Professional Documents
Culture Documents
1 General Requirements (See other sheet for Breakdown of General Requirements for MEPF Package)
2 Duct Works
2.1 Galvanized Iron Sheets
a #26 3,604.70 sqm 133.93 345.15 479.08 1,726,940.96
b #24 4,082.60 sqm 206.28 536.90 743.18 3,034,100.84
c #22 3,800.48 sqm 270.94 582.92 853.86 3,245,066.99
d #20 75.00 sqm 338.67 636.61 975.28 73,145.76
e #18 N/A sqm 0.00
f Others (please specify) 0.00 0.00
Sub - total 0.00 0.00 8,079,254.55
2.2 Black Iron Sheets 0.00 0.00
a #16 808.00 sqm 425.80 1,840.80 2,266.61 1,831,418.57
b Others (please specify) 0.00 0.00
Sub - total 0.00 0.00 1,831,418.57
2.3 Duct Insulation 0.00 0.00
a 50 mm thick (Fiber Glass Insulation) 808.00 sqm 288.69 230.10 518.79 419,178.86
b 25 mm thick 8,140.30 sqm 383.93 211.70 595.63 4,848,563.21
c Others (please specify) 0.00 0.00 0.00
Sub - total 0.00 0.00 5,267,742.07
2.4 Rubber Insulation 0.00 0.00
a 15 mm thick 77.00 sqm 291.96 211.70 503.66 38,781.88
b 12 mm thick 2,916.00 sqm 291.96 211.70 503.66 1,468,674.64
c Others (please specify) 0.00 0.00
Sub - total 0.00 0.00 1,507,456.52
2.5 Flexible Duct 0.00 0.00
a 350 mm Ø 6.00 lm 428.61 291.46 720.07 4,320.43
b 300 mm Ø 33.00 lm 350.05 276.12 626.17 20,663.60
c 250 mm Ø 6.50 lm 293.71 276.12 569.82 3,703.84
d 200 mm Ø 669.00 lm 240.21 260.78 500.98 335,157.05
e 100 mm Ø 27.00 lm 133.29 260.78 394.06 10,639.69
f Others (please specify) 0.00 0.00 0.00
Sub - total 0.00 0.00 374,484.61
3 Pipes Works 0.00 0.00
3.1 Black Iron Pipes 0.00 0.00
a 350 mm Ø lm 0.00 0.00 0.00 0.00
b 250 mm Ø 219.22 lm 2,845.38 843.70 3,689.08 808,720.20
c 200 mm Ø 114.44 lm 1,886.76 705.64 2,592.40 296,674.46
d 150 mm Ø 226.22 lm 1,290.78 536.90 1,827.68 413,457.45
e 125 mm Ø 193.63 lm 1,008.93 490.88 1,499.81 290,408.69
f 100 mm Ø 531.00 lm 743.90 414.18 1,158.08 614,940.67
g 80 mm Ø 144.84 lm 480.36 352.82 833.18 120,677.58
h 65 mm Ø 39.18 lm 389.29 291.46 680.75 26,671.79
i 50 mm Ø 1,025.55 lm 233.63 230.10 463.73 475,580.50
j 38 mm Ø 1,645.56 lm 174.86 184.08 358.94 590,653.19
k 32 mm Ø 725.13 lm 151.04 153.40 304.45 220,763.24
l 25 mm Ø 1,093.07 lm 110.71 138.06 248.78 271,930.44
m 20 mm Ø 3,429.00 lm 71.73 122.72 194.46 666,787.42
n Others (please specify) - 0.00 0.00 0.00 0.00
300 mm Ø 321.00 lm 3,454.62 951.08 4,405.70 1,414,228.55
400 mm Ø 211.00 lm 5,505.26 1,073.80 6,579.06 1,388,182.19
0.00 0.00
Sub - total 0.00 0.00 7,599,676.37
3.2 Black Iron Elbow 0.00 0.00
a 350 mm Ø N/A pcs
b 250 mm Ø 102.00 pcs 3,195.54 2,684.50 5,880.04 599,763.64
c 200 mm Ø 109.00 pcs 2,410.36 2,193.63 4,603.98 501,834.05
d 150 mm Ø 69.00 pcs 1,249.20 1,718.08 2,967.28 204,742.10
e 125 mm Ø 24.00 pcs 758.93 1,441.96 2,200.89 52,821.43
f 100 mm Ø 92.00 pcs 322.50 1,150.50 1,473.00 135,516.00
g 80 mm Ø 40.00 pcs 256.07 813.02 1,069.09 42,763.57
h 65 mm Ø 112.00 pcs 174.64 690.30 864.95 96,874.00
i 50 mm Ø 358.00 pcs 133.93 214.76 348.69 124,830.13
j 38 mm Ø 372.00 pcs 121.43 184.08 305.51 113,649.32
BRIGHT VENTURES REALTY INC
ITEM DESCRIPTION RATES AMOUNT
NO QTY UNIT
MATERIAL COST LABOR COST TOTAL
at 65 x 32 mm Ø N/A pcs
au 65 x 25 mm Ø N/A pcs
av 65 x 20 mm Ø N/A pcs
aw 50 x 38 mm Ø 6.00 pcs 468.75 368.16 836.91 5,021.46
ax 50 x 32 mm Ø 10.00 pcs 210.71 368.16 578.88 5,788.75
ay 50 x 25 mm Ø 59.00 pcs 136.61 368.16 504.77 29,781.30
az 50 x 20 mm Ø 12.00 pcs 136.61 368.16 504.77 6,057.21
ba 38 x 32 mm Ø 11.00 pcs 160.71 291.46 452.18 4,973.96
bb 38 x 25 mm Ø 147.00 pcs 160.71 291.46 452.18 66,470.25
bc 38 x 20 mm Ø 18.00 pcs 160.71 291.46 452.18 8,139.21
bd 32 x 25 mm Ø 85.00 pcs 160.71 291.46 452.18 38,435.18
be 32 x 20 mm Ø 22.00 pcs 160.71 291.46 452.18 9,947.93
bf 25 x 20 mm Ø 379.00 pcs 108.04 230.10 338.13 128,152.76
bg Others (please specify) 0.00 0.00
400 x 300 mm Ø 2.00 pcs 6,036.61 6,335.43 12,372.04 24,744.07
400 x 250 mm Ø 24.00 pcs 6,036.61 6,335.43 12,372.04 296,928.86
400 x 200 mm Ø 10.00 pcs 6,036.61 6,335.43 12,372.04 123,720.36
400 x 150 mm Ø 6.00 pcs 6,036.61 6,335.43 12,372.04 74,232.21
300 x 20 mm Ø N/A pcs
300 x 50 mm Ø N/A pcs
300 x 40 mm Ø N/A pcs
300 x 250 mm Ø 6.00 pcs 7,040.18 4,786.08 11,826.26 70,957.55
250 x 250 mm Ø 2.00 pcs 5,131.25 4,049.76 9,181.01 18,362.02
300 x 100 mm Ø 2.00 pcs 4,225.89 4,786.08 9,011.97 18,023.95
300 x 150 mm Ø 6.00 pcs 5,131.25 4,786.08 9,917.33 59,503.98
Sub - total 0.00 0.00 1,135,246.81
3.5 Black Iron Reducer 0.00 0.00
a 350 x 300 mm Ø N/A pcs
b 250 x 200 mm Ø 18.00 pcs 5,535.71 2,500.42 8,036.13 144,650.41
c 250 x 150 mm Ø 2.00 pcs 4,821.43 2,500.42 7,321.85 14,643.70
d 250 x 80 mm Ø 2.00 pcs 4,910.71 2,500.42 7,411.13 14,822.27
e 200 x 150 mm Ø 10.00 pcs 3,873.21 2,009.54 5,882.76 58,827.59
f 200 x 100 mm Ø N/A pcs
g 200 x 125 mm Ø 2.00 pcs 3,839.29 2,009.54 5,848.83 11,697.66
h 150 x 125 mm Ø 6.00 pcs 3,691.96 1,595.36 5,287.32 31,723.93
i 150 x 100 mm Ø 14.00 pcs 3,691.96 1,595.36 5,287.32 74,022.50
150 x 80 mm Ø 2.00 pcs 3,691.96 1,595.36 5,287.32 10,574.64
j 150 x 65 mm Ø N/A pcs
k 125 x 100 mm Ø 12.00 pcs 3,440.18 1,319.24 4,759.42 57,113.04
l 125 x 65 mm Ø 2.00 pcs 3,440.18 1,319.24 4,759.42 9,518.84
m 100 x 80 mm Ø 11.00 pcs 3,125.00 1,027.78 4,152.78 45,680.54
n 100 x 65 mm Ø 16.00 pcs 3,125.00 1,027.78 4,152.78 66,444.43
o 100 x 50 mm Ø 2.00 pcs 3,125.00 1,027.78 4,152.78 8,305.55
p 100 x 38 mm Ø 4.00 pcs 4,348.21 1,027.78 5,375.99 21,503.96
q 100 x 32 mm Ø N/A pcs
r 80 x 65 mm Ø 11.00 pcs 1,267.86 751.66 2,019.52 22,214.70
s 80 x 50 mm Ø 4.00 pcs 1,267.86 751.66 2,019.52 8,078.07
t 80 x 32 mm Ø N/A pcs
u 65 x 50 mm Ø 5.00 pcs 250.00 628.94 878.94 4,394.69
v 65 x 38 mm Ø 5.00 pcs 250.00 628.94 878.94 4,394.69
w 50 x 38 mm Ø 37.00 pcs 174.11 214.76 388.87 14,388.04
x 50 x 32 mm Ø 4.00 pcs 174.11 214.76 388.87 1,555.46
y 50 x 25 mm Ø 6.00 pcs 174.11 214.76 388.87 2,333.20
z 50 x 20 mm Ø 2.00 pcs 160.71 214.76 375.47 750.95
aa 38 x 32 mm Ø 86.00 pcs 160.71 184.08 344.79 29,652.34
ab 38 x 25 mm Ø 9.00 pcs 160.71 184.08 344.79 3,103.15
ac 38 x 20 mm Ø 4.00 pcs 125.00 184.08 309.08 1,236.32
ad 32 x 25 mm Ø 95.00 pcs 125.00 153.40 278.40 26,448.17
ae 32 x 20 mm Ø 2.00 pcs 125.00 153.40 278.40 556.80
af 25 x 20 mm Ø 396.00 pcs 125.00 138.06 263.06 104,172.75
ag Others (please specify) 0.00 0.00 0.00 0.00
300 x 250 mm Ø 4.00 pcs 10,714.29 3,052.66 13,766.95 55,067.79
65 x 32 mm Ø 2.00 pcs 428.57 628.94 1,057.51 2,115.02
Sub - total 0.00 0.00 849,991.20
3.6 Black Iron Union Patente 0.00 0.00
a 80 mm Ø N/A pcs
b 65 mm Ø N/A pcs
c 50 mm Ø 36.00 pcs 491.96 368.16 860.13 30,964.50
d 38 mm Ø 28.00 pcs 321.43 291.46 612.89 17,161.00
BRIGHT VENTURES REALTY INC
ITEM DESCRIPTION RATES AMOUNT
NO QTY UNIT
MATERIAL COST LABOR COST TOTAL
6.12 Supply and Installation of Smoke Evacuation Fans and Accessories 0.00 0.00
SEF 1 - Centrifugal, SWSI Forward Curve Type, 5,100
a CMH, 250 Pa ESP, Belt Drive, 1.5 Kw, 400V/3Ph/60Hz, 4.00 sets 47,232.14 2,761.21 49,993.35 199,973.39
50 kg operating weight
b Others (please specify) 0.00 0.00
Sub - total 0.00 0.00 199,973.39
6.13 Supply and Installation of Exhaust Fans and Accessories - Basement, Lower Grou 0.00 0.00
EF 1 - Ceiling Cassette Type, 170 CMH, 50 Pa ESP,
a Direct Drive, 450 RPM, 0.03 Kw, 220V/1Ph/60Hz, 5.2 kg 9.00 sets 2,678.57 920.40 3,598.97 32,390.76
operating weight
a ET 1 - Closed Type, 500 liters capacity, 800 mm x 1,200 1.00 sets 40,625.00 17,445.00 58,070.00 58,070.00
mm
b Others (please specify) 0.00 0.00
Sub - total 0.00 0.00 58,070.00
6.17 Supply and Installation of Air Separator and Accessories 0.00 0.00
a AS 1 -3,600 gpm capacity, 6.0 f/s, 900 mm x 1,700 mm 1.00 sets 665,178.57 42,611.14 707,789.71 707,789.71
VAT 11,405,796.26
4 Temporary Facilities
a. Site Office
b. Warehouse / Storage for OSM
c. Quarters
d. Staging Area
5 Temporary Utilities
a. Power Consumptions
b. Water Consumption
c. Telephone/Communication
d. Security Service
7 Other Items
Others (Please Specify)
1. Service Vehicle
2. Fuel & Oil
3. Site Management
4. Contractor's Employee Accident Insurance & CGL
5. Bureau of Fire Protection
6. Representation
SUB-TOTAL ( DIV. 1 )
SUB-TOTAL A. 267,380.01
Page 18 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 100,672.71
SUB-TOTAL D. 793,225.18
SUB-TOTAL 1. 1,161,277.91
A.1.4 BUSDUCT (Riser) : 500A (Copper) w/ Plug-In C.B 1 lot N/A N/A
SUB-TOTAL A. 917,902.03
Page 19 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 6,584,120.87
SUB-TOTAL C. 858,554.57
LVSG2 - EDP
Vertical Elbow
Horizontal Elbow
Flexible braided connector
Flange end
Horizontal hangers
Page 20 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
MCB1 - LVSG1
Vertical Elbow
Horizontal Elbow
Flexible braided connector
Flange end
Horizontal hangers
MCB2 - LVSG2
Vertical Elbow
Horizontal Elbow
Flexible braided connector
Flange end
Horizontal hangers
LVSG 2 - MDPRW
Vertical Elbow
Horizontal Elbow
Flexible braided connector
Flange end
Horizontal hangers
Vertical spring hangers
Vertical rigid support
Page 21 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
Page 22 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL E. 4,849,460.13
SUB-TOTAL 2. 13,210,037.59
B. Conduits and fittings All PVC Embedded in Slab and Column BY DATEM,
C.1 Embedded in Slab and Columns Inc.
1. Basement Level
15mmø PVC Pipe lgs
20mmø PVC Pipe lgs
15mmø PVC L/A prs
20mmø PVC L/A prs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ Cover 4 11/16 x 4 11/16 pcs
Page 23 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
6. Second Floor
15mmø PVC Pipe lgs
20mmø PVC Pipe lgs
15mmø PVC L/A prs
20mmø PVC L/A prs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ Cover 4 11/16 x 4 11/16 pcs
7. Third Floor
15mmø PVC Pipe lgs
20mmø PVC Pipe lgs
15mmø PVC L/A prs
20mmø PVC L/A prs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ Cover 4 11/16 x 4 11/16 pcs
8. Fourth Floor
15mmø PVC Pipe lgs
20mmø PVC Pipe lgs
15mmø PVC L/A prs
20mmø PVC L/A prs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ Cover 4 11/16 x 4 11/16 pcs
9. Fifth Floor
15mmø PVC Pipe lgs
20mmø PVC Pipe lgs
15mmø PVC L/A prs
20mmø PVC L/A prs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ Cover 4 11/16 x 4 11/16 pcs
Page 24 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
C2. Exposed
50mmø EMT Pipe N/A lgs N/A
32mmø EMT Pipe N/A lgs N/A
25mmø EMT Pipe N/A lgs N/A
20mmø EMT Pipe 162 lgs 152.80 69.30 222.11 35,981.36
15mmø EMT Pipe N/A lgs N/A
50mmø EMT Coupling N/A pcs N/A
32mmø EMT Coupling N/A pcs N/A
25mmø EMT Coupling N/A pcs N/A
20mmø EMT Coupling 41 pcs 13.15 10.22 23.38 958.38
N/A N/A
15mmø EMT Coupling pcs
50mmø EMT Connector N/A pcs N/A
32mmø EMT Connector N/A pcs N/A
25mmø EMT Connector N/A pcs N/A
20mmø EMT Connector 117 pcs 24.69 10.22 34.91 4,084.55
15mmø EMT Connector N/A pcs N/A
50mmø EMT Elbow N/A pcs N/A
32mmø EMT Elbow N/A pcs N/A
25mmø EMT Elbow N/A pcs N/A
90mmø IMC Pipe N/A lgs N/A
80mmø IMC Pipe N/A pcs N/A
65mmø IMC Pipe 96 lgs 1,304.38 242.00 1,546.38 148,452.86
90mmø I,MC Locknut w/ Bushing N/A prs N/A
80mmø IMC Locknut w/ Bushing N/A pcs N/A
65mmø IMC Locknut w/ Bushing 36 prs 189.41 189.41 6,818.79
90mmø IMC Elbow w/ Coup. N/A pcs N/A
80mmø IMC Elbow w/ Coup. N/A pcs N/A
65mmø IMC Elbow w/ Coup. 18 pcs 929.73 69.30 999.04 17,982.64
Others (Pls. specify below this point)
C. Conduits and fittings
100mmø IMC Pipe 68 lgs 2,772.81 432.88 3,205.69 217,986.75
40mmø IMC Pipe 257 lgs 613.98 172.70 786.68 202,175.82
25mmø IMC Pipe 269 lgs 398.96 161.33 560.29 150,717.46
15mmø IMC Pipe 599 lgs 199.50 109.07 308.57 184,834.29
100mmø Locknut w/ Bushing 45 prs 361.51 361.51 16,267.90
40mmø Locknut w/ Bushing 158 prs 52.00 52.00 8,215.29
25mmø Locknut w/ Bushing 179 prs 29.69 29.69 5,314.06
15mmø Locknut w/ Bushing 2,571 prs 12.34 12.34 31,730.04
100mmø Elbow w/ Coup. 14 pcs 3,042.46 138.61 3,181.07 44,534.94
40mmø Elbow w/ Coup. 55 prs 333.86 57.95 391.80 21,549.20
25mmø Elbow w/ Coup. 54 prs 150.69 28.40 179.09 9,670.70
15mmø EMT Locknut w/ Bushing
20mmø EMT Locknut w/ Bushing
Wire Guttter 800mm x 300mm x 200mm
SUB-TOTAL C. 1,107,275.02
Page 25 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
Square box w/ Cover 4 11/16 x 4 11/16 87 pcs 72.81 48.86 121.67 10,585.26
Pull box N/A pcs N/A
SUB-TOTAL D. 10,585.26
E. Wiring devices
Single C.O. w/ Ground 258 set 142.50 20.45 162.95 42,040.18
Duplex C.O. w/ Ground 451 sets 245.63 34.08 279.71 126,147.12
Weatherproof Duplex C.O. w/ Ground 4 sets 605.98 40.90 646.88 2,587.54
GFCI Single C.O. w/ Ground 20 sets 2,865.45 52.26 2,917.71 58,354.11
GFCI Duplex C.O. w/ Ground N/A sets N/A
Floor Outlet 26 sets 1,366.65 89.76 1,456.41 37,866.68
GUESTROOM :
Universal Single C.O. w/ Ground BY TENANT sets BY TENANT
Universal Single C.O. w/ Ground & w/ USB Charger BY TENANT sets BY TENANT
Universal Duplex C.O. w/ Ground BY TENANT sets BY TENANT
SUB-TOTAL E. 266,995.62
E. Wiring devices
Duplex Grounding type Convenience Outlet, HD, GFCI
Special purpose outlet (20A)
SUB-TOTAL F. 1,363,214.75
Page 26 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
4. Second Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Others (Pls. specify below this point)
5. Third Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
Others (Pls. specify below this point)
6. Fourth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
Others (Pls. specify below this point)
7. Fifth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
Page 27 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
8. Sixth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
Others (Pls. specify below this point)
9. Seventh Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
Others (Pls. specify below this point)
B2. Exposed
15mmø Flexible Metal Conduit 5,406 lm 18.13 11.36 29.48 159,380.46
15mmø Straight Connector 3,904 pcs 12.41 2.27 14.68 57,305.14
Others (Pls. specify below this point)
15mmø EMT Pipe 160 lgs 101.87 52.26 154.13 24,660.71
15mmø EMT Connector, Locknut w/ Bushing 160 prs 15.65 10.22 25.87 4,139.64
15mmø EMT Coupling 160 pcs 9.71 10.22 19.94 3,189.64
20mmø EMT Pipe
20mmø EMT Connector, Locknut w/ Bushing
SUB-TOTAL B. 248,675.61
D. Wiring devices
1-Gang Switch 213 sets 75.45 17.04 92.49 19,700.60
2-Gang Switch 63 sets 120.58 26.13 146.71 9,243.00
3-Gang Switch 77 sets 165.67 40.90 206.57 15,906.00
6-Gang Switch N/A sets N/A
3-Way Switch 58 sets 112.81 31.81 144.63 8,388.25
4-Way Switch 9 sets 481.56 46.58 528.14 4,753.29
2-Gang 3-Way Switch 6 sets 195.36 48.86 244.21 1,465.29
2-Gang 4-Way Switch N/A sets N/A
4-Gang Switch Bank N/A sets N/A
9-Gang Switch Bank 1 sets 504.11 121.57 625.68 625.68
Others (Pls. specify below this point)
6-Gang Switch Bank
12-Gang Switch Bank 1 sets 741.34 161.33 902.67 902.67
15-Gang Switch Bank
3-Gang 3-Way Switch 14 sets 384.82 38.63 423.45 5,928.25
Page 28 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
GUESTROOM :
1-Gang Switch BY TENANT sets BY TENANT
2-Gang Switch BY TENANT sets BY TENANT
Micro Light Switch BY TENANT sets 1,080.00 BY TENANT
Key Card w/ Switch BY TENANT sets 115.71 BY TENANT
964.29
SUB-TOTAL D. 80,643.13
GUESTROOM :
Pendant Light BY TENANT sets BY TENANT
Downlight BY TENANT sets BY TENANT
Wall Sconce BY TENANT sets BY TENANT
Night Light BY TENANT sets BY TENANT
SUB-TOTAL E. 4,171,061.79
Roofdeck
15mmø EMT Pipe
15mmø EMT Connector, Locknut w/ Bushing
Lighting Fixtures
Page 29 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
Pendant Light-1
Pendant Light-2
Pendant Light-3
Fluorescent lamp, outdoor type w/ LED equivalent
Recessed Downlights
600mm x 600mm Troffer Light
600mm x 1200mm Troffer Light
Strip Light
Strip Light Driver
LED Panel 600mm x 1200mm 168 sets 6,964.29 172.70 7,136.98 1,199,013.00
LED Strip Light 13 m 1,964.29 115.88 2,080.17 27,042.21
17-Gang Switch Bank 1 sets 1,382.14 228.37 1,610.51 1,610.51
Bulb for Lighting Fixtures 1 lot 357,142.86 357,142.86 357,142.86
Lighting Fixtures (Lightings that is Highlighted in Orange - OSM)
Wall Light @ Micro Restaurant 6 sets OSM 259.04 259.04 1,554.27
Recessed Downlights (special lightings) 1,746 sets OSM 389.70 389.70 680,409.96
DLI 112 sets 964.29 172.70 1,136.99 127,342.88
Lower Grond Mezzanine Floor
Others (Pls. specify below this point)
B2. Exposed
15mmø Flexible Metal Conduit 98 lm 18.13 11.36 29.48 2,889.25
15mmø Straight Connector 65 pcs 12.41 2.27 14.68 954.11
15mmø Angle Connector 65 pcs 19.91 2.27 22.18 1,441.61
15mmø EMT Pipe 10 lgs 101.87 52.26 154.13 1,541.29
15mmø EMT Coupling 10 pcs 9.71 10.22 19.94 199.35
Page 30 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
D. Wiring devices
2-Gang Switch 2 sets 120.58 26.13 146.71 293.43
3-Way Switch 1 sets 112.81 31.81 144.63 144.63
4-Way Switch 1 sets 481.56 46.58 528.14 528.14
SUB-TOTAL G. 3,026,470.15
Page 31 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
KWHR Meter 3ph, 400V (BMS Ready) 12 sets OSM 277.22 277.22 3,326.68
KWHR Meter Single Phase, 230V (BMS Ready) sets OSM 0.00 0.00
GUESTROOM PANELBOARD (w/ Contactor) BY TENANT BY TENANT
ECB's & Control Panel : By Mechanical Contractor
Others (Pls. specify below this point)
KWHR Meter 3ph, 400V, 125A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 200A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 400A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 300A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 40A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 100A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 75A, 3P (BMS Ready)
KWHR Meter 3ph, 400V, 4000A, 3P (BMS Ready)
ECB, 100A, 3P, 400V in NEMA-1 Encl.
EDP
LBS 1
LBS 2
SUB-TOTAL A.
Page 32 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 1,002,877.54
4. Second Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
5. Third Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
6. Fourth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Page 33 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
7. Fifth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
8. Sixth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
9. Seventh Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
A2. Exposed
50mmø IMC Pipe N/A lgs N/A
50mmø IMC Elbow N/A pcs N/A
50mmø IMC L&B 40 prs 82.72 82.72 3,308.93
15mmø Flexible Metal Conduit 1,475 lm 18.08 11.36 29.44 43,420.31
15mmø Straight Connector 991 pcs 12.41 2.27 14.68 14,546.46
Others (Pls. specify below this point)
Conduit & Fittings
50mmø EMT Pipe 80 lgs 482.42 184.05 666.48 53,318.04
50mmø EMT Elbow 8 pcs 264.01 69.30 333.31 2,666.48
50mmø PVC Coupling 80 p 79.42 63.63 143.04 11,443.57
50mmø EMT Connector w/ Bushing 40 pcs 120.36 63.63 183.99 7,359.46
25mmø EMT Pipe 12 lgs 213.62 103.39 317.02 3,804.19
25mmø EMT Elbow 8 pcs 66.03 21.59 87.62 700.98
25mmø EMT Coupling 8 pcs 18.75 55.67 74.42 595.32
25mmø EMT Connector w/ Bushing 8 37.19 55.67 92.86 742.91
15mmø EMT Pipe 12 lgs 101.87 52.26 154.13 1,849.55
15mmø EMT Coupling 12 pcs 9.71 10.22 19.94 239.22
15mmø EMT Connector w/ Bushing 8 prs 15.65 10.22 25.87 206.98
20mmø EMT Pipe 80 lgs 152.81 69.30 222.11 17,768.75
20mmø EMT Coupling 80 pcs 13.15 10.22 23.37 1,869.64
20mmø EMT Connector w/ Bushing 80 prs 31.64 10.22 41.86 3,348.93
Wires & Cables
1.25mm² TF Wire 5,114 m 16.38 2.27 18.65 95,385.23
SUB-TOTAL A. 262,574.97
Page 34 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 22,394.25
SUB-TOTAL C. 315,774.73
SUB-TOTAL E. 6,628,446.20
Page 35 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
4. Second Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
5. Third Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
6. Fourth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
7. Fifth Floor
Page 36 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
8. Sixth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
9. Seventh Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
C. Exposed
25mmø IMC Pipe N/A lgs N/A
25mmø IMC Elbow N/A pcs N/A
25mmø IMC L&B 72 prs 31.25 31.25 2,250.00
15mmø Flexible Metal Conduit 136 lm 18.08 11.36 29.44 4,003.50
15mmø Straight Connector 136 prs 12.41 2.27 14.68 1,996.29
Cable Tray N/A lgs N/A
Others (Pls. specify below this point)
32mmø PVC Pipe 585 lgs 107.25 82.63 189.88 111,077.11
32mmø PVC Elbow 64 pcs 21.00 12.71 33.71 2,157.54
pcs 0.00 0.00 0.00
32mmø PVC Adapter w/ Bushing 72 prs 36.05 0.00 36.05 2,595.60
20mmø PVC Pipe 24 lgs 54.00 76.27 130.27 3,126.47
pcs 0.00
20mmø PVC Adapter w/ Bushing 24 prs 15.20 15.20 364.80
SUB-TOTAL C. 349,975.59
SUB-TOTAL D. 23,993.14
E. Wires & Cables
1.25mm² TF Wire 6,023 lm 16.38 2.27 18.65 112,339.71
Page 37 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL E. 112,339.71
SUB-TOTAL F. 1,212,243.12
Page 38 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
4. Second Floor
20mmø PVC Pipe (1/2") lgs
25mmø PVC Pipe (3/4") lgs
20mmø PVC L/A pcs
25mmø PVC L/A pcs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ cover pcs
5. Third Floor
20mmø PVC Pipe (1/2") lgs
25mmø PVC Pipe (3/4") lgs
20mmø PVC L/A pcs
25mmø PVC L/A pcs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ cover pcs
6. Fourth Floor
20mmø PVC Pipe (1/2") lgs
25mmø PVC Pipe (3/4") lgs
20mmø PVC L/A pcs
25mmø PVC L/A pcs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ cover pcs
7. Fifth Floor
20mmø PVC Pipe (1/2") lgs
25mmø PVC Pipe (3/4") lgs
20mmø PVC L/A pcs
25mmø PVC L/A pcs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ cover pcs
8. Sixth Floor
20mmø PVC Pipe (1/2") lgs
Page 39 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
9. Ninth Floor
20mmø PVC Pipe (1/2") lgs
25mmø PVC Pipe (3/4") lgs
20mmø PVC L/A pcs
25mmø PVC L/A pcs
Utility box pcs
Junction box w/ Cover pcs
Square box w/ cover pcs
A2. Exposed
32mmø PVC Pipe 62 lgs 107.25 82.63 189.88 11,772.27
32mmø PVC Elbow 12 pcs 21.00 12.71 33.71 404.54
pcs 0.00 0.00 0.00
32mmø PVC Adapter w/ Bushing 41 pcs 36.05 0.00 36.05 1,478.05
40mmø PVC Pipe 15 lgs 135.75 95.34 231.09 3,466.31
40mmø PVC Elbow 5 pcs 30.60 19.07 49.67 248.34
pcs 0.00 0.00 0.00
40mmø PVC Adapter w/ Bushing 10 pcs 52.35 0.00 52.35 523.50
38mmø PVC Pipe N/A lgs 0.00 N/A
38mmø PVC Coupling (Compression Type) N/A pcs 0.00 N/A
38mmø PVC Connector (Compression Type) N/A pcs 0.00 N/A
38mmø PVC Elbow N/A pcs 0.00 N/A
65mmø PVC Pipe 36 lgs 240.00 127.12 367.12 13,216.18
65mmø PVC Elbow 14 pcs 66.90 22.25 89.15 1,248.03
pcs 0.00 0.00 0.00
65mmø PVC Adapter w/ Bushing 24 pcs 99.05 0.00 99.05 2,377.20
65mmø IMC Pipe N/A lgs N/A
65mmø IMC Coupling N/A pcs N/A
65mmø IMC Connector N/A pcs N/A
65mmø IMC Elbow N/A pcs N/A
75mmø IMC Pipe N/A lgs N/A
75mmø IMC Elbow N/A pcs N/A
75mmø IMC L&B N/A pcs N/A
Cable Tray N/A lgs N/A
Others (Pls. specify below this point)
4-75mmØ PVC in Lightweight Concrete Encaseme 1 lot 295,591.50 127,763.35 423,354.85 423,354.85
2-way handhole with ground rod 1 lot 75,030.00 38,252.50 113,282.50 113,282.50
75mmø PVC Pipe 72 lgs 335.25 152.54 487.79 35,120.82
75mmø Endbell 16 pcs 238.35 0.00 238.35 3,813.60
25mmø PVC Pipe 521 lgs 81.75 76.27 158.02 82,328.21
25mmø PVC Adapter w/ Bushing 929 pcs 22.80 0.00 22.80 1,933.83
4-75mmø PVC Pipe TELEPHONE Service Entrance by DATEM Inc. 0.00 by DATEM Inc.
pcs 0.00 0.00 0.00
25mmø PVC Elbow 455 pcs 10.50 24.15 34.65 15,766.68
RG - 6 13,984 m 10.45 4.54 14.99 209,635.14
SUB-TOTAL A. 919,970.05
Page 40 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 1,905,858.82
Page 41 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL C. 1,456,556.43
4. Second Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ Cover N/A pcs N/A
Page 42 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
5. Third Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
6. Fourth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
7. Fifth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
8. Sixth Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
9. Seventh Floor
15mmø PVC Pipe N/A lgs N/A
20mmø PVC Pipe N/A lgs N/A
15mmø PVC L/A N/A prs N/A
20mmø PVC L/A N/A prs N/A
Utility box N/A pcs N/A
Junction box w/ Cover N/A pcs N/A
Square box w/ cover N/A pcs N/A
A2. Exposed
25mmø PVC Pipe 4,092 lgs 81.75 69.34 151.09 618,260.28
pcs 0.00 0.00
25mmø PVC Adapter w/ Bushing 1,000 pcs 22.80 22.80 22,800.00
15mmø Flexible Metal Conduit 145 lm 18.08 11.36 29.44 4,268.44
15mmø Straight Connector 145 prs 12.41 2.27 14.68 2,128.39
Others (Pls. specify below this point)
25mmø PVC Elbow 412 pcs 10.50 11.56 22.06 9,088.72
20mmø PVC Pipe 120 lgs 54.00 46.22 100.22 12,026.40
pcs 0.00 0.00
20mmø PVC Adapter w/ Bushing 120 prs 15.15 15.15 1,818.00
SUB-TOTAL A. 670,390.23
Page 43 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL B. 63,305.24
SUB-TOTAL C. 0.00
SUB-TOTAL F. 0.00
A2. Exposed
50mmø PVC Pipe
50mmø Locknut/Bushing & Adapter
15mmø EMT Pipe
15mmø EMT Connector, Locknut w/ Bushing
Page 44 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
B. Exposed
20mmø EMT Pipe N/A lgs N/A
20mmø Coupling N/A pcs N/A
20mmø Connector N/A pcs N/A
32mmø EMT Pipe N/A lgs N/A
32mmø EMT L&B N/A pcs N/A
32mmø EMT Elbow N/A pcs N/A
Others (Pls. specify below this point)
SUB-TOTAL B. 0.00
C. Boxes, Pullboxes
Utility box N/A pcs N/A
Junction box N/A pcs N/A
Pull box N/A pcs N/A
SUB-TOTAL C. 0.00
D. Hangers, supports and consumables N/A lot N/A
E. Other Items to Complete the Work (Please Specify)
B. Boxes, Pullboxes
Utility box N/A pcs N/A
Junction box N/A pcs N/A
Pull box N/A pcs N/A
SUB-TOTAL B. 0.00
DIV 13 UPS
UPS KVA
SUB-TOTAL ( DIV. 13 )
SUB-TOTAL A. 0.00
B. Boxes, Pullboxes
Square Box pcs 0.00 0.00
Pull box pcs 0.00 0.00
SUB-TOTAL B. 0.00
Page 45 of 73
MATERIALS LABOR TOTAL
ITEM DESCRIPTION AEC QTY UNIT TOTAL AMOUNT
UNIT COST UNIT COST UNIT COST
SUB-TOTAL C. 0.00
Page 46 of 73
Project Title : Caticlan Hotel Project
Location : Barangay Union, Nabas Aklan
DATE : APRIL 5, 2018
BILL OF QUANTITIES
Equalizing Valve and Drain Valve for Fire Tank 1.00 lot 53,571.43 4,910.71 58,482.14 58,482.14
0.00
Provision for Pipe Sleeves for Fire Tank, Paddle Flanges include 1.00 lot 55,184.64 15,468.75 70,653.39 70,653.39
0.00
Provision for Vortex Plate and/or Suction Strainer 1.00 lot 57,589.29 2,522.55 60,111.84 60,111.84
0.00 0.00
TOTAL (VAT EX) 32,326,909.93
VAT 3,879,229.19
Basis of Proposal
1.) For Bidding Only Plans with sheet numbers FP1 - 1, FP3 - 1 to FP3 - 3, FP3 - 3a, FP3 - 4 to FP3 - 10 and FP5 - 1
issued by RMDA Architects
2.) Bid Bulletin No. 07 issued 15 December 2017 with attachment FP3 - 01 to FP3 - 10 and FP4 - 1, indicating
locations for Portable Fire Extingushers
Excluded Items
1.) Fire Water Tank Accessories (Manholes and Ladder rungs)
2.) Supply and Installation of NOVEC 1230 Protection for MDF, MATV and Server Rooms
3.) Blow up detail for Pump Room Piping Layout (not issued)
4.) Sheet Nos. FP2 - 1 to FP2 - 3 (not issued)
BILL OF QUANTITIES
PLUMBING SYSTEM
0.00 0.00
HDPE Fittings 0.00 0.00
90 (1/4 bend) 0.00 0.00
200 mm diameter 5.00 pcs 3,491.54 430.67 3,922.21 19,611.03
150mm diameter n/a pcs 0.00
0.00
Tee 0.00
200 mm diameter n/a pcs 0.00
150mm diameter n/a pcs 0.00
0.00 0.00
Supply and installation of PPR Pipe PN20 / PN 10 0.00 0.00
"Bugatti" Brand ; cPVC by: Flowguard 0.00 0.00
100 mm diameter PN-20 1,281.48 lm 1,811.49 137.35 1,948.84 2,497,398.57
75mm diameter PN-20 2,427.38 lm 1,235.34 93.20 1,328.54 3,224,861.02
65 mm diameter PN-20 470.24 lm 757.63 58.87 816.49 383,946.76
50 mm diameter PN-20 757.41 lm 513.08 19.63 532.71 403,476.36
40 mm diameter PN-20 245.34 lm 323.67 16.68 340.35 83,501.03
32 mm diameter PN-20 273.19 lm 200.28 14.71 214.99 58,733.41
25 mm diameter PN-20 550.24 lm 117.56 13.73 131.29 72,243.56
20 mm diameter PN-10 1,442.00 lm 75.58 11.78 87.35 125,962.56
15 mm diameter PN-10 1,382.66 lm 47.03 11.78 58.80 81,305.35
0.00 0.00
PPR Fittings 0.00 0.00
90 (1/4 bend) 0.00 0.00
100 mm diameter 155.00 pcs 1,735.94 151.08 1,887.02 292,487.77
75mm diameter 136.00 pcs 747.51 111.84 859.35 116,871.36
65 mm diameter 26.00 pcs 521.05 79.46 600.52 15,613.46
50 mm diameter 81.00 pcs 171.09 19.63 190.71 15,447.86
40 mm diameter 58.00 pcs 85.84 18.64 104.48 6,059.96
32 mm diameter 42.00 pcs 42.52 17.66 60.18 2,527.69
25 mm diameter 1,962.00 pcs 21.66 16.68 38.34 75,221.68
20 mm diameter 890.00 pcs 17.50 14.71 32.21 28,670.71
15 mm diameter 115.00 pcs 13.06 14.71 27.78 3,194.33
0.00 0.00
Elbow 45 degree (1/8 bend) 0.00 0.00
100 mm diameter 7.00 pcs 2,455.58 151.08 2,606.66 18,246.63
75mm diameter 20.00 pcs 1,377.46 95.16 1,472.62 29,452.32
65 mm diameter 10.00 pcs 969.87 79.46 1,049.33 10,493.30
50 mm diameter 10.00 pcs 272.54 19.63 292.17 2,921.70
40 mm diameter n/a pcs 0.00
32 mm diameter n/a pcs 0.00
25 mm diameter 16.00 pcs 56.47 16.68 73.15 1,170.43
20 mm diameter 10.00 pcs 33.39 14.71 48.11 481.07
15 mm diameter n/a pcs 0.00
0.00 0.00
Page 55 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 56 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 57 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 58 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
0.00 0.00
Check Valve Flange type - "Bermad" Brand 0.00 0.00
150 mm diameter 1.00 pcs 127,678.57 1,058.53 128,737.10 128,737.10
100 mm diameter 5.00 pcs 89,285.71 1,058.53 90,344.24 451,721.21
0.00 0.00
Float Valve Flange type - "Bermad" Brand 0.00 0.00
75mm diameter 4.00 pcs 29,163.94 909.41 30,073.35 120,293.39
0.00 0.00
Flexible Coupling Flange type 0.00 0.00
100 mm diameter n/a pcs 0.00
75mm diameter n/a pcs 0.00
0.00
Foot Valve Flange type - "Bermad" Brand 0.00
100 mm diameter n/a pcs 0.00
0.00
Wye Strainer Flange type - "Bermad" Brand 0.00 0.00
150 mm diameter 2.00 pcs 8,944.54 1,058.53 10,003.07 20,006.14
100 mm diameter n/a pcs 0.00
0.00 0.00
Meter Flange type - "Bermad" Brand 0.00 0.00
150 mm diameter 1.00 65,089.29 1,058.53 66,147.81 66,147.81
100 mm diameter 14.00 pcs 43,392.86 966.31 44,359.17 621,028.38
75mm diameter 3.00 pcs 29,631.07 964.35 30,595.42 91,786.26
65 mm diameter pcs 0.00 0.00
0.00 0.00
Water Meter Threaded type - "Bermad" Brand 0.00 0.00
50 mm diameter 4.00 set 18,515.18 964.35 19,479.53 77,918.11
32 mm diameter n/a set 0.00
25 mm diameter 7.00 set 5,654.73 964.35 6,619.08 46,333.56
0.00
Hose Bibb - "Kitz" Brand 0.00 0.00
15 mm diameter 35.00 set 580.36 258.99 839.35 29,377.19
0.00 0.00
Pressure Gauge 0.00 0.00
tap to 150 mm diamter pipe n/a pcs 0.00
tap to 100 mm diamter pipe n/a pcs 0.00
tap to 75 mm diamter pipe n/a pcs 0.00
tap to 65 mm diamter pipe n/a pcs 0.00
0.00
Pipe Hangers & Brackets n/a lot 0.00
0.00
Miscellaneous & Consumables 1.00 lot 118,359.20 118,359.20 118,359.20
0.00 0.00
Others 0.00 0.00
0.00 0.00
COLD WATERLINE SYSTEM 0.00 0.00
0.00 0.00
Supply and installation of HDPE Pipe "Atlanta"; "Thermovar" brand. 0.00 0.00
0.00 0.00
Tee Reducer 200 x 150 Ø 0.00 0.00
Tee Reducer 200 x 100 Ø 0.00 0.00
Tee Reducer 150 x 100 Ø 0.00 0.00
0.00 0.00
Slip on Flange 200 Ø 0.00 0.00
Slip on Flange 150 Ø 0.00 0.00
Blind Flange 150 Ø 0.00 0.00
0.00 0.00
Supply and installation of PPR Pipe PN20 / PN 10 0.00 0.00
"Bugatti" Brand ; cPVC by: Flowguard 0.00 0.00
0.00 0.00
Tee Reducer 100 x 75 Ø 0.00 0.00
Tee Reducer 100 x 40 Ø 0.00 0.00
Tee Reducer 75 x 50 Ø 0.00 0.00
Tee Reducer 75 x 40 Ø 0.00 0.00
Tee Reducer 75 x 32 Ø 0.00 0.00
Page 59 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 60 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Reducer 0.00
100 mm x 75 mm diameter 9.00 pcs 1,151.56 131.46 1,283.02 11,547.16
75 mm x 50 mm diameter 9.00 pcs 635.94 83.38 719.32 6,473.89
0.00 0.00
Pipes 0.00 0.00
150 mm diameter 316.00 lm 3,322.95 142.25 3,465.20 1,095,002.07
0.00 0.00
cPVC Fittings 0.00 0.00
Elbow 90 deg 0.00 0.00
150 mm 34.00 pcs 4,358.26 334.53 4,692.79 159,554.71
0.00 0.00
Elbow Reducer 0.00 0.00
32mm x 25mm 9.00 pcs 152.23 17.66 169.89 1,529.04
32mm x 20mm 10.00 pcs 152.23 17.66 169.89 1,698.93
32mm x 15mm 3.00 pcs 152.23 17.66 169.89 509.68
25mm x 15mm 341.00 pcs 85.94 16.68 102.62 34,992.08
25mm x 20mm 8.00 pcs 85.94 16.68 102.62 820.93
20mm x 15mm 9.00 pcs 29.46 14.71 44.18 397.61
0.00
Coupling Reducer 0.00
100mm x 75mm 5.00 pcs 1,151.56 131.46 1,283.02 6,415.09
100mm x 32mm 5.00 pcs 1,151.56 131.46 1,283.02 6,415.09
75mm x 63mm 5.00 pcs 635.94 87.31 723.25 3,616.25
75mm x 50mm 402.00 pcs 704.69 87.31 792.00 318,384.00
65mm x 40mm 8.00 pcs 493.53 79.46 572.99 4,583.93
50mm x 20mm 4.00 pcs 233.26 19.63 252.88 1,011.54
50mm x 15mm 4.00 pcs 233.26 19.63 252.88 1,011.54
25mm x 15mm 1,380.00 pcs 20.06 15.70 35.76 49,347.32
0.00 0.00
End Cap 0.00 0.00
150mm 4.00 pcs 910.71 94.18 1,004.89 4,019.57
100mm 4.00 pcs 883.93 94.18 978.11 3,912.43
75mm 7.00 pcs 510.71 59.84 570.55 3,993.88
0.00 0.00
Tee 0.00 0.00
150mm 8.00 pcs 5,843.75 16.68 5,860.43 46,883.43
0.00 0.00
Tee Reducer 0.00 0.00
50mm x 20mm 39.00 pcs 233.26 28.45 261.71 10,206.51
50mm x 15mm 7.00 pcs 233.26 28.45 261.71 1,831.94
25mm x 15mm 430.00 pcs 20.06 25.51 45.57 19,595.71
0.00 0.00
Bushing Reducer 0.00 0.00
150mm x 100mm 2.00 pcs 1,912.72 334.53 2,247.25 4,494.50
0.00 0.00
Female Threaded Adapter 0.00 0.00
50mm 12.00 pcs 1,171.21 19.63 1,190.83 14,289.96
25mm 23.00 pcs 257.81 16.68 274.49 6,313.29
20mm 4.00 pcs 166.96 14.71 181.68 726.71
15mm 4.00 pcs 125.22 14.71 139.94 559.75
0.00 0.00
Pressure Reducing Valve 0.00 0.00
150mm 1.00 158,736.98 1,058.53 159,795.51 159,795.51
0.00 0.00
Equalizing Valve 0.00 0.00
150mm 2.00 18,029.46 1,058.53 19,087.99 38,175.98
0.00 0.00
Flexible Connector 0.00 0.00
150mm 2.00 6,262.84 1,058.53 7,321.37 14,642.73
0.00 0.00
HDPE Fittings 0.00 0.00
Tee Reducer 0.00 0.00
200mm x 150mm 6.00 pcs 3,581.99 645.52 4,227.51 25,365.05
200mm x 100mm 5.00 pcs 3,438.20 645.52 4,083.71 20,418.57
0.00 0.00
Page 61 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 62 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 63 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
0.00 0.00
Floor Drain - "JPI" Brand ; "Metma" 0.00 0.00
50 mm diameter 1,020.00 pcs 781.25 51.02 832.27 848,913.21
0.00 0.00
Shower Drain - "JPI" Brand; "Metma" 0.00 0.00
50 mm diameter n/a pcs 0.00
0.00 0.00
Grease Trap - "JPI" Brand ; "Metma" 0.00 0.00
20 GPM n/a set 0.00
0.00 0.00
Concrete Sewer Manhole 22.00 set 10,464.29 2,766.50 13,230.79 291,077.29
0.00 0.00
Sewer Manhole Cover 22.00 set 22,321.43 1,844.33 24,165.76 531,646.70
"JPI" Brand ; "Metma" 0.00
0.00
Pipe Hangers & Brackets lot 0.00
0.00
Miscellaneous & Consumables 1.00 lot 243,416.22 243,416.22 243,416.22
0.00
Others 0.00
0.00 0.00
SEWER, LAUNDRY, KITCHEN WASTE - Outside the building 0.00 0.00
Supply and installation of HDPE Pipe 0.00 0.00
"Thermovar" Brand ; "Atlanta" 0.00
0.00
Pipe 300 Ø 82.74 lm 4,821.43 428.71 5,250.13 434,396.08
5,400.00 480.15 5,880.15
Wye Reducer 250 x 200 Ø 398.70 398.70
Wye Reducer 250 x 100 Ø 0.00
Tee Equal
150mm 4.00 pcs 2,961.60 582.42 3,544.02 14,176.09
0.00
End Cap 0.00
150mm 4.00 pcs 974.40 109.78 1,084.18 4,336.73
0.00
0.00
Coupling Reducer 0.00
150mm x 100mm 1.00 pcs 806.40 357.08 1,163.48 1,163.48
0.00
Central Grease Trap w/ Manhole Cover 1.00 unit 40,700.00 74,151.00 114,851.00 114,851.00
0.00
SEWER, LAUNDRY, KITCHEN WASTE & VENT SYSTEM - Inside the building 0.00
Supply and installation of Cast Iron Pipes Hubless 0.00
Similar to "TYLER" Brand; "Anako" 0.00
0.00
Tee Reducer 100 x 50 Ø 470.00 pcs 390.63 94.18 484.80 227,857.68
0.00 0.00
COUPLING REDUCER 0.00 0.00
Reducer 250x200 Ø 2.00 pcs 1,752.25 304.12 2,056.37 4,112.73
Reducer 250x100 Ø 2.00 pcs 1,331.69 417.92 1,749.61 3,499.21
Reducer 100 x 50 Ø 0.00 0.00
0.00 0.00
Wye Reducer 150 x 50 Ø 0.00 0.00
300mm x 250mm 2.00 pcs 17,092.25 627.86 17,720.11 35,440.21
200mm x 100mm 1.00 pcs 1,783.19 231.53 2,014.71 2,014.71
150mm x 75mm 49.00 pcs 835.44 82.41 917.85 44,974.56
0.00 0.00
Ceiling Cleanout 250 Ø 6.00 pcs 2,686.94 304.12 2,991.05 17,946.32
Ceiling Cleanout 200 Ø 14.00 pcs 1,698.94 189.34 1,888.28 26,435.88
Ceiling Cleanout 75 Ø 1.00 pcs 324.31 67.69 392.00 392.00
Ceiling Cleanout 50 Ø 1.00 pcs 252.56 61.80 314.37 314.37
0.00
End Cap 100Ø 0.00
Page 64 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 65 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 66 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 67 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Balcony Drain 50 Ø
Trench Grating Cover (Traffic Type)
Trench Grating Cover
0.00 0.00
Trench & Grating 0.00 0.00
300 mm 45.00 pcs 8,482.14 124.59 8,606.73 387,302.95
0.00 0.00
Ground Cleanout 0.00 0.00
250 mm 1.00 pcs 5,950.89 364.95 6,315.84 6,315.84
0.00 0.00
Drains 0.00 0.00
Balcony Drain 0.00 0.00
75 mm 264.00 pcs 1,308.04 59.84 1,367.88 361,119.00
0.00 0.00
Scupper Drain 0.00 0.00
75 mm 10.00 pcs 1,308.04 59.84 1,367.88 13,678.75
0.00 0.00
Stainless Coupler 0.00 0.00
300 mm 322.00 pcs 4,638.39 487.57 5,125.96 1,650,560.50
200 mm 183.00 pcs 1,237.50 184.44 1,421.94 260,214.56
0.00 0.00
Floor Cleanout Similar to "JPI Brand"; "Metma" 0.00 0.00
200 mm 12.00 pcs 2,371.43 502.29 2,873.71 34,484.57
0.00 0.00
Perforated Pipe Fittings 0.00 0.00
End Cap 0.00 0.00
200 mm 14.00 pcs 852.86 119.69 972.54 13,615.63
0.00 0.00
Wye 0.00 0.00
200 mm 13.00 pcs 1,010.71 144.21 1,154.93 15,014.07
0.00 0.00
Elbow 45 deg
200 mm 19.00 pcs 546.43 189.34 735.77 13,979.59
0.00 0.00
AIRCON DRAIN SYSTEM 0.00 0.00
Supply and installation of PVC Pipes Series 1000 0.00 0.00
"Neltex" "Emerald" Brand Series 1000 0.00 0.00
75mm diameter 78.00 lm 135.60 72.60 208.20 16,239.32
50 mm diameter 210.97 lm 63.24 35.32 98.56 20,793.73
25 mm diameter 609.00 lm 22.13 45.13 67.25 40,955.25
0.00 0.00
PVC Fittings 0.00 0.00
Elbow 90 (1/4 bend) 0.00 0.00
75mm diameter 5.00 pcs 37.19 72.60 109.79 548.93
50 mm diameter 29.00 pcs 20.64 42.19 62.83 1,822.08
25 mm diameter 221.00 pcs 10.36 45.13 55.48 12,261.55
0.00 0.00
Elbow 45 (1/8 bend) 0.00 0.00
75mm diameter 6.00 pcs 29.90 54.94 84.84 509.04
50 mm diameter 26.00 pcs 16.47 42.19 58.66 1,525.18
25 mm diameter 61.00 pcs 10.36 44.14 54.50 3,324.50
0.00 0.00
Wye 0.00 0.00
75mm diameter 1.00 pcs 63.98 74.56 138.54 138.54
50 mm diameter 8.00 pcs 26.87 63.77 90.63 725.07
0.00 0.00
Wye Reducer 0.00 0.00
75mm x 50mm diameter 12.00 pcs 75.00 74.56 149.56 1,794.75
0.00 0.00
Rubber Insulation 1" thick 0.00 0.00
75mm diameter n/a lm 0.00
50 mm diameter 174.00 lm 140.70 110.86 251.55 43,770.32
Page 68 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 69 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Electrode Water Level Indicator 1.00 set 5,282.55 1,591.07 6,873.62 6,873.62
Electrode Connection 0.00
Paddle Flange 1.00 lot 154,464.29 15,178.57 169,642.86 169,642.86
0.00
Supply and installation of PLUMBING FIXTURES 0.00
(owner has the option to supply) 0.00 0.00
Water Closet 488.00 set OSM 1,881.62 1,881.62 918,228.64
Lavatory 479.00 set OSM 1,567.69 1,567.69 750,922.31
Urinal 32.00 set OSM 1,881.62 1,881.62 60,211.71
Bathtub 396.00 set OSM 896.66 896.66 355,077.64
Shower 428.00 set OSM 896.66 896.66 383,770.79
Kitchen Sink n/a set 0.00
Slop Sink 10.00 set OSM 469.91 469.91 4,699.11
0.00 0.00
Supply and installation of GRP/FRP Water Tank 0.00 0.00
Similar to "PIPECO" or "POTAGLASS" 0.00 0.00
(owner has the option to supply) BY OTHERS set By Gencon
For Treated Water
Page 70 of 73
Total Cost Total Direct Cost
ITEM WORK ITEM DESCRIPTION AEC UNIT Material Cost Labor Cost Php/unit Php
QUANTITY Php/unit Php/unit
Page 71 of 73
PROJECT : PROPOSED MARRIOTT HOTEL BORACAY GATEWAY
LOCATION : MALAY NABAS, AKLAN
DEVELOPER : SMPI BVRI
SUBJECT : MEPF WORKS
DATE : APRIL 5, 2018
MAT'L. LABOR
ITEM DESCRIPTION QTY UNIT TOTAL AMOUNT
UNIT COST TOTAL COST UNIT COST TOTAL COST
4 Temporary Facilities
a. Site Office 1.00 lot 330,235.65
b. Warehouse / Storage for OSM 1.00 lot 60,327.39
c. Quarters
d. Staging Area
5 Temporary Utilities
a. Power Consumptions 1.00 lot 117,764.72
b. Water Consumption 1.00 lot 71,647.49
c. Telephone/Communication 1.00 lot 105,414.72
d. Security Service 1.00 lot 134,129.91
7 Other Items
a. Site Management 1.00 lot 5,118,960.75
b. Safety 1.00 lot 1,405,723.32
c. Temporary Tools/Equipment 1.00 lot 316,846.73
d. Disposal/Sanitation 1.00 lot 173,491.56
e. Meetings/Reports/Manuals 1.00 lot 416,652.19
f. Deliveries 1.00 lot 1,317,384.68
g. House Keeping 1.00 lot 159,967.17
h. Check-up During Warranty Period 1.00 lot 58,712.81
i. Testing & Commissioning 1.00 lot 211,950.47
j. Fire Safety Inspection Certificate 1.00 lot 589,860.45
k. Permit (Installation of Equipment) 1.00 lot 365,142.86
l. All Insurances (Staff/Workers Accident Insurance) 1.00 lot 1,034,835.77
m. Contractor's Tax 1.00 lot 1,101,858.25
VAT 1,866,154.64
196,814,592.89