20210616works Progress
20210616works Progress
volume of
concrete temperature of
FOUNDATION concrete Date
class weather (C°)
(m3)
N°
1 CCR C30 20 6/11/2021 18
2 Work shop C30 30 6/12/2021 19
DIESEL GENERATOR
C30 6/13/2021 23
3 SHELTER
4 DIESEL STORAGE TANK C30 30 6/13/2021 22.4
POWER DISTRIBUTION
C30 6/13/2021 23.5
5 ROOM
WATER TREATMENT
C30 15 6/14/2021 23
6 PACKAGE SHELTER
fire station
C30 27 6/15/2021 23.6
7 car parking
8 GH site C15 6 6/15/2021 /
COMMUNICATION TOWER C30
9 47 6/16/2021 24.80
DIESEL GENERATOR
10 C30 18 6/17/2021 27.00
PACKAGE
LAUNDRY ROOM
+RECREATION BUILDING
11 +PRAYER ROOM+FREEZER C30 12 6/17/2021 27.00
ROOM
12 SEPTIC TANK C40 4 6/18/2021 26.00
13 CANTEEN+ 01 CA C30 8 6/18/2021 26.00
14 07 CA -dormitory C30 12 6/19/2021 28.00
15 SEWAGE WATER UNIT C40 8 6/19/2021 28.00
16 15 CHECK PITS SLABS C40 8 6/19/2021 28.00
temperature
number of
of concrete slump test (cm) COATING
samples
(C°)
21 18.5 6 start
23 17 6 start
19 6 start
26 17 6 start
16.3 6
start
29 18 6
start
27.4 18 6
start
/ / /
start
28.00 19.00 6.00 start
29.20 18.00 6.00 start
27.50 19.00 6.00 start
27.00 19.00 6.00 start
27.00 19.00 start
6.00
28.00 19.00
start
28.00 18.00 6.00 start
28.00 18.50 start
6.00
28.00 18.50
start
27.00 18.50 6.00 start
27.00 18.00 6.00 start
28.00 19.00 6.00
not yet
28.00 19.00 6.00
not yet
28 19 6
not yet
28 19 6
not yet
1 Rebar worker 14
2 Wood worker 4
3 Concrete worker 3
4 Excavater /
5 Loader 1
6 Truck /
7
8