SEPAKAT SETIA PERUNDING SDN. BHD. (14142-M) Job No.

:
Bar schedule ref :
TITLE : BAR BENDING SCHEDULE TO BS 4466:1989
PROJECT : SEREMBAN AIR - HITAM RIVER BRIDGES
PIERS Date prepared : 11/1/2020 Date revised :
SITE REF. : BRIDGE OVER SG. REMBAU AT CH 32+368 Prepared by : LTC Checked by :
Written by T.C. Lim on October 2001
Type, size No. No. of Total Length Shape Bending Dimensions Total Total
and of bars no. of each code Length weight
Member Bar-mark mbrs. in bar A B C D E/R of bar Remarks
each
mm mm mm mm mm mm m kg
PIERS T 16 - 01 1 2 2 2000 20 2000 4.0 6.3 L=A
T 16 - 02 1 2 2 2180 32 2000 4.4 6.9 L=A+h
T 20 - 03 1 2 2 2440 33 2000 4.9 12.0 L = A + 2h
T 20 - 04 1 2 2 2110 34 2000 4.2 10.4 L=A+n
T 25 - 05 1 2 2 2360 35 2000 4.7 18.2 L = A + 2n
T 12 - 06 1 2 2 5245 36 500 2000 2000 2000 500 10.5 9.3 L = A+C+E+0.57(B+D)-3.1416d
T 12 - 07 1 2 2 3970 37 2000 2000 7.9 7.0 L = A+B - 0.5r - d
T 25 - 08 1 2 2 5850 38 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 12 - 09 1 2 2 5125 39 2000 2000 2000 10.3 9.1 L =A+0.57B+C-1.57d & B>=2r+2d
T 20 - 10 1 2 2 6000 41 2000 2000 2000 500 12.0 29.6 L = A+B+C for ß<=45° & D>=2d
T 20 - 11 1 2 2 6110 42 2000 2000 2000 500 12.2 30.1 L=A+B+C+n
T 12 - 12 1 2 2 8000 43 2000 2000 1000 1000 1000 16.0 14.2 L =A+2B+C+E for ß<=45° & D>=2d
T 25 - 13 1 2 2 5925 45 2000 2000 2000 500 11.9 45.7 L = A+B+C - 0.5r - d
T 25 - 14 1 2 2 6000 48 2000 2000 2000 500 12.0 46.2 L = A+B+C
T 25 - 15 1 2 2 6000 49 2000 2000 2000 500 500 12.0 46.2 L = A+B+C for ß <=45°
T 32 - 16 1 2 2 3870 51 2000 2000 200 7.7 48.9 L = A+B - 0.5R - d
T 12 - 17 1 2 2 7910 52 2000 2000 2000 2000 15.8 14.0 L = A+B+C+D - 1.5r - 3d
T 16 - 18 1 2 2 9840 53 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 19 1 2 2 5850 54 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 16 - 20 1 2 2 9840 55 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 21 1 2 2 9700 58 2000 2000 2000 2000 2000 19.4 74.8 L = A+B+C+D+E - 2r - 4d
T 25 - 22 1 2 2 8500 60 2000 2000 17.0 65.5 L = 2(A+B)+20d
T 25 - 23 1 2 2 8300 61 2000 2000 16.6 64.0 L = 2(A+B)+12d
T 25 - 24 1 2 2 4000 62 2000 500 2000 8.0 30.8 L = A+C - 0.5r - d
T 20 - 25 1 2 2 2000 65 2000 3000 4.0 9.9 L=A
T 25 - 26 1 2 2 6625 72 2000 2000 13.3 51.1 L = 2A+B+25d
T 25 - 27 1 2 2 8250 73 2000 2000 2000 16.5 63.6 L = 2A+B+C+10d
T 25 - 28 1 2 2 10500 74 2000 2000 2000 21.0 80.9 L = 2A+3B+20d
T 25 - 29 1 2 2 11250 75 2000 2000 2000 2000 1000 22.5 86.7 L = A+B+C+2D+E+10d
T 25 - 30 1 2 2 6500 77 2000 2000 13.0 50.1 L = 2A+B+20d
T 25 - 31 1 2 2 8075 78 2000 2000 2000 16.2 62.2 L = 2A+B+C+3d
T 25 - 32 1 2 2 10250 79 2000 2000 20.5 79.0 L = 2A+3B+10d
T 25 - 33 1 2 2 10550 81 2000 2000 21.1 81.3 L = 2A + 3B + 22d
T 25 - 34 1 2 2 10450 82 2000 2000 20.9 80.5 L = 2A+3B+18d & B>=2r+2d
T 25 - 35 1 2 2 9700 83 2000 2000 2000 2000 19.4 74.8 L = A+2B+C+D - 2r - 4d
T 25 - 36 1 2 2 7030 85 2000 2000 2000 2000 14.1 54.2 L =A+B+.57C+D-r/2-2.57d & C>2r+2d
R 6 - 37 1 2 2 10730 86 300 90 1000 21.5 4.8 L = 3.1416C(A+d)/B + 8d
R 6 - 38 1 2 2 24635 87 300 75 2000 49.3 10.9 L = 3.1416C(A-d)/B L>12m !
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
Grand Total 547.3 1531.5

SUMMARY :-
High Tensile Bars T6 T8 T10 T12 T16 T20 T25 T32 T40 T50 GRAND TOTAL
Total Length (m) - - - 60.5 47.7 37.3 323.3 7.7 - - 476.61
Total Weight (kg) - - - 53.7 75.3 92.0 1245.9 48.9 - - 1515.84

Mild Steel Bars R6 R8 R10 R12 R16 R20 R25 R32 R40 R50 GRAND TOTAL
Total Length (m) 70.7 - - - - - - - - - 70.73
Total Weight (kg) 15.7 - - - - - - - - - 15.70

NOTE: All bending dimensions are in accordance with BS4466:1989 and are specified to nearest 5mm. APPROVED BY:
Bar diameters are in millimetres. T = High yield deformed bars and R = Mild steel round bars.
SEPAKAT SETIA PERUNDING SDN. BHD. (14142-M) Job No. :
Bar schedule ref :
TITLE : BAR BENDING SCHEDULE TO BS 4466:1989
PROJECT : SEREMBAN AIR - HITAM RIVER BRIDGES
PIERS Date prepared : 11/1/2020 Date revised :
SITE REF. : BRIDGE OVER SG. REMBAU AT CH 32+368 Prepared by : LTC Checked by :
Written by T.C. Lim on October 2001
Type, size No. No. of Total Length Shape Bending Dimensions Total Total
and of bars no. of each code Length weight
Member Bar-mark mbrs. in bar A (Min.) A (Max.) B (Min.) B (Max.) C D E/R of bar Remarks
each
mm mm mm mm mm mm mm mm m kg
PIERS T 16 - 01 1 2 2 2000 20 2000 4.0 6.3 L=A
T 16 - 02 1 2 2 2180 32 2000 4.4 6.9 L=A+h
T 20 - 03 1 2 2 2440 33 2000 4.9 12.0 L = A + 2h
T 20 - 04 1 2 2 2110 34 2000 4.2 10.4 L=A+n
T 25 - 05 1 2 2 2360 35 2000 4.7 18.2 L = A + 2n
T 12 - 06 1 2 2 5245 36 500 2000 2000 2000 500 10.5 9.3 L = A+C+E+0.57(B+D)-3.1416d
T 12 - 07 1 2 2 3970 37 2000 2000 7.9 7.0 L = A+B - 0.5r - d
T 25 - 08 1 2 2 5850 38 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 12 - 09 1 2 2 5125 39 2000 2000 2000 10.3 9.1 L =A+0.57B+C-1.57d & B>=2r+2d
T 20 - 10 1 2 2 6000 41 2000 2000 2000 500 12.0 29.6 L = A+B+C for ß<=45° & D>=2d
T 20 - 11 1 2 2 6110 42 2000 2000 2000 500 12.2 30.1 L=A+B+C+n
T 12 - 12 1 2 2 8000 43 2000 2000 1000 1000 1000 16.0 14.2 L =A+2B+C+E for ß<=45° & D>=2d
T 25 - 13 1 2 2 5925 45 2000 2000 2000 500 11.9 45.7 L = A+B+C - 0.5r - d
T 25 - 14 1 2 2 6000 48 2000 2000 2000 500 12.0 46.2 L = A+B+C
T 25 - 15 1 2 2 6000 49 2000 2000 2000 500 500 12.0 46.2 L = A+B+C for ß <=45°
T 32 - 16 1 2 2 3870 51 2000 2000 200 7.7 48.9 L = A+B - 0.5R - d
T 12 - 17 1 2 2 7910 52 2000 2000 2000 2000 15.8 14.0 L = A+B+C+D - 1.5r - 3d
T 16 - 18 1 2 2 9840 53 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 19 1 2 2 5850 54 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 16 - 20 1 2 2 9840 55 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 21 1 2 2 9700 58 2000 2000 2000 2000 2000 19.4 74.8 L = A+B+C+D+E - 2r - 4d
T 25 - 22 1 2 2 8500 60 2000 2000 17.0 65.5 L = 2(A+B)+20d
T 25 - 23 1 2 2 8300 61 2000 2000 16.6 64.0 L = 2(A+B)+12d
T 25 - 24 1 2 2 4000 62 2000 500 2000 8.0 30.8 L = A+C - 0.5r - d
T 20 - 25 1 2 2 2000 65 2000 3000 4.0 9.9 L=A
T 25 - 26 1 2 2 6625 72 2000 2000 13.3 51.1 L = 2A+B+25d
T 25 - 27 1 2 2 8250 73 2000 2000 2000 16.5 63.6 L = 2A+B+C+10d
T 25 - 28 1 2 2 10500 74 2000 2000 2000 21.0 80.9 L = 2A+3B+20d
T 25 - 29 1 2 2 11250 75 2000 2000 2000 2000 1000 22.5 86.7 L = A+B+C+2D+E+10d
T 25 - 30 1 2 2 6500 77 2000 2000 13.0 50.1 L = 2A+B+20d
T 25 - 31 1 2 2 8075 78 2000 2000 2000 16.2 62.2 L = 2A+B+C+3d
T 25 - 32 1 2 2 10250 79 2000 2000 20.5 79.0 L = 2A+3B+10d
T 25 - 33 1 2 2 10550 81 2000 2000 21.1 81.3 L = 2A + 3B + 22d
T 25 - 34 1 2 2 10450 82 2000 2000 20.9 80.5 L = 2A+3B+18d & B>=2r+2d
T 25 - 35 1 2 2 9700 83 2000 2000 2000 2000 19.4 74.8 L = A+2B+C+D - 2r - 4d
T 25 - 36 1 2 2 7030 85 2000 2000 2000 2000 14.1 54.2 L =A+B+.57C+D-r/2-2.57d & C>2r+2d
R 6 - 37 1 2 2 10730 86 300 90 1000 21.5 4.8 L = 3.1416C(A+d)/B + 8d
R 6 - 38 1 2 2 24635 87 300 75 2000 49.3 10.9 L = 3.1416C(A-d)/B L>12m !
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
Grand Total 547.3 1531.5

SUMMARY :-
High Tensile Bars T6 T8 T10 T12 T16 T20 T25 T32 T40 T50 GRAND TOTAL
Total Length (m) - - - 60.5 47.7 37.3 323.3 7.7 - - 476.61
Total Weight (kg) - - - 53.7 75.3 92.0 1245.9 48.9 - - 1515.84

Mild Steel Bars R6 R8 R10 R12 R16 R20 R25 R32 R40 R50 GRAND TOTAL
Total Length (m) 70.7 - - - - - - - - - 70.73
Total Weight (kg) 15.7 - - - - - - - - - 15.70

NOTE: All bending dimensions are in accordance with BS4466:1989 and are specified to nearest 5mm. APPROVED BY:
Bar diameters are in millimetres. T = High yield deformed bars and R = Mild steel round bars.
A(Max.) and B(Max.) are only listed for bars that vary uniformly in length - The bar length shown is
the average of the longest and the shortest bars.