Professional Documents
Culture Documents
00006
PRODUCT EVALUATION FOR HEAT TREATMENT PROCESS Date: 5/24/2021
Revision: 5242021
HAMMER STRUT PIN FIRING PIN BUSHING 20022 SEAR PIN 4538AS
NOTE: THERE IS NO CHANGES SPECIFICATION BEFORE AND AFTER THE HEAT TREATMENT PROCESS
THEREFORE NO NEED TO CHANGE THE SPECIFICATION/TOLERANCE (TOTAL LENGTH, DIAMETER) OF THE PRODUCT IN OUR DATA
PROCESS REPORT.
GEORGE LAO
PRESIDENT
Doc No: SOP.21.0008
PRODUCT EVALUATION FOR HEAT TREATMENT PROCESS Date: 5/24/2021
Revision: 5262021
Hardening
Part Name Pre-heat Stress-relief Hardening Quench Tempering Hardness
Temp C° Soaking Time Temp C° Soaking Time Temp C° Soaking Time Temp C° Soaking Time HRC
550 1 Hour 650 1 Hour 850 1.5 Hour Oil 400-440 2 hours 40-48
Barrel Link Pin 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 400-440 2 hours 40-48
Firing Pin Bushing 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 500-550 2 hours 32-38
Firing Pin 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 350-400 2 hours 44-48
Main Spring Housing Pin Retainer 4551 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 440-480 2 hours 38-48
Main Spring Housing Pin 4550 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 400-440 2 hours 40-48
Main Spring Housing Pin 4550L 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 400-440 2 hours 44-48
Main Spring Housing Pin Retainer 38051 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 520-560 2 hours 25-30
Safety Lock Plunger 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 380-440 2 hours 44-48
Searpin 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 400-440 2 hours 40-48
Hammer Strut Pun 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 420-460 2 hours 38-46
Cylinder Stop Pin 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 480-520 2 hours 30-38
Cylinder Lock 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 380-420 2 hours 44-48
Mainspring Cap 550 1 Hour 650 1 Hour 850 1.5 Hour Oil 380-520 2 hours 38-52
GEORGE LAO
PRESIDENT
Doc No: SOP. 21. 00006
PRODUCT EVALUATION FOR HEAT TREATMENT PROCESS Date: 5/24/2021
Revision: 5242021
HAMMER STRUT PIN FIRING PIN BUSHING 20022 SEAR PIN 4538AS
0.305 0.93 0.305 0.93 0.256 0.312 0.256 0.312 0.862 0.108 0.862 0.108
0.303 0.93 0.303 0.93 0.256 0.312 0.256 0.312 0.863 0.107 0.863 0.107
0.302 0.93 0.302 0.93 0.256 0.312 0.256 0.312 0.862 0.108 0.862 0.108
0.300 0.93 0.300 0.93 40HRC- 0.256 0.312 0.256 0.312 36HRC- 0.864 0.108 0.864 0.108 46HRC-
0.301 0.93 0.301 0.93 42HRC 0.256 0.312 0.256 0.312 38HRC 0.862 0.108 0.862 0.108 48 HRC
0.304 0.93 0.304 0.93 0.256 0.312 0.256 0.312 0.862 0.108 0.862 0.108
0.301 0.93 0.301 0.93 0.257 0.312 0.257 0.312 0.864 0.108 0.864 0.108
0.301 0.93 0.301 0.93 0.257 0.312 0.257 0.312 0.864 0.108 0.864 0.108
0.301 0.93 0.301 0.93 0.256 0.312 0.256 0.312 0.861 0.108 0.861 0.108
TOTAL DIAMETE TOTAL HRC TOTAL TOTAL HRC TOTAL TOTAL HRC
LENGTH R LENGTH DIAMETER 38-48 LENGTH DIAMETER LENGTH DIAMETER 38-46 LENGTH DIAMETER LENGTH DIAMETER 40-48
0.527 0.170 0.527 0.170 0.202 0.158 0.202 0.158 0.609 0.132 0.609 0.132
0.529 0.167 0.529 0.167 0.201 0.158 0.201 0.158 0.609 0.133 0.609 0.133
0.525 0.170 0.525 0.170 0.194 0.157 0.194 0.157 0.609 0.133 0.609 0.133
0.527 0.170 0.527 0.170 0.199 0.157 0.199 0.157 0.609 0.132 0.609 0.132
0.523 0.171 0.523 0.171 42HRC- 0.203 0.157 0.203 0.157 40HRC- 0.609 0.133 0.609 0.133 42HRC-
0.526 0.170 0.526 0.170 46HRC 0.199 0.157 0.199 0.157 42HRC 0.609 0.133 0.609 0.133 47HRC
0.527 0.170 0.527 0.170 0.198 0.158 0.198 0.158 0.609 0.133 0.609 0.133
0.529 0.169 0.529 0.169 0.198 0.157 0.198 0.157 0.609 0.133 0.609 0.133
0.527 0.169 0.527 0.169 0.198 0.157 0.198 0.157 0.609 0.133 0.609 0.133
0.527 0.169 0.527 0.169 0.198 0.157 0.198 0.157 0.609 0.133 0.609 0.133
NOTE: HARDNESS RESULT OF ALL PRODUCT AS SAMPLE WELL PASSED DURING MHIPCOR QC INSPECTION.
Doc No: SOP.21.0008
PRODUCT EVALUATION FOR HEAT TREATMENT PROCESS Date: 6/16/2021
Revision: 5262021
THEREFORE: for hardening process, it will consumed a total of Note: after conducting 3 times of evaluation process we are
7 hours and 15 minutes to finished the operation. now reached the minimum hardened standard range of 40-48
QUENCHING PROCESS HRC.
OBSERVATION/SUGGESTED SOLUTION:
GEORGE LAO
PRESIDENT
Doc No: SOP.21.0008
FINAL EVALUATION FOR HEAT TREATMENT PROCESS Date: 5/24/2021
Revision: 5262021
OBSERVATION/SUGGESTED SOLUTION:
IN OUR FIRST TRIAL WE USED A WOOD CHARCOAL
BUT IN THIS PROCESS WE USED ALREADY A
COCONUT CHARCOAL THAT MIGHT HELP THE HEAT
TREATMENT MACHINE, TO CONTROL THE HEATING
AND HARDENED PROCESS.
NEEDED TO FIXED/PREPARED
QUENCHING OIL #32
CONTROL PANEL MONITOR
PRODUCTION AREA
GEORGE LAO
PRESIDENT
Doc No: SOP. 21. 00021
HEAT TREATMENT PROCESS Date: 6/30/2021
IMPROVEMENT PROPOSAL
Revision: 6302021
PPE's NEEDED
TOOLS NEEDED
QUENCHING BOX
HARDENING BOX
PPE'S NOTE: WE NOW COO
REMARKS
OUR OPERATOR IN HEAT TREATMENT PROCESS IS NOW READY TO OPERATE, BY FOLLOWING THE STANDARD WORK
INSTRUCTION IN THIS PROCEDURE, WE TRY AND PRACTICE ALMOST FIVE (5) TIMES TO PASSED AND REACH THE
REQUIRED STANDARD HRC IN EACH PRODUCT. HOWEVER THE LOCATION/FACILITY OF OUR PRODUCTION INCLUDING
THE PPE's ,IS NEED OF MORE IMPROVEMENT FOR US TO HAVE COMPLETE AND SAFE OPERATION.
PPE's NEEDED
SAMPLING
REQUIRED HRC HARDENED RESULT STATUS
RANGE HRC
PROJECT NAME PART NAME
45HRC
45HRC
FIRING PIN SPECIAL 4509 44-48 HRC 45HRC PASSED
46HRC
45HRC
TOOLS NEEDED
QUENCHING BOX
HARDENING BOX NOTE: THE COORDINATION OF OUR SAFETY OFFICER IS
NECESSARY TO ASSURE THE FACILITY NEEDED IN HEAT TREAT
PPE'S PROCESS FOR THE SAFETY OF OUR OPERATOR AND THE
COMPANY
REMARKS
OUR OPERATOR IN HEAT TREATMENT PROCESS IS NOW READY TO OPERATE, BY FOLLOWING THE STANDARD WORK
INSTRUCTION IN THIS PROCEDURE, WE TRY AND PRACTICE ALMOST FIVE (5) TIMES TO PASSED AND REACH THE
REQUIRED STANDARD HRC IN EACH PRODUCT. HOWEVER THE LOCATION/FACILITY OF OUR PRODUCTION
INCLUDING THE PPE's ,IS NEED OF MORE IMPROVEMENT FOR US TO HAVE COMPLETE AND SAFE OPERATION.
JESSIE FELIZARTA CAROLYN S. TABACO LEVI ESPESO CELSO BALLON GLENDA SOMBERO
PLANT OFFICER IN SAFETY OFFICER ASST. MANAGER
PREPARED BY: QC HEAD CHARGE
CONTROL NO. OQCA-00-006 ISSUED DATE:
GEORGE LAO
PRESIDENT