You are on page 1of 2

Form 1.

3 Identifying Training Gaps


Summary of Current Competencies versus Required Competencies
Required Units of Current Training
Competency/Learning Competencies Gaps/Requirements
Outcomes based on CBC
1. Install domestic refrigeration and air-conditioning (DomRAC)
units
1.1. Conduct survey Conduct survey
1.2. Install DomRAC Install DomRAC
electrical circuit electrical circuit
1.3. Install DomRAC unit Install DomRAC
unit
1.4. Conduct performance Conduct
test performance test
2. Service and maintain domestic refrigeration and air-conditioning
(DomRAC) units
2.1. Clean and replace air Clean and replace
filter air filter
2.2. Service evaporator/ Service
condenser evaporator/
condenser
2.3. Maintain fan motor Maintain fan
assembly motor assembly
2.4. Service electrical power Service electrical
and control circuits power and control
circuits
2.5. Accomplish service and Accomplish service
maintenance report and maintenance
report
3. Trouble shoot domestic refrigeration and air-conditioning
(DomRAC) units
3.1. Plan and prepare for Plan and prepare
troubleshooting and for
repair troubleshooting
and repair
3.2. Identify and repair Identify and
faults/troubles repair
faults/troubles
Date Developed: Document No.
Form 1.3
April 2021 ICC-VGD03-CBLM01
Identifying
Training Gaps on Date Revised: Issued by:
DOMESTIC Page
REFRIGERATION Developed by: 1 of 2
Group 2 HVACR-3A Revision #00
AND AIR-
CONDITIONING
(DOMRAC NCII)
3.3. Perform refrigerant Perform
recovery/ recycling and refrigerant
retrofitting/ conversion recovery/
on domestic recycling and
refrigeration and air- retrofitting/
conditioning unit conversion on
domestic
refrigeration and
air-conditioning
unit
3.4. Test-run repaired unit Test-run repaired
unit

Date Developed: Document No.


Form 1.3
April 2021 ICC-VGD03-CBLM01
Identifying
Training Gaps on Date Revised: Issued by:
DOMESTIC Page
REFRIGERATION Developed by: 2 of 2
Group 2 HVACR-3A Revision #00
AND AIR-
CONDITIONING
(DOMRAC NCII)

You might also like