ID3402 - PT TD Automotive Compressor Indonesia - RAU - 2021 - Audit - Plan - Issue 4 - Final'
ID3402 - PT TD Automotive Compressor Indonesia - RAU - 2021 - Audit - Plan - Issue 4 - Final'
Audit objectives: To confirm that the management system has been established and implemented in accordance
with the requirements of the audit standard.
Line Priority for Clients Process
Time Auditor Clients QMS Process Name
Audit Owner
Date: 5.4.2021
07.30 ALL Arrive at Site - -
A Plant tour - Fikran
Review missing information during off site -
07.45 A Rully
review (APC)
08.00 B Verification of previous NC - Rully , Fikran
One (1) hour on site, prior to the opening -
meeting, for verification of changes to
current customer and internal performance Iwan R, Arko, Arsyil,
08.00 A
data, including a review of current online Didi, Wardana, Ferry
customer reports and/or customer
scorecards.
Customer complaint handling -
Including the connectivity with remote Arko, Didi, Iwan R,
09.00 B
supporting function: DSIA (Denso sales Arsyil
Indonesia)
10.00 ALL Opening Meeting - ALL
Top Management Discussion: Business - Masaya Nakamura,
Bagus S, Akihiko
10.30 A, B Planning Yasuda, Asep S,
Include risk/impact of Covid 19 to business. Wicak, Iwan R, Rully
- Asep S, Frengki W,
Review and Improvement
11.00 A Tina G, Iwan R,
Corporate ~ Floor management review
Rully
Customer complaint handling -
Including the connectivity with remote Arko, Didi, Arsyil,
11.00 B
supporting function: DSIA (Denso sales Fikran
Indonesia)
12.00 ALL Break - ALL
New model, Production Engineering for
Advanced Product Quality Planning
process Note :
Bagus M, Wardana,
Review connectivity & interaction with Prepare for
13.00 A Dwi J, Ibnu,
remote support function TICO & Denso Project D55L
Rachman
Japan – and support of sales by Denso 10SA11C
Sales Indonesia
CSR: Ford & GM
Internal quality audit
13.00 B - Rully , Fikran
CSR: Ford, GM
Safety, Health, Environment (SHE) Maulia E, Febri,
15.00 B -
Management. Rully
Notes to Client:
Times are approximate and will be confirmed at the opening meeting prior to commencement of the audit.
0 16.2.2021 First issue based on the audit planning process rules 5.7.2 requirements
1 10.3.2021 Change audit plan regarding to : auditor team change- and used version 5 format
Audit Cycle
Process Description Initial / 1st Surv 2nd Surv Recert
Recert
Business Planning X O O O
Customer Complaint X O O O
Internal quality audit X O O O
Production control : X O O
Production Plan & Material control
New model X O O O
Production Engineering for
Advanced Product Quality Planning
process :
Procurement including supplier X O O
management
Logistic, WH, & Export Import X O O
Raw Material Preservation process
Finish Good Material Preservation
Delivery
Tool management X O O
Plant Infrastructure maintenance : X O O
Production facilities Maintenance
Facilities /Utilities,
MIS (Information technology)
QA X O O O
1. Incoming Inspection
2. In Process Inspection
3. Final Test/Final Inspection/lay out
inspection
Measurement and monitoring
equipments controls
HR & Training : Recruitment & Training X O O
Name and Location of Support Function (only Option 1 or CSF)
Denso Sales Indonesia
X- SGS O- SGS O - SGS O- SGS
Indonesia Indonesia Indonesia Indonesia
TICO- Compressor Division
Audit by Audit by Audit by Audit by
DQS DQS DQS DQS
Denso corporation
Audit by Audit by Audit by Audit by
DQS DQS DQS DQS
Manufacturing Process Name & Operational Shifts
Compressor with Clutch Assembly X O O O
Shift pattern : 1, 2 2 shifts 2 shifts 1 shift – 2 shifts
S2
Machining X O O O
Shift pattern : 1, 2 2 Shift 1 Shift – 1 Shift – 2 shifts
Cylinder; Housing, Shaft, Piston S2 S1
Magnetic Clutch X O O O
Shift pattern : 1, 2 2 Shifts 2 Shifts 1 Shift 2 shifts
Stator, Rotor, Hub S1
Aluminum High Pressure Casting X O O O
Including T5 Heat treatment, Finishing 2 Shifts 1 Shift 2 shifts 2 shifts
(deburring and Shot blasting) S2
Shift pattern : 1, 2