You are on page 1of 2

SUBAN-24 WELLSITE SURFACE FACILITIES PROJECT

Contract No.: CS-18068662 - PT. Bina Sarana Putra


Description: Engineering, Procurement and Construction (EPC)
IDC Number: T-00000251
Interdiscipline Check Form
Responsible Person: Zenal Abidin - Sr. Project Engineer
Status Status
Document Number Rev Title
Received Review
ID-N-SB-CC0-SAD-WL-3M-3006 2 RE-AFC NC Pipe Box Culvert Drawing Section & Detail

Responsible Person to mark the action code column "RA,A,R,I,IA"


ACTION
NAME TITLE DATE IN DUE DATE INITIAL
CODE
PROJECT TEAM
Cahya Gumilar - TM Lead Projects RA
Yan Silvia - TM Lead Projects Engineer RA
Zenal Abidin - Sr. Project Engineer A
Tutur Widodo - Sr. Process Engineer
Arindra Haryonuranto - Sr. Mec/Piping Engineer
Ferdi Okdinurza- Sr. Instrument Engineer
Ardhyan Seto Prabowo - Sr. Electrical Engineer
Yama Syafei - Sr. Civil Engineer R NC
Rendra Oki Saputra - QA/QC Coordinator
Hardiono Kusumodewo - Construction Engineer
Rosa V. Damayanti - TM Lead W&P Support
Mira Maulidiana - Coord. Planning & Risk Mgt.
Yudith - Contract Specialist
Novan Adrian - Proc. & Material Coordinator
Golfried Sinaga - HSE Advisor
OPERATIONS TEAM
Hendy R. Hidayat - Unit Owner RA
Edi Sandjaya - OA Rep. Projects R

ACTION CODES:

RA - Reviewer Approval (Action, Review and Collect Comments), A - Accountable, R - Reviewer, I - Information, IA - Information w/o Attch

DOCUMENT REVIEW STATUS SIGNATURE (RESPONSIBLE


 Not Approved PERSON):

 Returned without Comments  Approved with Comments


 Returned with Comments  Approved without Comments
Next Issue as follows:

 for Approval for Construction for Purchase for Use


 for Bid for Design Others
 Approved: DATE:
 for Approval for Construction for Purchase for Use
Dec-07-2020
 for Bid for Design Others

COMMENTS:

File Ref: N-SB-136


PLEASE RETURN THE DOCUMENT TO RESPONSIBLE PERSON BY 0-Jan-00
Digitally signed by
Ocky Meilianie P
Date: 2020.12.03
10:01:54 +07'00'

You might also like