060 2250 2385000 2027250.00
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur
Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
PREVIOUS REVISED
DEVIATION
SL. NH Sch.
DESCRIPTION UNIT RATE QTY AMOUNT RATE QTY AMOUNT
No. Item No.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
A BRIDGE PART
Excavation for structures in ordinary soil (Earth work in excavation
of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and
1 12.1 (I) B bockfilling with approved material) Mechanical means
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Back filling behind abutment, wing wall and return wall complete as
3 13.9A per drawing and technical specification
Pier Pile P10 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P11 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P12 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P13 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Total 62.58
Bored cast-in-situ M35 grade RCC Pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000m. (Pile diameter
5 12.25 1200mm)
Total 405.30
Pile Load Test on Single vertical Pile in accordance with IS: 2911
6 12.37 MT 1 1.5*362 MT on 1 Pile from Pier Design 543.00 543.00
(Part-IV)
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Total 501.25
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix
in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed, placed in foudation and compacted by vibration
9 12.4 including curing for 14 days.)
PCC below Abutment Foundation - A1 cum 1 10.40 8.65 0.1 9.00 9.00
PCC below Pier Foundation - P1 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P2 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P3 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P4 cum 1 10.20 10.20 0.1 10.40 10.40
Abutment-A1
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Between Heel & Slab cum 1 1.20 8.45 1.50 15.21 15.21
Excavation= 468.05
Pier - P1
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 2.000 9.82 9.82
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 536.54
Pier - P2
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.500 7.36 7.36
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 478.22
Pier - P3
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.000 4.91 4.91
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 419.90
Pier - P4
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.000 4.91 4.91
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Excavation= 419.90
Total 1178.68
PCC M-15 Grade Levelling Course below Approach Slab complete
11 14.10 as per drawing and Technical specification cum 2 3.50 7.850 0.15 4.12 8.24
Between Heel & Slab cum 1 1.20 8.45 2.50 25.35 25.35
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 5.000 24.54 24.54
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.500 22.09 22.09
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Total 1193.28
Plain /Reinforced Cement Concrete in Sub-Structure complete as per
drawing and technical specifications (RCC M 25 using concrete
13.5 F (p) mixer)
13
Case I
p Height Upto 5m
Abutment (A1)
Abutment (A2)
Pier (P1)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.198 5.88 5.88
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier (P2)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 3.370 16.54 16.54
Pier (P3)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.017 0.66 0.66
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.948 24.29 24.29
Pier (P4)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 5.000 24.54 24.54
Pier (P5)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 5.000 15.71 15.71
Pier (P6)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 3.528 11.08 11.08
Pier (P7)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.310 7.26 7.26
Pier (P8)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.077 6.53 6.53
Pier (P9)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.948 6.12 6.12
Pier (P10)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.720 5.40 5.40
Pier (P11)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.363 4.28 4.28
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier (P12)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.810 2.54 2.54
Pier (P13)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.478 1.50 1.50
Total 458.13
Pier (P1)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P2)
Pier Cap (Tapered) cum 1 37.928 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P3)
Pier Cap (Tapered) cum 1 37.928 (Ar. x Ht.) 0.316 11.99 11.99
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P4)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.344 1.69 1.69
Pier (P5)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.163 0.51 0.51
Pier (P6)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. x Ht.) 0.000 0.00 0.00
Pier (P7)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P8)
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P9)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P10)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P11)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P12)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P13)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Total 98.45
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of 1V:20H towards
drawing face. Complete as per drawing and technical specification.
14 13.8
In Shaft
Each 1 61.00 61.00
In return Wall
Each 2 30.00 60.00
Total :
121.00
Furnishing and placing Reinforcement/ Prestressed cement concrete in
Super-Structure a per drawing and Technical specification, RCC
14.1C Grade M 30
15 Case 1 (ii) RCC T-Beam & Slab (Height between 5m to 10m)
q
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Total
1426.22
Approach Slab (M30 Grade) including reinforcement and formwork
complete as per drawing and Technical specification.
16 14.11 cum 2 3.5 7.8 0.3 8.19 16.38
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Providing and laying Pitching on slopes laid over prepared filter
media including boulder apron laid dry in front of toe of embankment
complete as per drawing and technical specifications
26 15.4A
Stone /boulder
Sub Total
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Seal Coat - Type B (Providing and laying of premix sand seal coat
with HMP of appropriate capacity not less than 75 tonnes/hours using
36 5.12 (ii) crushed stone chipping 6.7mm size and penetration bitumen of sqm 1 300.00 4.10 (Area) 1230.00 1230.00
suitable grade.
Length of Guard Wall toward Rampur Side = cum 2 50.00 3.23 161.50 323.000
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 3.23 80.75 161.500
Total 484.500
Sand filling in foundation trenches as per Drawing and Technical
39 12.3 specification cum
` Length of Guard Wall toward Rampur Side = cum 2 50.00 2.09 0.15 15.68 31.360
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 2.09 0.15 7.84 15.680
Total 47.040
Back filling behind abutment, wing wall and return wall complete as
40 13.9A per drawing and technical specification
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.99 99.25 198.500
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.99 49.63 99.260
Total 297.760
Plain/Reinforced cement concrete in Foundation complete as per
drawing and technical specification, (PCC Grade M15 )
41 12.8A
Length of Guard Wall toward Rampur Side = cum 2 50.00 0.84 41.80 83.600
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 0.84 20.90 41.800
Total 125.400
Stone masonry work in cement mortar 1:3 for foundation complete
42 12.7 (b) as per drawing and technical specifications.
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.25 62.25 124.500
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.25 31.13 62.260
Total 186.760
Stone masonry work in cement mortar 1:3 for substructure complete
as per drawing and technical specifications.
43 13.4 A
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.77 88.25 176.500
(L x Avg
Area)
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.77 44.13 88.260
Total 264.760
Providing weep hole in Brick, masonary/Plain/Reinforced Cement
Concrete abutment, wing wall/returnwall with 100mm dia AC pipe,
extending through the full widt of the structure with slope of 1V:20H
towards drawing foce. Complete as per drawing and Technical
44 13.8 specification. Each 2 128.00 256
Total 25.39
Total 11.250
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
A BRIDGE PART
Excavation for structures in ordinary soil (Earth work in excavation
of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and
1 12.1 (I) B bockfilling with approved material) Mechanical means
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Back filling behind abutment, wing wall and return wall complete as
3 13.9A per drawing and technical specification
Pier Pile P10 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P11 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P12 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Pier Pile P13 (upto S/R) MT 4 8.000 3.958 0.006 1.49 5.96
Total 50.66
Bored cast-in-situ M35 grade RCC Pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000m. (Pile diameter
5 12.25 1200mm)
Total 328.10
Pile Load Test on Single vertical Pile in accordance with IS: 2911
6 12.37 MT 1 1.5*362 MT on 1 Pile from Pier Design 543.00 543.00
(Part-IV)
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Cement Concrete for Reinforced Concrete in Pile Cap complete as per
drawing and Technical Specification (RCC Grade M25, using
8 12.38 B (i) Concrete Mixer)
Total 407.61
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix
in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed, placed in foudation and compacted by vibration
9 12.4 including curing for 14 days.)
PCC below Abutment Foundation - A1 cum 1 10.40 8.65 0.1 9.00 9.00
PCC below Pier Foundation - P1 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P2 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P3 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P4 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P5 cum 1 10.20 10.20 0.1 10.40 10.40
PCC below Pier Foundation - P6 cum 1 10.20 10.20 0.1 10.40 10.40
Abutment-A1
Between Heel & Slab cum 1 1.20 8.45 1.50 15.21 15.21
Excavation= 468.05
Pier - P1
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 2.000 9.82 9.82
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 536.54
Pier - P2
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.500 7.36 7.36
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 478.22
Pier - P3
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.000 4.91 4.91
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 419.90
Pier - P4
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.000 4.91 4.91
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Excavation= 419.90
Total 1178.68
PCC M-15 Grade Levelling Course below Approach Slab complete
11 14.10 as per drawing and Technical specification cum 2 3.50 7.850 0.15 4.12 8.24
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Between Heel & Slab cum 1 1.20 8.45 2.50 25.35 25.35
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 5.000 24.54 24.54
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.500 22.09 22.09
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 4.000 19.63 19.63
Pier Foundation Tapered cum 1 134.290 (Ar. x Ht.) 0.233 31.33 31.33
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Pier Shaft Circular cum 1 3.142 (Ar. X Ht.) 0.300 0.94 0.94
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Total 1653.32
Plain /Reinforced Cement Concrete in Sub-Structure complete as per
drawing and technical specifications (RCC M 25 using concrete
13.5 F (p) mixer)
13
Case I
p Height Upto 5m
Abutment (A1)
Abutment (A2)
Pier (P1)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 1.198 5.88 5.88
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier (P2)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 3.370 16.54 16.54
Pier (P3)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.017 0.66 0.66
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.948 24.29 24.29
Pier (P4)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 5.000 24.54 24.54
Pier (P5)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 5.000 15.71 15.71
Pier (P6)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 3.528 11.08 11.08
Pier (P7)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.310 7.26 7.26
Pier (P8)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.077 6.53 6.53
Pier (P9)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.948 6.12 6.12
Pier (P10)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.720 5.40 5.40
Pier (P11)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.363 4.28 4.28
Pier (P12)
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.810 2.54 2.54
Pier (P13)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.478 1.50 1.50
Total 458.13
Pier (P1)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P2)
Pier Cap (Tapered) cum 1 37.928 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P3)
Pier Cap (Tapered) cum 1 37.928 (Ar. x Ht.) 0.316 11.99 11.99
Pier Shaft Circular cum 1 4.909 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P4)
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.333 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.344 1.69 1.69
Pier (P5)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.333 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.163 0.51 0.51
Pier (P6)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. x Ht.) 0.000 0.00 0.00
Pier (P7)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P8)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P9)
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P10)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P11)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P12)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Pier (P13)
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.000 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.000 0.00 0.00
Total 98.45
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of 1V:20H towards
drawing face. Complete as per drawing and technical specification.
14 13.8
In Shaft
Each 1 61.00 61.00
In return Wall
Each 2 30.00 60.00
Total :
121.00
Furnishing and placing Reinforcement/ Prestressed cement concrete in
Super-Structure a per drawing and Technical specification, RCC
14.1C Grade M 30
15 Case 1 (ii) RCC T-Beam & Slab (Height between 5m to 10m)
q
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Strip Seal Expansion Joint ( providing and laying of a strip seal
expansion joint catering to maximum horizontal movement upto
70mm, complete as per approved drawings and standard specifications
to be installed by the manufacturer/supplier or their authorised
representative ensuring complaince to the manufacturer's instructions
17 14.22 for installation. Per m 15 8.45 8.450 126.75
Seal Coat - Type B (Providing and laying of premix sand seal coat
with HMP of appropriate capacity not less than 75 tonnes/hours using
25 5.12 (ii) crushed stone chipping 6.7mm size and penetration bitumen of Sqm 1 313.04 7.50 (Area) 2347.80 0.000
suitable grade.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Stone /boulder
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Seal Coat - Type B (Providing and laying of premix sand seal coat
with HMP of appropriate capacity not less than 75 tonnes/hours using
36 5.12 (ii) crushed stone chipping 6.7mm size and penetration bitumen of sqm 1 2000.00 4.10 (Area) 8200.00 8200.00
suitable grade.
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Providing and laying Pitching on slopes laid over prepared filter
media including boulder apron laid dry in front of toe of embankment
complete as per drawing and technical specifications. (Stone / Boulder
37 15.4 A )
Length of Guard Wall toward Rampur Side = cum 2 50.00 3.23 161.50 323.000
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 3.23 80.75 161.500
Total 484.500
Sand filling in foundation trenches as per Drawing and Technical
39 12.3 specification cum
` Length of Guard Wall toward Rampur Side = cum 2 50.00 2.09 0.15 15.68 31.360
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 2.09 0.15 7.84 15.680
Total 47.040
Back filling behind abutment, wing wall and return wall complete as
40 13.9A per drawing and technical specification
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.99 99.25 198.500
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.99 49.63 99.260
Total 297.760
Plain/Reinforced cement concrete in Foundation complete as per
drawing and technical specification, (PCC Grade M15 )
41 12.8A
Length of Guard Wall toward Rampur Side = cum 2 50.00 0.84 41.80 83.600
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 0.84 20.90 41.800
Total 125.400
Stone masonry work in cement mortar 1:3 for foundation complete
42 12.7 (b) as per drawing and technical specifications.
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.25 62.25 124.500
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.25 31.13 62.260
Total 186.760
Stone masonry work in cement mortar 1:3 for substructure complete
as per drawing and technical specifications.
43 13.4 A
Length of Guard Wall toward Rampur Side = cum 2 50.00 1.77 88.25 176.500
(L x Avg
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 1.77 44.13 88.260
Total 264.760
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of
Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
Providing weep hole in Brick, masonary/Plain/Reinforced Cement
Concrete abutment, wing wall/returnwall with 100mm dia AC pipe,
extending through the full widt of the structure with slope of 1V:20H
towards drawing foce. Complete as per drawing and Technical
44 13.8 specification. Each 2 128.00 256
Total 25.39
Total 11.250
535167343.xlsx QTY Deviation
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur Panchayat In Dumka District Under Ramgarh Block,
Dumka District.
QUANTITY CALCULATION
Abutment(A1) cum 1 11.00 9.25 3.00 305.25 305.25 1 11.00 9.25 3.00 305.25 305.25
Abutment(A2) cum 1 5.90 9.50 2.20 123.31 123.31 1 5.90 9.50 2.20 123.31 123.31
Pier - P1 cum 1 10.80 10.80 3.00 349.92 349.92 1 10.80 10.80 3.00 349.92 349.92
Pier - P2 cum 1 10.80 10.80 3.00 349.92 349.92 1 10.80 10.80 3.00 349.92 349.92
Pier - P3 cum 1 10.80 10.80 3.00 349.92 349.92 1 10.80 10.80 3.00 349.92 349.92
Pier - P4 cum 1 10.80 10.80 3.00 349.92 349.92 1 10.80 10.80 3.00 349.92 349.92
Pier - P5 cum 1 10.80 10.80 3.00 349.92 349.92 1 5.90 5.90 2.20 76.58 76.58
Pier - P6 cum 1 10.80 10.80 3.00 349.92 349.92 1 5.90 5.90 2.20 76.58 76.58
Pier - P7 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P8 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P9 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P10 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P11 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P12 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Pier - P13 cum 1 5.90 5.90 2.20 76.58 76.58 1 5.90 5.90 2.20 76.58 76.58
Abutment(A1) cum 1 11.00 9.25 0.00 0.00 0 1 11.00 9.25 0.00 0.00 0.00
Pier - P1 cum 1 10.80 10.80 0.00 0.00 0 1 10.80 10.80 0.00 0.00 0.00
Pier - P2 cum 1 10.80 10.80 0.00 0.00 0 1 10.80 10.80 0.00 0.00 0.00
Pier - P3 cum 1 10.80 10.80 0.00 0.00 0 1 10.80 10.80 0.00 0.00 0.00
Pier - P4 cum 1 10.80 10.80 0.00 0.00 0 1 10.80 10.80 0.00 0.00 0.00
Pier - P5 cum 1 10.80 10.80 3.50 408.24 408.24 0 0.00 0.00 0.00 0.00 0.00
Pier - P6 cum 1 10.80 10.80 3.50 408.24 408.24 0 0.00 0.00 0.00 0.00 0.00
Total cum 816.48 468.05 348.43
Abutment (A1) cum 1 4.20 7.45 3.60 112.52 112.52 4.20 7.45 3.60 112.52 112.52
cum 0 22.85 (Ar. X Ht.) 1.20 27.42 0 1 22.85 (Ar. X Ht.) 1.20 27.42 0.00
Abutment(A2) cum 1 1.45 7.55 3.71 40.66 40.66 0 1.45 7.55 3.71 40.66 40.66
cum 0 24.38 (Ar. X Ht.) 1.24 30.23 0 1 24.38 (Ar. X Ht.) 1.24 30.23 0.00
cum 0 2.53 7.55 1.14 21.81 0 0 2.53 7.55 1.14 21.81 0.00
Abutment Pile - A2 (upto S/R) MT 6 8.00 3.96 0.01 1.49 8.94 6 8.00 3.96 0.01 1.49 8.94
Pier Pile P5 (upto S/R) MT 4 4.40 3.96 0.01 0.82 0 6 8.00 3.96 0.01 1.49 8.94
Pier Pile P6 (upto S/R) MT 4 4.40 3.96 0.01 0.82 0 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P7 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P8 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P9 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P10 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P11 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P12 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Pier Pile P13 (upto S/R) MT 4 8.00 3.96 0.01 1.49 5.96 4 8.00 3.96 0.01 1.49 5.96
Total 50.66 62.58 11.92
Abutment Pile - A2 metre 6 9.65 0.00 0.00 9.65 57.9 6 9.65 0.00 0.00 9.65 57.90
Pier Pile - P5 metre 4 4.55 0.00 0.00 4.55 0 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P6 metre 4 4.55 0.00 0.00 4.55 0 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P7 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P8 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P9 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P10 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P11 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P12 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Pier Pile - P13 metre 4 9.65 0.00 0.00 9.65 38.6 4 9.65 0.00 0.00 9.65 38.60
Total 328.1 405.30 -77.20
1.5*362 MT
1.5*362 MT
Pile Load Test on Single vertical Pile in on 1 Pile
6 12.37 MT 1 0.00 0.00 543.00 543 1 on 1 Pile from 0.00 0.00 543.00 543.00
accordance with IS: 2911 (Part-IV) from Pier
Pier Design
Design
Abutment Pile - A2 cum 1 5.30 8.90 0.10 4.72 4.72 1 5.30 8.90 0.10 4.72 4.72
Pier Pile - P5 cum 1 10.20 10.20 0.00 10.40 0 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P6 cum 1 10.20 10.20 0.00 10.40 0 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P7 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P8 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P9 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P10 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P11 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P12 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Pier Pile - P13 cum 1 5.30 5.30 0.10 2.81 2.81 1 5.30 5.30 0.10 2.81 2.81
Total 24.39 30.01 -5.62
Cement Concrete for Reinforced Concrete in Pile
Cap complete as per drawing and Technical
8 12.38 B (i)
Specification (RCC Grade M25, using Concrete
Mixer)
Abutment A2 cum 1 5.10 8.70 1.80 79.87 79.87 1 5.10 8.70 1.80 79.87 79.87
Pier P5 cum 1 10.00 10.00 0.00 180.00 0 1 5.10 5.10 1.80 46.82 46.82
Pier P6 cum 1 10.00 10.00 0.00 180.00 0 1 5.10 5.10 1.80 46.82 46.82
Pier P7 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P8 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P9 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P10 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P11 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P12 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
Pier P13 cum 1 5.10 5.10 1.80 46.82 46.82 1 5.10 5.10 1.80 46.82 46.82
PCC below Abutment Foundation - A1 cum 1 10.40 8.65 0.10 9.00 9 1 10.40 8.65 0.10 9.00 9.00
PCC below Pier Foundation - P1 cum 1 10.20 10.20 0.10 10.40 10.4 1 10.20 10.20 0.10 10.40 10.40
PCC below Pier Foundation - P2 cum 1 10.20 10.20 0.10 10.40 10.4 1 10.20 10.20 0.10 10.40 10.40
PCC below Pier Foundation - P3 cum 1 10.20 10.20 0.10 10.40 10.4 1 10.20 10.20 0.10 10.40 10.40
PCC below Pier Foundation - P4 cum 1 10.20 10.20 0.10 10.40 10.4 1 10.20 10.20 0.10 10.40 10.40
PCC below Pier Foundation - P5 cum 1 10.20 10.20 0.10 10.40 10.4
PCC below Pier Foundation - P6 cum 1 10.20 10.20 0.10 10.40 10.4
Abutment-A1
Levelling Course cum 1 10.40 8.65 0.10 9.00 9 1 10.40 8.65 0.10 9.00 9.00
Abutment Shaft cum 1 1.10 8.45 3.00 27.89 27.89 1 1.10 8.45 3.00 27.89 27.89
Return Wall Straight cum 2 4.80 0.50 3.00 7.20 14.4 2 4.80 0.50 3.00 7.20 14.40
Return Wall Traingular cum 0 4.80 0.50 0.35 0.84 0 0 4.80 0.50 0.35 0.84 0.00
Heel Slab Straight cum 1 4.80 8.45 1.80 73.01 73.01 1 4.80 8.45 1.80 73.01 73.01
Heel Slab Triangular cum 1 4.80 8.45 0.35 14.20 14.2 1 4.80 8.45 0.35 14.20 14.20
Toe Slab Straight cum 1 4.20 8.45 1.80 63.88 63.88 1 4.20 8.45 1.80 63.88 63.88
Toe Slab Triangular cum 1 4.20 8.45 0.35 12.42 12.42 1 4.20 8.45 0.35 12.42 12.42
Between Heel & Slab cum 1 1.20 8.45 1.50 15.21 15.21 1 1.20 8.45 1.50 15.21 15.21
Volume of Concrete = 230.01 230.01
PCC Below foundation cum 1 10.20 10.20 0.10 10.40 10.4 1 10.20 10.20 0.10 10.40 10.40
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 2.00 9.82 9.82 1 4.91 (Ar. X Ht.) 2.00 9.82 9.82
Pier Foundation Staright cum 1 10.00 10.00 1.80 180.00 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23333 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier - P2
PCC Below foundation cum 1 10.2 10.2 0.1 10.4 10.4 1 10.20 10.20 0.10 10.40 10.40
Pier Shaft Circular cum 1 4.908738521 (Ar. X Ht.) 1.5 7.36 7.36 1 4.91 (Ar. X Ht.) 1.50 7.36 7.36
Pier Foundation Staright cum 1 10 10 1.8 180 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23333 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Volume of Concrete= 229.09 229.09
PCC Below foundation cum 1 10.2 10.2 0.1 10.4 10.4 1 10.20 10.20 0.10 10.40 10.40
Pier Shaft Circular cum 1 4.908738521 (Ar. X Ht.) 1 4.91 4.91 1 4.91 (Ar. X Ht.) 1.00 4.91 4.91
Pier Foundation Staright cum 1 10 10 1.8 180 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23333 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier - P4
PCC Below foundation cum 1 10.2 10.2 0.1 10.4 10.4 1 10.20 10.20 0.10 10.40 10.40
Pier Shaft Circular cum 1 4.908738521 (Ar. X Ht.) 1 4.91 4.91 1 4.91 (Ar. X Ht.) 1.00 4.91 4.91
Pier Foundation Staright cum 1 10 10 1.8 180 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23333 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Volume of Concrete= 226.64 226.64
Abutment Shaft cum 1 1.10 8.45 5.00 46.48 46.48 1 1.10 8.45 5.00 46.48 46.48
Return Wall Straight cum 2 4.80 0.50 5.00 12.00 24 2 4.80 0.50 5.00 12.00 24.00
Return Wall Triangular cum 0 4.80 0.50 0.60 1.44 0 4.80 0.50 0.60 1.44 0.00
Heel Slab Straight cum 1 4.80 8.45 1.80 73.01 73.01 1 4.80 8.45 1.80 73.01 73.01
Heel Slab Tapered cum 1 4.80 8.45 0.23 9.46 9.46 1 4.80 8.45 0.23 9.46 9.46
Toe Slab Straight cum 1 4.20 8.45 1.80 63.88 63.88 1 4.20 8.45 1.80 63.88 63.88
Toe Slab Tapered cum 1 4.20 8.45 0.23 8.28 8.28 1 4.20 8.45 0.23 8.28 8.28
Between Heel & Slab cum 1 1.20 8.45 2.50 25.35 25.35 1 1.20 8.45 2.50 25.35 25.35
Abutment (A2) Pile 0 0 0.00 0.00 0.00 0.00 0
Shaft Uniform cum 1 1.00 8.45 0.30 2.53 2.53 1 1.00 8.45 0.30 2.53 2.53
Return Wall cum 2 2.05 0.50 0.30 0.31 0.62 2 2.05 0.50 0.30 0.31 0.62
Pier (P1) Open
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 5.00 24.54 24.54 1 4.91 (Ar. X Ht.) 5.00 24.54 24.54
Pier Foundation Straight cum 1 10.00 10.00 1.80 180.00 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier (P2) Open
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.50 22.09 22.09 1 4.91 (Ar. X Ht.) 4.50 22.09 22.09
Pier Foundation Straight cum 1 10.00 10.00 1.80 180.00 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier (P3) Open
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.00 19.63 19.63 1 4.91 (Ar. X Ht.) 4.00 19.63 19.63
Pier Foundation Straight cum 1 10.00 10.00 1.80 180.00 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier Foundation Straight cum 1 10.00 10.00 1.80 180.00 180 1 10.00 10.00 1.80 180.00 180.00
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier (P6) Open
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.00 19.63 19.63 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier Foundation Straight cum 1 10.00 10.00 1.80 180.00 180
Pier Foundation Tapered cum 1 134.29 (Ar. x Ht.) 0.23 31.33 31.33 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier (P5) Pile
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier (P6) Pile 0
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Pier (P13) Pile
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94 1 3.14 (Ar. X Ht.) 0.30 0.94 0.94
Total 1653.32 1193.28 460.04
p Height Upto 5m
Abutment (A1)
Dirt Wall cum 1 0.30 8.45 2.48 6.27 6.27 1 0.30 8.45 2.48 6.27 6.27
Bracket Straight cum 1 0.30 8.45 0.30 0.76 0.76 1 0.30 8.45 0.30 0.76 0.76
Bracket Tapered cum 1 0.30 8.45 0.15 0.38 0.38 1 0.30 8.45 0.15 0.38 0.38
Abutment Cap Straight cum 1 1.20 8.45 0.30 3.04 3.04 1.20 8.45 0.30 3.04 3.04
Abutment Cap Tapered cum 1 1.10 8.45 0.30 2.79 2.79 1.10 8.45 0.30 2.79 2.79
Abutment Shaft cum 1 1.10 8.45 0.46 4.26 4.26 1.10 8.45 0.46 4.26 4.26
Return Wall cum 2 4.80 0.50 3.60 8.63 17.26 4.80 0.50 3.60 8.63 17.26
Abutment (A2) 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00
Dirt Wall cum 1 0.30 8.45 2.48 6.27 6.27 0.30 8.45 2.48 6.27 6.27
Bracket Straight cum 1 0.30 8.45 0.30 0.76 0.76 0.30 8.45 0.30 0.76 0.76
Bracket Tapered cum 1 0.30 8.45 0.15 0.38 0.38 1 0.30 8.45 0.15 0.38 0.38
Abutment Cap Straight cum 1 1.33 8.45 0.30 3.36 3.36 1 1.33 8.45 0.30 3.36 3.36
Abutment Cap Tapered cum 1 1.16 8.45 0.30 2.95 2.95 1 1.16 8.45 0.30 2.95 2.95
Abutment Shaft cum 1 1.00 8.45 0.58 4.87 4.87 1 1.00 8.45 0.58 4.87 4.87
Return Wall cum 2 2.05 0.50 3.71 3.81 7.62 1 2.05 0.50 3.71 3.81 7.62
Return Wall Cantilever cum 0 2.53 0.50 1.14 1.44 0 1 2.53 0.50 1.14 1.44 0.00
Pier (P1)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 1.20 5.88 5.88 1 4.91 (Ar. X Ht.) 1.20 5.88 5.88
Pier (P2)
Pier Cap (Straight) cum 1 2.70 7.00 0.63 11.91 11.91 1 2.70 7.00 0.63 11.91 11.91
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 3.37 16.54 16.54 1 4.91 (Ar. X Ht.) 3.37 16.54 16.54
Pier (P3)
Pier Cap (Straight) cum 1 2.70 7.00 0.00 0.00 0 1 2.70 7.00 0.00 0.00 0.00
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.02 0.66 0.66 1 37.93 (Ar. x Ht.) 0.02 0.66 0.66
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 4.95 24.29 24.29 1 4.91 (Ar. X Ht.) 4.95 24.29 24.29
Pier (P4) 1
Pier Cap (Straight) cum 1 2.70 7.00 0.00 0.00 0 1 2.70 7.00 0.00 0.00 0.00
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.00 0.00 0 1 37.93 (Ar. x Ht.) 0.00 0.00 0.00
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 5.00 24.54 24.54 1 4.91 (Ar. X Ht.) 5.00 24.54 24.54
Pier (P5)
Pier Cap (Straight) cum 1 2.70 7.00 0.00 0.00 0 1 2.70 7.00 0.00 0.00 0.00
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.00 0.00 0 1 39.48 (Ar. x Ht.) 0.00 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 5.00 15.71 15.71 1 3.14 (Ar. X Ht.) 5.00 15.71 15.71
Pier (P6)
Pier Cap (Straight) cum 1 2.70 7.00 0.47 8.92 8.92 1 2.70 7.00 0.47 8.92 8.92
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 3.53 11.08 11.08 1 3.14 (Ar. X Ht.) 3.53 11.08 11.08
Pier (P7)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.31 7.26 7.26 1 3.14 (Ar. X Ht.) 2.31 7.26 7.26
Pier (P8)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 2.08 6.53 6.53 1 3.14 (Ar. X Ht.) 2.08 6.53 6.53
Pier (P9)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.95 6.12 6.12 1 3.14 (Ar. X Ht.) 1.95 6.12 6.12
Pier (P10)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.72 5.40 5.4 1 3.14 (Ar. X Ht.) 1.72 5.40 5.40
Pier (P11)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 1.36 4.28 4.28 1 3.14 (Ar. X Ht.) 1.36 4.28 4.28
Pier (P12)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.81 2.54 2.54 1 3.14 (Ar. X Ht.) 0.81 2.54 2.54
Pier (P13)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.48 1.50 1.5 1 3.14 (Ar. X Ht.) 0.48 1.50 1.50
Pier Cap (Straight) cum 1 2.70 7.00 0.00 0.00 0 1 2.70 7.00 0.00 0.00 0.00
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.00 0.00 0 1 37.93 (Ar. x Ht.) 0.00 0.00 0.00
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.00 0.00 0 1 4.91 (Ar. X Ht.) 0.00 0.00 0.00
Pier (P2)
Pier Cap (Straight) cum 1 2.70 7.00 0.12 2.27 2.27 1 2.70 7.00 0.12 2.27 2.27
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.00 0.00 0 1 37.93 (Ar. x Ht.) 0.00 0.00 0.00
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.00 0.00 0 1 4.91 (Ar. X Ht.) 0.00 0.00 0.00
Pier (P3)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.32 11.99 11.99 1 37.93 (Ar. x Ht.) 0.32 11.99 11.99
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.00 0.00 0 1 4.91 (Ar. X Ht.) 0.00 0.00 0.00
Pier (P4)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64 1 37.93 (Ar. x Ht.) 0.33 12.64 12.64
Pier Shaft Circular cum 1 4.91 (Ar. X Ht.) 0.34 1.69 1.69 1 4.91 (Ar. X Ht.) 0.34 1.69 1.69
Pier (P5)
Pier Cap (Straight) cum 1 2.70 7.00 0.75 14.18 14.18 1 2.70 7.00 0.75 14.18 14.18
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16 1 39.48 (Ar. x Ht.) 0.33 13.16 13.16
Pier Shaft Circular cum 1 3.14 (Ar. X Ht.) 0.16 0.51 0.51 1 3.14 (Ar. X Ht.) 0.16 0.51 0.51
Pier (P6)
Pier Cap (Straight) cum 1 2.70 7.00 0.28 5.25 5.25 1 2.70 7.00 0.28 5.25 5.25
Pier Cap (Tapered) cum 1 39.48 (Ar. x Ht.) 0.00 0.00 0.00 1 39.48 (Ar. x Ht.) 0.00 0.00 0.00
Pier Shaft Circular cum 1 3.14 (Ar. x Ht.) 0.00 0.00 0.00 1 3.14 (Ar. x Ht.) 0.00 0.00 0.00
Pedestal (Variable Height) cum 84 0.65 0.62 0.24 0.10 8.40 84 0.65 0.62 0.24 0.10 8.40
Seismic Restrainer cum 0 0.50 0.50 0.00 0.00 0.00 0 0.50 0.50 0.00 0.00 0.00
Slab and Girders cum 14 per Span 0.00 0.00 95.50 1337 14 per Span 0.00 0.00 95.50 1337.00
Kerb cum 2 313.04 0.48 0.30 44.61 89.22 2 313.04 0.48 0.30 44.61 89.22
Abutment-A1 cum 1 14.65 0.60 3.70 32.49 32.49 1 14.65 0.60 3.70 32.49 32.49
Abutment-A2 cum 1 9.25 0.60 3.81 21.17 21.17 1 9.25 0.60 3.81 21.17 21.17
Abutment-A1 cum 1 25.87 0.60 6.66 103.38 103.38 1 25.87 0.60 6.66 103.38 103.38
Abutment-A2 cum 1 26.42 0.60 6.88 109.06 109.06 1 26.42 0.60 6.88 109.06 109.06
Stone /boulder
Abutment-A1 cum 1 25.87 0.30 6.66 51.69 51.69 1 25.87 0.30 6.66 51.69 51.69
Abutment-A2 cum 1 26.42 0.30 6.88 54.53 54.53 1 26.42 0.30 6.88 54.53 54.53
28 Lumpsum Dewatering for Foundation LS 15 0.00 0.00 0.00 15.0 15.00 15 0.00 0.00 0.00 15.00 15.00 0.00
Earth work in embankement (Rampur Side) cum 1 3053.34 3053.34 1 0.00 0.00 0.00 673.68 673.68
Earth work in embankement (Pinrahat Side) cum 1 1224.44 1224.44 1 0.00 0.00 0.00 809.86 809.86
(i) for Grading - I Material 1 2000.00 7.50 0.15 2250.00 2250 1 300.00 7.50 0.15 337.50 337.50 1912.50
Boulder Pitching toward Rampur Side 1 Area= 184.39 0.30 55.32 55 1 Area= 48.49 0.30 14.55 14.55
Boulder Pitching toward Pinrahat Side 1 Area= 251.80 0.30 75.54 76 1 Area= 76.43 0.30 22.93 22.93
(L x Avg (L x Avg
Length of Guard Wall toward Rampur Side = cum 2 50.00 3.23 161.50 323.00 2 50 3 162 323.00
Area) Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25.00 0.00 3.23 80.75 161.50 2 25 0 3 81 161.50
Length of Guard Wall toward Rampur Side = cum 2 50 2.09 0.15 15.68 31.36 2 50 2 0 16 31.36
Length of Guard Wall toward Pinrahat Side = cum 2 25 2.09 0.15 7.84 15.68 2 25 2 0 8 15.68
(L x Avg
Length of Guard Wall toward Rampur Side = cum 2 50 1.985 99.25 198.5 2 50 (L x Avg Area) 2 99 198.50
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25 0 1.985 49.63 99.26 2 25 0 2 50 99.26
(L x Avg
Length of Guard Wall toward Rampur Side = cum 2 50 0.836 41.8 83.6 2 50 (L x Avg Area) 1 42 83.60
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25 0 0.836 20.9 41.8 2 25 0 1 21 41.80
(L x Avg
Length of Guard Wall toward Rampur Side = cum 2 50 1.245 62.25 124.5 2 50 (L x Avg Area) 1 62 124.50
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25 0 1.245 31.13 62.26 2 25 0 1 31 62.26
(L x Avg
Length of Guard Wall toward Rampur Side = cum 2 50 1.765 88.25 176.5 2 50 (L x Avg Area) 2 88 176.50
Area)
Length of Guard Wall toward Pinrahat Side = cum 2 25 0 1.765 44.13 88.26 2 25 0 2 44 88.26
Construction Of Bridge Over Ajay River Between Basbariya Sarwan Block And Samlapur
Sarath Block Under Sarwan Block, Deoghar District.
QUANTITY CALCULATION
SL. NH Sch. DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item
D No. RETAINING WALL
Total 1046.76
Basbariya Side
Samlapur Side
Total 69.4
Basbariya Side
5 m Height Retaining Wall
Samlapur Side
Total 403.02
Samlapur Side
Total 256.7
5 12.40 Supplying , fitting and placing un- tonne Foundation 37.11 37.11
coated HYSD bar reinforcement in
foundation complete as per drawing
and technical specifications
6 13.6 Supplying , fitting and placing HYSD tonne Substructure 13.38 13.38
bar reinforcement in sub-structure
complete as per drawing and technical
specifications
7 15.5 Providing and laying Filter material
Samlapur Side
Construction Of Bridge Over Ajay River Between Basbariya Sarwan Block And
Samlapur Sarath Block Under Sarwan Block, Deoghar District.
QUANTITY CALCULATION
SL. NH Sch. DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item
D No. RETAINING WALL
Samlapur Side
5 m Height Retaining Wall cum 2 20.8 5.5 1.3 148.72 297.44
3 m Height Retaining Wall cum 2 15.8 5.5 1.3 112.97 225.94
Total 1046.76
Basbariya Side
Samlapur Side
Total 69.4
Basbariya Side
5 m Height Retaining Wall
Samlapur Side
5 m Height Retaining Wall
Total 403.02
Samlapur Side
Total 256.7
5 12.40 Supplying , fitting and placing un- tonne Foundation 37.11 37.11
coated HYSD bar reinforcement in
foundation complete as per drawing
and technical specifications
6 13.6 Supplying , fitting and placing HYSD tonne Substructure 13.38 13.38
bar reinforcement in sub-structure
complete as per drawing and technical
specifications
7 15.5 Providing and laying Filter material
Samlapur Side
Material Statement
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and
Rampur Village Of Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
SL. No. DESCRIPTION UNIT QTY Sand (cum) Cement (MT) Boulder Aggregates Bitumen Bitumen Steel (MT)
(cum) (cum) Emulsion (MT)
(MT)
1 PCC M-10 Grade Concrete (1:3:6) cum 50.60 22.77 11.64 45.54
2 PCC M-15 Grade Concrete (1:2:4) cum 1342.33 604.05 369.59 1208.10
3 PCC M-20 Grade Concrete (1:1.5:3) cum 11.25 5.06 3.87 10.13
In
Fixing
Extra
Providing
Using
composite
standard
flats
for
forand
and
and
and
30
andproviding
units
xproviding
fixing
fixing
steel
6mm
fixing
fixing
fixing
fixing
of doors,
20x6mm
T-iron
steel
glazed
for
M.S.
panelling
M.S.
1mm
in
M.S.
Horizontal
diagonal
mild-steel
position
glazed
Vertical
frames
sliding
doors,
tower
M.S.
door
mild
or P
door
collapsible
Coupling
for
rings
steel
windows
bolts
sheet
panelling
handles
braces
doors,
of
(Barrel
bolts
garage
15cm
and
6mm
and
Mullion
with
and
Mullion
windows
and
central
bright
shutters
type)
ventilators
round
door
glazing
ventilators
long
necessary
bar
bar
with
ventilators
finished
cross
with
and
baror
with
clamps
or
in
frame
and
ventilators
necessary
Horizontal
piece.
panelled
Weather
invertical
screws
or/and
40mm
walls
40for
of
x r
black
channels
with
standard
Coupling
Bar
of
internal
securing
screws,
40
or
etc.panelled
mild
xcomplete
15
(especially
6mm
enameled,
etc.
dia
steel
chick
x 20
rolled
3mm
and
Mullion
complete
angle
for
: tops.
xTee-sections,
glazed
lugs
20
fastening
used
steel
with
iron
xof
:bar
shutters
2mm
when
10cm
and
nuts
sections,
top
(when
joints
3mm
long
and
the
for
of o Smeatons Project Pvt. Ltd ., Ranchi
screws
braced
embedded
joints
openable
coupled
mitred
chicks.
M.S. gusset
doors mitered
(full
with
and
etc.
unitwindows
area
complete
flat
welded
is
in
plates
and
exposed
iron
cement
ofwelded
at
shutters
diagonals
with
: are
the
to 15x3mm
with
rain)
concrete
junction
toto2015
(K-
bex v
535167343.xlsx MS_Previous
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and
Rampur Village Of Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
In
Fixing
Extra
Providing
Using
composite
standard
flats
for
forand
and
and
and
30
andproviding
units
xproviding
fixing
fixing
steel
6mm
fixing
fixing
fixing
fixing
of doors,
20x6mm
T-iron
steel
glazed
for
M.S.
panelling
M.S.
1mm
in
M.S.
Horizontal
diagonal
mild-steel
position
glazed
Vertical
frames
sliding
doors,
tower
M.S.
door
mildor P Total: 2969.35 2299.69 640.37 6433.06 0.98 2.63 677.81
door
collapsible
Coupling
for
rings
steel
windows
bolts
sheet
panelling
handles
braces
doors,
of
(Barrel
bolts
garage
15cm
and
6mmand
Mullion
with
and
Mullion
windows
and
central
bright
shutters
type)
ventilators
round
door
glazing
ventilators
long
necessary
bar
bar
with
ventilators
finished
cross
with
and
bar or
with
clamps
or
in
frame
and
ventilators
necessary
Horizontal
piece.
panelled
Weather
invertical
screws
or/and
40mm
walls
40for
ofx r
black
channels
with
standard
Coupling
Bar
of
internal
securing
screws,
40
or
etc. panelled
mild
xcomplete
15(especially
6mm
enameled,
etc.
dia
steel
chick
x 20
rolled
3mm
and
Mullion
complete
angle
for
: tops.
xTee-sections,
glazed
lugs
20
fastening
used
steel
with
ironxof
:bar
shutters
2mm
when
10cm
and
nuts
sections,
top
(when
joints
3mm
long
and
the
for
of o
screws
braced
embedded
joints
openable
coupled
mitred
chicks.
M.S. gusset
doors mitered
(full
with
and
etc.
unitwindows
area
complete
flat
welded
is
in
plates
and
exposed
iron
cement
ofwelded
at
shutters
diagonals
with
: are
the
to 15x3mm
with
rain)
concrete
junction
toto20 15
(K-
bex v
5mm
xblocks
coupled
12
lugs
and
measured):
3mm
B)corners,
size
10cm
15
lugs,above
xwith
Panelling
10cm
10long
alltopxnecessary
10cm
fixed
long,
and
embedded
forbottom
embedded
ofonce
panelled
1:3:6
fittings
rail
or
in
(1 i
of
in
between
cement
complete,
or T-iron
cement
panelled :3
40two
concrete
coarse
xand
including
40
concrete
fixed
glazed
x 6mmsand
blocks
windows)
applying
shutters
with
:615 graded
blocks
40mm
x 3510
or
a d
dia,
xstone
Horizontal
15x10x10cm
priming
mm 10cm
steel
thick,
aggregate
coat
ofpulleys
with
Coupling
of
1:3:6
of1:3:6
Ply approved
20mm
complete
(1wood,
(1
Mullion
cement
cement
nominal
5steel
with
ply,
bar
:3 i
botls,
size)
(where
coarse
primerthick.
6mm ofnuts,
: windows
sand
withlockingwooden
:6aregraded not
arrangement
plugs
exposed
stone
and n
stoppers,
screws
to
aggregate
weather) of rawl
20mm
(K-11
handles,
plugsB).
nominal
and screws including
size) or or g
applying
with wooden
fixing aclips plugs
priming
or andwith screwsbolts
coat and or
of
approved
nuts
rawl plugs
as required,
steel
and
and screws
primer.
crewsincludingor
or with fixing
fixing of a
glass or
clips panes withwith bolts glazing
and clips nuts and as n
special
required, including
metal-sash
includingproviding fixing
putty and of
of d
approved
fixing
necessary of glassmake,
butt paneshinges
or metal with
and beading
glazing
screws
with applying
clips
and and
screws special(only
a metal-sash
priming
steel windows coat puttyof f
with approved
of
approvedlugs, steelglassprimer.make,
panes cut complete
to size i
and glazing
including applying
clips or a priming
metal beading coat of x
with screws,
approved steelshall primer,
be supplied excluding by i
department
the cost of metal free of beading
cost). and other n
fitting except necessary hinges of g
pivots as required :
p
r
e
s
s
e
d
s
t
e
e
l
d
o
o
r
f
r
a
m
e
Smeatons Project Pvt. Ltd ., Ranchi
s
535167343.xlsx MS_Revised
Material Statement
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and
Rampur Village Of Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
SL. No. DESCRIPTION UNIT QTY Sand (cum) Cement (MT) Boulder Aggregates Bitumen Bitumen Steel (MT)
(cum) (cum) Emulsion (MT)
(MT)
1 PCC M-10 Grade Concrete (1:3:6) cum 71.40 32.13 16.42 64.26
2 PCC M-15 Grade Concrete (1:2:4) cum 1336.71 601.52 368.04 1203.04
3 PCC M-20 Grade Concrete (1:1.5:3) cum 11.25 5.06 3.87 10.13
In
Fixing
Extra
Providing
Using
composite
standard
flats
for
forand
and
and
and
30
andproviding
units
xproviding
fixing
fixing
steel
6mm
fixing
fixing
fixing
fixing
of doors,
20x6mm
T-iron
steel
glazed
for
M.S.
panelling
M.S.
1mm
in
M.S.
Horizontal
diagonal
mild-steel
position
glazed
Vertical
frames
sliding
doors,
tower
M.S.
door
mild
or P
door
collapsible
Coupling
for
rings
steel
windows
bolts
sheet
panelling
handles
braces
doors,
of
(Barrel
bolts
garage
15cm
and
6mm
and
Mullion
with
and
Mullion
windows
and
central
bright
shutters
type)
ventilators
round
door
glazing
ventilators
long
necessary
bar
bar
with
ventilators
finished
cross
with
and
baror
with
clamps
or
in
frame
and
ventilators
necessary
Horizontal
piece.
panelled
Weather
invertical
screws
or/and
40mm
walls
40for
of
x r
black
channels
with
standard
Coupling
Bar
of
internal
securing
screws,
40
or
etc.panelled
mild
xcomplete
15
(especially
6mm
enameled,
etc.
dia
steel
chick
x 20
rolled
3mm
and
Mullion
complete
angle
for
: tops.
xTee-sections,
glazed
lugs
20
fastening
used
steel
with
iron
xof
:bar
shutters
2mm
when
10cm
and
nuts
sections,
top
(when
joints
3mm
long
and
the
for
of o Smeatons Project Pvt. Ltd ., Ranchi
screws
braced
embedded
joints
openable
coupled
mitred
chicks.
M.S. gusset
doors mitered
(full
with
and
etc.
unitwindows
area
complete
flat
welded
is
in
plates
and
exposed
iron
cement
ofwelded
at
shutters
diagonals
with
: are
the
to 15x3mm
with
rain)
concrete
junction
toto2015
(K-
bex v
535167343.xlsx MS_Revised
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and
Rampur Village Of Lakhanpur Panchayat In Dumka District Under Ramgarh Block, Dumka District.
In
Fixing
Extra
Providing
Using
composite
standard
flats
for
forand
and
and
and
30
andproviding
units
xproviding
fixing
fixing
steel
6mm
fixing
fixing
fixing
fixing
of doors,
20x6mm
T-iron
steel
glazed
for
M.S.
panelling
M.S.
1mm
in
M.S.
Horizontal
diagonal
mild-steel
position
glazed
Vertical
frames
sliding
doors,
tower
M.S.
door
mildor P Total: 3303.24 2594.66 640.37 7100.85 0.98 2.63 676.80
door
collapsible
Coupling
for
rings
steel
windows
bolts
sheet
panelling
handles
braces
doors,
of
(Barrel
bolts
garage
15cm
and
6mmand
Mullion
with
and
Mullion
windows
and
central
bright
shutters
type)
ventilators
round
door
glazing
ventilators
long
necessary
bar
bar
with
ventilators
finished
cross
with
and
bar or
with
clamps
or
in
frame
and
ventilators
necessary
Horizontal
piece.
panelled
Weather
invertical
screws
or/and
40mm
walls
40for
ofx r
black
channels
with
standard
Coupling
Bar
of
internal
securing
screws,
40
or
etc. panelled
mild
xcomplete
15(especially
6mm
enameled,
etc.
dia
steel
chick
x 20
rolled
3mm
and
Mullion
complete
angle
for
: tops.
xTee-sections,
glazed
lugs
20
fastening
used
steel
with
ironxof
:bar
shutters
2mm
when
10cm
and
nuts
sections,
top
(when
joints
3mm
long
and
the
for
of o
screws
braced
embedded
joints
openable
coupled
mitred
chicks.
M.S. gusset
doors mitered
(full
with
and
etc.
unitwindows
area
complete
flat
welded
is
in
plates
and
exposed
iron
cement
ofwelded
at
shutters
diagonals
with
: are
the
to 15x3mm
with
rain)
concrete
junction
toto20 15
(K-
bex v
5mm
xblocks
coupled
12
lugs
and
measured):
3mm
B)corners,
size
10cm
15
lugs,above
xwith
Panelling
10cm
10long
alltopxnecessary
10cm
fixed
long,
and
embedded
forbottom
embedded
ofonce
panelled
1:3:6
fittings
rail
or
in
(1 i
of
in
between
cement
complete,
or T-iron
cement
panelled :3
40two
concrete
coarse
xand
including
40
concrete
fixed
glazed
x 6mmsand
blocks
windows)
applying
shutters
with
:615 graded
blocks
40mm
x 3510
or
a d
dia,
xstone
Horizontal
15x10x10cm
priming
mm 10cm
steel
thick,
aggregate
coat
ofpulleys
with
Coupling
of
1:3:6
of1:3:6
Ply approved
20mm
complete
(1wood,
(1
Mullion
cement
cement
nominal
5steel
with
ply,
bar
:3 i
botls,
size)
(where
coarse
primerthick.
6mm ofnuts,
: windows
sand
withlockingwooden
:6aregraded not
arrangement
plugs
exposed
stone
and n
stoppers,
screws
to
aggregate
weather) of rawl
20mm
(K-11
handles,
plugsB).
nominal
and screws including
size) or or g
applying
with wooden
fixing aclips plugs
priming
or andwith screwsbolts
coat and or
of
approved
nuts
rawl plugs
as required,
steel
and
and screws
primer.
crewsincludingor
or with fixing
fixing of a
glass or
clips panes withwith bolts glazing
and clips nuts and as n
special
required, including
metal-sash
includingproviding fixing
putty and of
of d
approved
fixing
necessary of glassmake,
butt paneshinges
or metal with
and beading
glazing
screws
with applying
clips
and and
screws special(only
a metal-sash
priming
steel windows coat puttyof f
with approved
of
approvedlugs, steelglassprimer.make,
panes cut complete
to size i
and glazing
including applying
clips or a priming
metal beading coat of x
with screws,
approved steelshall primer,
be supplied excluding by i
department
the cost of metal free of beading
cost). and other n
fitting except necessary hinges of g
pivots as required :
p
r
e
s
s
e
d
s
t
e
e
l
d
o
o
r
f
r
a
m
e
Smeatons Project Pvt. Ltd ., Ranchi
s
Quantity Calculation of Approach Road
Construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat Block Godda District and Rampur Village Of Lakhanpur Panchayat In Dumka District
Under Ramgarh Block, Dumka District.
Average RL 105.867 m
4.1m
7.5m
1
Average RL 102.112 m
1.5
Abstract
Remark FILL CUT Total
Rampur Side 2942.68 110.67 3053.34
Pinrahat Side 955.32 269.12 1224.44
construction Of Bridge Over Basloi River Between Pinrahat village Of Paraiyahat
Block Godda District and Rampur Village Of Lakhanpur Panchayat In Dumka District
Under Ramgarh Block, Dumka District.
STEEL CALCULATION
Superstucture
Foundation Sub-Structure per Span
Structure
(in Kg) (in Kg) (in Kg)
Pedastal - 7019.88 -
Pedastal - 7019.88 -
B Bridge Part
(I) Depth upto 3 m cum 63.00 2517.46 158599.98 63.00 3064.14 193040.82 546.68 34440.84 546.68 34440.84 0.00 0.00
(II) Depth upto 3 m to 6 m cum 73.00 468.05 34167.65 73.00 816.48 59603.04 348.43 25435.39 348.43 25435.39 0.00 0.00
Excavation for structures in ordinary Rock
not requiring blasting (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
12.I (II)
2 setting out, construction of shoring and cum 170.00 2322.61 394843.70 170.00 2322.61 394843.70 0.00 0.00 0.00 0.00 0.00 0.00
A
bracing, removal of stumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
material) Manual means
Back filling behind abutment, wing wall and
3 13.9 return wall complete as per drawing and
technical specification
A Granular Material cum 536.00 153.18 82104.48 536.00 153.18 82104.48 0.00 0.00 0.00 0.00 0.00 0.00
Providing Steel liner 6 mm thick for
curbs and 6mm thick for steining of wells
4 12.22
including fabricating and setting out as per
detailed drawing
MT 90142.00 62.58 5641086.36 90142.00 50.66 4566593.72 -11.92 -1074492.64 0.00 0.00 -11.92 -1074492.64
(RCC Grade M35 using Concrete Mixer) cum 10730.00 405.30 4348869.00 10730.00 328.10 3520513.00 -77.20 -828356.00 0.00 0.00 -77.20 -828356.00
PCC Grade M 15 cum 3687.00 30.01 110646.87 3687.00 24.39 89925.93 -5.62 -20720.94 0.00 0.00 -5.62 -20720.94
Plain/Reinforced cement concrete in
12.38 B Pile Cap complete as per drawing and
8
(i) technical specification
PCC Grade M 25 cum 4711.00 501.25 2361388.75 4711.00 407.61 1920250.71 -93.64 -441138.04 0.00 0.00 -93.64 -441138.04
PCC 1:3:6 in foundation (Plain Cement
Concrete 1:3:6 nominal mix in foundation
with crushed stone aggregate 40mm nominal
9 12.4 size mechanically mixed, placed in foudation
and compacted by vibration including curing
for 14 days.)
PCC cum 3555.00 50.60 179883.00 3555.00 71.40 253827.00 20.80 73944.00 20.80 73944.00 0.00 0.00
cum 3852.00 1178.68 4540275.36 3852.00 1178.68 4540275.36 0.00 0.00 0.00 0.00 0.00 0.00
PCC M-15 Grade Levelling Course below
11 14.10 Approach Slab complete as per drawing
and Technical specification
PCC Grade M15 cum 3706.00 8.24 30537.44 3706.00 8.24 30537.44 0.00 0.00 0.00 0.00 0.00 0.00
(p) Height Upto 5m cum 4994.00 458.13 2287901.22 4994.00 458.13 2287901.22 0.00 0.00 0.00 0.00 0.00 0.00
(q) Height between 5m to 10m cum 5158.00 121.00 624118.00 5158.00 121.00 624118.00 0.00 0.00 0.00 0.00 0.00 0.00
for Grading - I Material cum 1060.00 337.50 357750.00 1060.00 2250.00 2385000.00 1912.50 2027250.00 1912.50 2027250.00 0.00 0.00
Water Bound Macadam (Providing, laying,
spreading and compacting stone aggregates
of specific sizes to water bound macadam
specification including spreading in uniform
thickness, hand packing, rolling with
vibratory roller 8-10 tonnes / Smooth 3
31 4 . 9 (a)
wheeled Steel Roller in stages to proper
grade and camber, applying and brooming
requisite type of screening/ binding Materials
to fill up the interstices of coarse aggregate,
watering and compacting to the required
density.)
Grading-II (Using Screening Crushable type
(II) a cum 1170.00 225.00 263250.00 1170.00 1500.00 1755000.00 1275.00 1491750.00 1275.00 1491750.00 0.00 0.00
Such as Moorum or Gravel)
Grading-III (Using Screening Crushable type
(III) a cum 1196.00 168.75 201825.00 1196.00 1125.00 1345500.00 956.25 1143675.00 956.25 1143675.00 0.00 0.00
Such as Moorum or Gravel)
(ii) Cement MT 602.60 2299.69 1385793.19 602.60 2594.66 1563542.12 294.97 177748.92 294.97 177748.92 0.00 0.00
(iii) Boulder cum 759.09 640.37 486098.46 759.09 640.37 486098.46 0.00 0.00 0.00 0.00 0.00 0.00
(iv) Aggregate cum 1650.40 6433.06 10617122.22 1650.40 7100.85 11719242.84 667.79 1102120.62 667.79 1102120.62 0.00 0.00
(v) Steel MT 602.60 677.81 408448.31 602.60 676.80 407839.68 -1.01 -608.63 0.00 0.00 -1.01 -608.63
(vi) Bitumen (Bokaro) MT 1501.40 2.63 3948.68 1501.40 2.63 3948.68 0.00 0.00 0.00 0.00 0.00 0.00
(vii) Bitumen Emulsion (Bokaro) MT 1501.40 0.98 1471.37 1501.40 0.98 1471.37 0.00 0.00 0.00 0.00 0.00 0.00
(viii) Hume Pipe No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deviation Deviation
Grand Total= 114782044.43 124483253.36 Grand Total
9701208.93
Percentage
8.45